Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

N4 - Mullingar to Rooskey [route options published]

2456

Comments

  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    No they are not all connected. There is no motorway between Naas and Dublin and between Leixlip and Dublin.

    Sligo must be connected too and on to Letterkenny with a motorway through Donegal.

    The N7 is near-motorway standard between Naas and Dublin, is 6 lanes and will be upgraded to Motorway within the next few years, so is hardly a good example..


  • Registered Users, Registered Users 2 Posts: 23,901 ✭✭✭✭Kermit.de.frog


    "Near" is not good enough. M7 and M4 should be merged in to one 12 lane highway approaching the M50 and with a super junction between the existing junctions.

    Then we can detrunk the existing roads.


  • Registered Users, Registered Users 2 Posts: 69,538 ✭✭✭✭L1011


    "Near" is not good enough. M7 and M4 should be merged in to one 12 lane highway approaching the M50 and with a super junction between the existing junctions.

    Then we can detrunk the existing roads.

    What do you propose to demolish for this fantasy?


  • Closed Accounts Posts: 208 ✭✭jhenno78


    "Near" is not good enough. M7 and M4 should be merged in to one 12 lane highway approaching the M50 and with a super junction between the existing junctions.

    Just to check; do you want traffic to actually move or do you think it'd be better for everyone to just sit in their cars until the next day, rather than getting home?


  • Registered Users, Registered Users 2 Posts: 23,901 ✭✭✭✭Kermit.de.frog


    There is already a reserved alignment I seem to remember approaching the M50 near Park West. We just make it a little bigger. CPO what needs CPOing.


  • Registered Users, Registered Users 2 Posts: 69,538 ✭✭✭✭L1011


    There is already a reserved alignment I seem to remember approaching the M50 near Park West. We just make it a little bigger. CPO what needs CPOing.

    That is long since gone. There is no reserved alignment anymore and what was there was for 2x2.

    Identify the route and the properties to CPO and we can work out a rough cost.


  • Registered Users, Registered Users 2 Posts: 8,867 ✭✭✭SeanW


    It really needs to be Motorway to the N4-N5 split - only after that does the traffic divide roughly in half. Before that IIRC the numbers do justify Motorway.


  • Registered Users, Registered Users 2 Posts: 5,890 ✭✭✭Charles Babbage


    jhenno78 wrote: »
    Every city is connected to a motorway.


    except Derry, of course.


    Mullingar to Longford probably warrents motorway or at least HQDC like south of Mullingar, beyond Longford 2+2.


  • Registered Users, Registered Users 2 Posts: 13,717 ✭✭✭✭Geuze


    "Near" is not good enough. M7 and M4 should be merged in to one 12 lane highway approaching the M50 and with a super junction between the existing junctions.

    Then we can detrunk the existing roads.

    Our aim should be to discourage car use, and encourage modal shift in cities.

    Building 12 lane roads is not the future.


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    MOD: A bit late but can we please return to the N4 scheme and not the M4/M7 in Dublin or building ridiculously overspecced roads. Please bear in mind that the N4 between Mullingar and Longford carries 13,000 vehicles a day, and comparing it to I405 is really of no benefit to the discussion.


  • Registered Users, Registered Users 2 Posts: 8,867 ✭✭✭SeanW


    Geuze wrote: »
    Our aim should be to discourage car use, and encourage modal shift in cities.

    Building 12 lane roads is not the future.
    Your aim is to discourage car use.


    The aim of most people should be is to provide an appropriate transport policy that includes public transport, other non-motorised users etc. as part of an inclusive transport policy that applies the correct solution to the correct problem. I.E. bypasses of towns, widening of motorways that are maxed out. It should also include DART expansion/Metro in Dublin, Luases in the other cities.



    There may not be a need for a 12 lane motorway right now, but to categorically state that one should never be built anywhere, under any circumstances ... is questionable to say the least.


  • Registered Users Posts: 2,325 ✭✭✭MayoSalmon


    Any update on this scheme.

    What movement on it can we expect in 2019?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    MayoSalmon wrote: »
    Any update on this scheme.

    What movement on it can we expect in 2019?
    Should expect initial planning and route selection to start in early 2019.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    marno21 wrote: »
    Should expect initial planning and route selection to start in early 2019.
    Confirmed by Shane Ross in the Seanad during the week that this will proceed to planning & design in early 2019 having passed pre appraisal stage.

    Plan is for 52km of upgrade between the Mullingar bypass and Rooskey bypass.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    I stopped outside mullingar for a bit dinner the other day and took picture of an article about the road in the local paper


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Tender issued for consultants for Phases 1-4 for this scheme:

    https://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=149743&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/publictenders

    Expected €6.5m, 44 month contract.


  • Registered Users, Registered Users 2 Posts: 4,164 ✭✭✭shanec1928


    how many years off are we till shovels are in the ground?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    shanec1928 wrote: »
    how many years off are we till shovels are in the ground?
    Probably won't start before 2025 being realistic.


  • Registered Users, Registered Users 2 Posts: 1,662 ✭✭✭BaronVon




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    infacteh wrote: »

    Implies submission to ABP in late 2022/early 2023. That’s assuming no setbacks. A long way to go on this one


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 569 ✭✭✭annfield1978


    AECOM ROD have picked this up subject to alcatel


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Registered Users, Registered Users 2 Posts: 569 ✭✭✭annfield1978




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Any confirmation of spec?
    Motorway or 2+2? Should be M in my opinion. North west of the country needs at least one motorway, though I know it'll never be that spec as far as Sligo.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    spacetweek wrote: »
    Any confirmation of spec?
    Motorway or 2+2? Should be M in my opinion. North west of the country needs at least one motorway, though I know it'll never be that spec as far as Sligo.
    Long way away from that yet, it's only just started planning.

    The northern end will definitely be 2+2 anyway, but there is a case for extending Type 1 DC from Mullingar, possibly as far as Longford although traffic figures are around 12k there.

    There will be question marks about it being motorway due to the section of N4 south of Mullingar that isn't up to standards. The service areas on the Mullingar bypass are an issue too.


  • Moderators, Sports Moderators Posts: 12,182 Mod ✭✭✭✭Cookiemunster


    spacetweek wrote: »
    Any confirmation of spec?
    Motorway or 2+2? Should be M in my opinion. North west of the country needs at least one motorway, though I know it'll never be that spec as far as Sligo.


    Nowhere needs a motorway unless traffic volumes say it's necessary. If 2+2 is enough to meet future requirements then that is what should be built.


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    Nowhere needs a motorway unless traffic volumes say it's necessary. If 2+2 is enough to meet future requirements then that is what should be built.

    Sections of inter urbans built have lower aadt but got built to make a full e2e motorway.

    In the case of sligo theres probably no need and not going to happen though


  • Registered Users Posts: 3,847 ✭✭✭roadmaster




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    roadmaster wrote: »
    Good stuff. Website was overdue on this so good to see it up and running

    This route would be quite transformative for the area - 500 at grade junctions on the existing route is madness.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 8,867 ✭✭✭SeanW


    We just have to cross our fingers and hope that the Greens aren't able to kill it.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Traffic counts underway:
    Traffic Surveys get underway on Monday 21st September as part of the N4 Mullingar to Longford (Roosky) project. Tracsis Traffic Data Ltd. are undertaking these surveys on behalf of Westmeath County Council and will commence setting up their survey equipment this weekend, 18th September. It is planned to have these surveys completed and survey equipment removed by the 9th October.

    Whilst the majority of the survey work will be undertaken along the N4 corridor between Mullingar and Longford (Roosky) we would like the public to know that the survey team will be on the ground in counties Longford, Leitrim, Roscommon and Westmeath. Survey locations will include National Primary and Secondary Roads including the N4, N5, N52, N55 and N63, and also some other regional and local roads.


  • Registered Users, Registered Users 2 Posts: 4,037 ✭✭✭Cosmo Kramer


    Are they counting numbers of vehicles? Would such a survey not produce questionable data given the way many of us are leading our lives at present? I'm pretty sure if my usual daily commute was surveyed at the moment the results would be all over the place, I and many others haven't done the commute since mid March due to the current working from home policies.


  • Registered Users, Registered Users 2 Posts: 4,164 ✭✭✭shanec1928


    Are they counting numbers of vehicles? Would such a survey not produce questionable data given the way many of us are leading our lives at present? I'm pretty sure if my usual daily commute was surveyed at the moment the results would be all over the place, I and many others haven't done the commute since mid March due to the current working from home policies.
    they are counting traffic im afraid several of those counter ropes along various places.


  • Registered Users, Registered Users 2 Posts: 69,538 ✭✭✭✭L1011


    Its far from ideal to do it now, but its required as part of the planning process and they will be able to apply some correction factor based on the drop on other fixed counters.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    L1011 wrote: »
    Its far from ideal to do it now, but its required as part of the planning process and they will be able to apply some correction factor based on the drop on other fixed counters.

    Drive through Virginia last week over a traffic counter. The place was empty compared to previous covid the same situation as n4


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Registered Users, Registered Users 2 Posts: 7,037 ✭✭✭Pete_Cavan


    I was thinking before that the N4 should be extended on a route between Newtown Forbes and Termonbarry and then split. The N4 going north to join the Roosky dualer and a short section of SC N5 continuing west to join the decent SC west of Termonbarry which will feed into the Balla to Scramoge project. It would involve crossing the Shannon twice but would also incorporate a bypass of Termonbarry and see N5 traffic continue on a higher quality quality N4 for longer, rather than getting dizzy on all the roundabouts around Longford.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    It always amazes me how they can show maps on a really outdated base map. The N5 Longford bypass is not shown on the routes map on the consultation website (though it is in the Information Brochure PDF).

    Still no word on what standard this will be built to.


  • Advertisement
  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    spacetweek wrote: »
    It always amazes me how they can show maps on a really outdated base map. The N5 Longford bypass is not shown on the routes map on the consultation website (though it is in the Information Brochure PDF).

    Still no word on what standard this will be built to.

    I could have and probably did pick this up wrong but Are they not going with type 2 dual carriageway and renaming that type of road Expressway


  • Registered Users Posts: 829 ✭✭✭DumbBrunette


    Agreed. I made a submission stating that they should include a direct link between the N5 and the new N4, otherwise N5 traffic will just rat run around Longford trying to get to the nearest junction to join the N4.


    Pete_Cavan wrote: »
    I was thinking before that the N4 should be extended on a route between Newtown Forbes and Termonbarry and then split. The N4 going north to join the Roosky dualer and a short section of SC N5 continuing west to join the decent SC west of Termonbarry which will feed into the Balla to Scramoge project. It would involve crossing the Shannon twice but would also incorporate a bypass of Termonbarry and see N5 traffic continue on a higher quality quality N4 for longer, rather than getting dizzy on all the roundabouts around Longford.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    Drove this route yesterday. The arch bridge at the western end of the bypass looks very very tight for a dual carriageway. Will the bridge have to be knocked or will they be able to break away the rock embankment to make room and carry out some works on the bridge to strengthen it and keep it in place?


  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    roadmaster wrote: »
    Drove this route yesterday. The arch bridge at the western end of the bypass looks very very tight for a dual carriageway. Will the bridge have to be knocked or will they be able to break away the rock embankment to make room and carry out some works on the bridge to strengthen it and keep it in place?

    Looks the right width for 2+2 me.

    Seems there is a couple of feet each side could be taken away to make it wide enough for HQDC/Motorway.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    Looks the right width for 2+2 me.

    Seems there is a couple of feet each side could be taken away to make it wide enough for HQDC/Motorway.

    Maybe its just the way I was looking but i taught with an outside lane pushed further out the clearance for artics could be tight


  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    roadmaster wrote: »
    Maybe its just the way I was looking but i taught with an outside lane pushed further out the clearance for artics could be tight

    Yeah, I know what you mean.

    2+2, from memory, is the same overall width as the old WS2 roads.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,037 ✭✭✭Pete_Cavan


    marno21 wrote: »
    Route options published:

    Virtual consultation: https://consultation.n4mullingartolongford.ie/

    Consultation runs until tomorrow for those interested in making a submission.


  • Registered Users, Registered Users 2 Posts: 1,753 ✭✭✭KrisW1001


    Yeah, I know what you mean.

    2+2, from memory, is the same overall width as the old WS2 roads.

    Sort-of. While 2+2 is usually a bit wider than the old WS2, certain sections of WS2 road can actually be wider than a 2+2.

    2+2 = 15.5 metres (3.5+3.5 each way, 1.5 central median), or 16.5 with the hard-strips on each side included.

    WS2 = 15.0 metres (5 metre lane each way, plus a 2.5 m shoulder on each side). But, for sections with large number of junctions, this was allowed to increase to 17.0 metres in order to to allow for right-turning islands.


  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    KrisW1001 wrote: »
    Sort-of. While 2+2 is usually a bit wider than the old WS2, certain sections of WS2 road can actually be wider than a 2+2.

    2+2 = 15.5 metres (3.5+3.5 each way, 1.5 central median), or 16.5 with the hard-strips on each side included.

    WS2 = 15.0 metres (5 metre lane each way, plus a 2.5 m shoulder on each side). But, for sections with large number of junctions, this was allowed to increase to 17.0 metres in order to to allow for right-turning islands.

    Thanks very much for that info, I never knew the exacts.


  • Registered Users Posts: 829 ✭✭✭DumbBrunette


    Does anyone know when a preferred route corridor might be selected for this, or do the existing options have to be 'refined' first?



  • Registered Users, Registered Users 2 Posts: 6,323 ✭✭✭highdef


    Bump!!!! Also wondering when there will be an update on this now that it's been stated that it's still very much on the roadmap, pun intended.