  • Registered Users Posts: 4,322 ✭✭✭m17


    The m17 at ballinphuil corofin over the past 14 months part one2016-08-30_05-48-06_zpslqg14dzl.jpg22016-08-30_05-48-29_zpsqt3ulkcb.jpg32016-08-30_05-49-16_zpsxi1jyxjk.jpg42016-08-30_05-49-44_zpsaq47mgc9.jpg52016-08-30_05-50-42_zpsmwgitnqr.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    Part two 62016-08-30_05-51-14_zpsyyfkim30.jpg72016-08-30_05-51-31_zpsvxxwyhmi.jpg82016-08-30_05-51-59_zps3ckoijab.jpg92016-08-30_05-53-49_zpsdvmhacde.jpg102016-08-30_05-54-15_zpsft5giwng.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    Part three 112016-08-30_05-55-17_zpsuyeydqxv.jpg122016-08-30_05-55-45_zpsrbbuspwd.jpg132016-08-30_05-56-16_zpsha5cmbaq.jpg142016-08-30_05-57-07_zpsro8dkagq.jpg152016-08-30_05-57-27_zpssrpwjl7x.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    Part four 162016-08-30_05-58-01_zps3bdcrwly.jpg172016-08-30_05-59-31_zpsk9l2qqzx.jpg182016-08-30_06-00-20_zpsovhfurus.jpg192016-08-30_06-00-54_zpsyy4qtwml.jpg


  • Closed Accounts Posts: 2,341 ✭✭✭D Trent


    m17 wrote: »
    Part four 162016-08-30_05-58-01_zps3bdcrwly.jpg172016-08-30_05-59-31_zpsk9l2qqzx.jpg182016-08-30_06-00-20_zpsovhfurus.jpg192016-08-30_06-00-54_zpsyy4qtwml.jpg

    For what reason did they decide against having the Motorway going up over the hill.
    I mean the cost to blast and cut through I hill like that I'm sure is astronomical


  • Advertisement
  • Registered Users Posts: 272 ✭✭Goofy


    D Trent wrote: »
    For what reason did they decide against having the Motorway going up over the hill.
    I mean the cost to blast and cut through I hill like that I'm sure is astronomical

    I'm guessing the slope of the hill would be too steep. Cut out the top half of the slope and use the material removed to make a ramp at the bottom half of the slope. Turns a steep hill into a gradual one.


  • Registered Users Posts: 4,322 ✭✭✭m17


    D Trent wrote: »
    For what reason did they decide against having the Motorway going up over the hill.
    I mean the cost to blast and cut through I hill like that I'm sure is astronomical

    At the start it was going to take a year for the blasting to take place,the did it in 7 months,it also took 61 blasts to remove all the rock and every bit has been used,it cost about 24 million


  • Moderators, Science, Health & Environment Moderators Posts: 4,963 Mod ✭✭✭✭spacetweek


    D Trent wrote: »
    For what reason did they decide against having the Motorway going up over the hill.
    I mean the cost to blast and cut through I hill like that I'm sure is astronomical
    For a road to qualify as a motorway, it must have gentle gradients. If the route would make the hill too steep you must flatten it.


  • Registered Users Posts: 4,322 ✭✭✭m17


    The m17 at carthymore looking towards tuam 31/08/16IMAG2747_zps74txesau.jpg]looking towards rathmorrisyIMAG2748_zpsupwddu7d.jpg


  • Registered Users Posts: 459 ✭✭Czhornet


    D Trent wrote: »
    For what reason did they decide against having the Motorway going up over the hill.
    I mean the cost to blast and cut through I hill like that I'm sure is astronomical

    Rock is a valuable commodity on a road job, it is used for the tarmac and the concrete on the job, Most of the road jobs I have been on, the rock cut has been over blasted, by that I mean extra land might have been bought off the farmer to allow for more rock extraction and processing.

    The M7 at Ballinahinch was 50 metres deep at its deepest point!


  • Advertisement
  • Registered Users Posts: 4,322 ✭✭✭m17


    The m17 at ballybanagher 25/01/152016-07-29_01-11-48_zpsaxg9asif.jpg 01/09/16IMAG2540_zpssulji4qv.jpg


  • Registered Users Posts: 1,090 ✭✭✭dok_golf


    Would anyone know when the new bridge near Coldwood N.S. on old N6 is due to open?


  • Registered Users Posts: 4,322 ✭✭✭m17


    dok_golf wrote: »
    Would anyone know when the new bridge near Coldwood N.S. on old N6 is due to open?

    It's a old bridge at this stage was to open last March but it's been delayed about six times,there waiting on eircom who are laying Cable's in the coldwood area opening date now looks like the end of October 16


  • Registered Users Posts: 4,322 ✭✭✭m17


    The townland of gortoe where sisk have started work on the last bridge on the m18 1.5kms south of rathmorrisyIMAG2756_zpsm2dpryyw.jpg


  • Registered Users Posts: 18,112 ✭✭✭✭JCX BXC


    What is that mess that is a bridge south of Kilcolgan? It's an absolute mess, shocking layout.


  • Registered Users Posts: 16,686 ✭✭✭✭Zubeneschamali


    Carnacalla wrote: »
    It's an absolute mess, shocking layout.

    Do you mean it is a mess now during works, or that the finished layout will be a mess?


  • Registered Users Posts: 3,206 ✭✭✭ratracer


    Carnacalla wrote: »
    What is that mess that is a bridge south of Kilcolgan? It's an absolute mess, shocking layout.

    As a regular user of that bridge ( I presume you mean at Kiltiernan) I agree, the design of it is terrible. I would guess that the designers deliberately introduced the curve to slow traffic approaching it, but it is very poorly done.


  • Registered Users Posts: 4,322 ✭✭✭m17


    The 8th flyover over the m17 at cloontooa will open 27/09/16IMAG1550_zpsacmvayuc.jpgtop of flyoverIMAG1551_zps5bdl0ljg.jpglooking towards rathmorissyIMAG1552_zpszsiezhvq.jpglooking towards tuamIMAG1553_zpsbpupfjwn.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The 9th flyover over the m17 at the townland of killeelaun will open on 4/10/16IMAG0001_zpsk6bakxui.jpgtop of the flyoverIMAG0002_zps4w5mzg3u.jpglooking towards rathmorissyIMAG0003_zps0aetzdcj.jpglooking towards tuamIMAG0004_zpssjawyiyi.jpgthe flyoverIMAG0006_zps7hzx1zdr.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The last 1km of the m17 04/09/16IMAG1535_zpskhe5uomw.jpgIMAG1536_zpsowdml7vl.jpgIMAG1537_zps470b3bpk.jpgIMAG1538_zpsbk938uce.jpgIMAG1539_zpsuyiqlrdi.jpgthis where the kilmore roundabout will beIMAG1542_zpsuztb0dmz.jpg


  • Advertisement
  • Registered Users Posts: 4,322 ✭✭✭m17


    Bridge over the nanney river on the tuam bypass beams going in to place at the end of the month 05/09/16IMAG1564_zpsyplkud8j.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The m17 at ballybanagher corofin 22/03/152016-09-07_12-55-23_zpsgvtqkufb.jpg05/09/162016-09-07_12-58-33_zpsfwsq9qkb.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The townland of castlelambert 07/09/16 the start of the m17 gets its frist layer of tarmac looking towards rathmorissy 1.5kmsIMAG1568_zpsqra6kp0w.jpglooking towards tuam 24kmsIMAG1569_zps7bzasben.jpg


  • Registered Users Posts: 2,554 ✭✭✭Irish_rat


    m17 wrote: »
    Ariel view of rathmorrisy 08/08/16

    :-o

    Nice work lad, the road is really taking shape now. You may be the new kid on the block but you've taken over the forum in a good way.

    Insane updates thanks


  • Registered Users Posts: 4,322 ✭✭✭m17


    Irish_rat wrote: »
    :-o

    Nice work lad, the road is really taking shape now. You may be the new kid on the block but you've taken over the forum in a good way.

    Insane updates thanks

    Cheers mate


  • Registered Users Posts: 4,322 ✭✭✭m17


    Concern over plans to downgrade main county roads when motorway openshttp://connachttribune.ie/concern-over-plans-to-downgrade-main-county-roads-011/


  • Registered Users Posts: 16,686 ✭✭✭✭Zubeneschamali


    m17 wrote: »
    Concern over plans to downgrade main county roads when motorway opens

    Concerns have been raised over the reclassifications, which will result in increased maintenance expenses for the County Council’s roads department.

    Seems reasonable to me.


  • Registered Users Posts: 2,277 ✭✭✭mackerski


    m17 wrote: »
    Concern over plans to downgrade main county roads when motorway openshttp://connachttribune.ie/concern-over-plans-to-downgrade-main-county-roads-011/

    N18 "upgraded" to a National Primary route? Even though it already is one?


  • Registered Users Posts: 4,322 ✭✭✭m17


    mackerski wrote: »
    N18 "upgraded" to a National Primary route? Even though it already is one?

    The would want to take a look at this forum before they start printing stuff like that there still saying early 2018,that has changed to nov 17


  • Advertisement
  • Registered Users Posts: 4,322 ✭✭✭m17


    The underpass on the weir road tuamIMAG1554_zpsjpyptqln.jpg