Cost of shed

135

Comments

  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    You claim back vat first. Unregistered farmers can claim back vat on structural installation such as water, fencing, roadways and buildings

    Shed costs 50k. You claim vat back its approx 5950 euro. The grant is calculated off the lower of the departments fixed costs or your receipts for the cost. If you paid 48k+vat they will give you 26,430 approximately in a grant, if you paid 40k+vat they will give you 24k in a grant. However you are allowed to include your own labour and machinery use so you can technically pad out the cost.

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    15 years ago it was about 10-15% of the price of a grand approved shed. They weigh the steel in and out and you pay on the extra weight.

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    Unfortunately not true, u pay per kg, full weight, it's over 1k a tonne now,



  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    8x4 rsj is 23kg per meter, lads getting sheds galvanised are getting it for around 90 cents a kg I think at moment so Ur looking at roughly 20 euro plus vat per meter of steel, u add on for plates and cleates extra,



  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    We think that shed is 6X3 RSJ so it would cost about 700 euro

    If it was 8X4 it would cost 900ish at my calculations so from your pricing estimate

    Slava Ukrainii



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    Be more than that, u have 60 foot on back 72 foot on front and 6 X 22 for top, 80 meters of steel give 100kg for plates u be looking 1900 plus vat



  • Posts: 4,503 ✭✭✭ [Deleted User]


    Blocks are looking good again 😄



  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    😂, Picked load out of pioneer today 1euro 1cent a kg plus vat, it's gone up alot in last few years



  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    Divide by two the shed is 20X32. There is two on the trailer

    3X10 at back, 3X12 at front and 3X22 on top.

    If I was getting everything on the trailer for 1600 I be taking it as fast As I could

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    Good man bass, I was lookin at the trailer, Ur spot on regards the add, that's what I get for quickly glancing over it



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    Usually I try not to get caught twice in a row. 2 ba by 20' galvanized for sub 2.5k it would not be bad value

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 848 ✭✭✭dohc turbo2


    Ya steel was black by him at start so surly knock 200 off to paint , if u got for 1400 and give 850 for galvanised and carriage it be grand out



  • Registered Users, Registered Users 2 Posts: 5,379 ✭✭✭enricoh


    I'd say you would be doing well to buy the steel at e1600, before doing any cutting, welding, spraying. I'd take his hand off tbh. Think timber has dropped back a good bit dunno about sheeting.



  • Registered Users, Registered Users 2 Posts: 5,459 ✭✭✭Grueller


    Neighbour here is a joiner by trade and showed me a text that he got from his supplier a fortnight ago. It varies from species to species, but basically timber up 15-20% across the board come January.



  • Registered Users, Registered Users 2 Posts: 1,404 ✭✭✭DJ98


    Another question on shed construction, put in a handling yard for sheep a couple of years ago and now for comfort more than anything want to roof just over the race where most of the handling takes place. It's 14 ft wide and 45 ft long and joining onto existing shed. Block wall already in place 5 ft high around it. Question is would it work to build this wall up to 7ft high with 4 inch blocks and then just roof across to it or would this wall be unstable with wind catching it as it would be open at both ends?



  • Registered Users, Registered Users 2 Posts: 1,622 ✭✭✭cjpm


    Plenty of sheds extended over the years in farmyards all over the country done just as you describe.

    Assuming the existing is 4” block on flat and you are going to continue same to 7ft.

    Ensure the rafters (or trusses) are physically tied down to the block wall so they can’t lift in a storm. Usually using some thing similar to a 50x50x5 angle iron about 3ft long with a hole at each end. Put a bolt through the wall at the bottom end and bolt to the rafter (or truss) on top.



  • Registered Users, Registered Users 2 Posts: 2,478 ✭✭✭older by the day


    Most cattle sheds have been built around here in the 80s with cavity blocks, timber sitting between the top row, angle iron or even strong wire bolting them down to a few rows below. They are still there doing the finest.

    It's the sheeting that I'm particular about. I got caught putting cheaper sheets over cattle, it had rotted around the nail holes after ten years. I had to replace it all. Eeerrr



  • Registered Users, Registered Users 2 Posts: 2,230 ✭✭✭Who2


    Don’t have a roof any lower than 11 foot at the lowest point. I know it’s a handling area but at 7 foot it would be horrible to work in. 11 foot will get any mid sized tractor in if you ever want to change it or do something else with it. I seen a lad done similar to what your saying and he just built to seven foot but built pillars every 16 foot and ran a purlin between to carry the rafters. It worked a treat , let in light and air and didn’t cost a fortune.



  • Registered Users, Registered Users 2 Posts: 1,404 ✭✭✭DJ98


    11 foot wouldn't work for me as the existing shed is only 10ft and wouldn't like a valley between 2, wouldn't need machinery access as its narrow wouldn't have much other use and the handling unit is permanently fixed in place so only 6 ft either side



  • Registered Users, Registered Users 2 Posts: 7 SHS100


    Folks,

    Apologies for hijacking here. Just looking if anyone has any work done recently or have got figures around the construction of a slatted house.

    I am in the early days of planning to move forward and replace the existing winter housing facilities with a new slatted shed with large creep/loose area.

    I would be going for the TAMS

    5 Bay opened at one side

    Double tank with two rows of 16' 6" tractor slats. Tank to be 8ft deep

    Large creep area/loose area to the back of pens, approx 30ft wide (from pen to rear wall of shed)

    Mass concrete walls 8ft high

    Steel structure to be galvanised, with timber purlins and fibre cement sheeting. Horizontal sheeting to be vented type.

    Lights/Sockets and provision for calving & security cameras

    Drinking troughs


    I suppose what I am really interested in is cost of 1) tank with slats 2) Fab and erect of shed structure 3)Concrete floors and silage apron.

    I am not too concerned with internal steel/gates/barriers as I have some of that stuff already


    I dont want to be annoying my builder for prices at the moment as I am in the early days.


    Appreciate any knowledge of feedback you may have



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 2,836 ✭✭✭Cavanjack


    Easy work out the cost of your tank. Length of walls by the height by 300mm wide will give you how many cubic m of concrete you need. Same for the floor. Round 110 a meter now plus vat. Any slat crowd will give you a price in minutes. Then ring a steel crowd and they’ll do the same for re bar.

    I’d imagine €10,000 will dig it out and cover labour for all the tank works.



  • Registered Users, Registered Users 2 Posts: 2,230 ✭✭✭Who2


    A double tank, shed and all you will be over 100k. A rough ballpark of 120k if you do a concrete apron and a bit of yard work. I wouldn’t think it will be all bells and whistles at that either.



  • Registered Users, Registered Users 2 Posts: 743 ✭✭✭lmk123


    About €80-90k for a 5 bay, 16’6, 10 foot deep tank with a 15 foot feeding passage all entirely roofed / covered, grant spec if that’s any good to you. I’ll give you more accurate costings if I ever manage to get this f*****g grant sorted.



  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves




  • Registered Users, Registered Users 2 Posts: 743 ✭✭✭lmk123




  • Registered Users, Registered Users 2 Posts: 2,638 ✭✭✭Dunedin


    I did a 4 bay open shed in 2018 - grant spec. 14 6 slat, 9 foot tank with bout 30’ of lie back and calving pens. Gates/barriers €13k, calving camera €3k and had €10k of filling. Came in bang on €80k including vat.

    wouldn’t have thought you’d get much of a 5 bay for €80-90k today??



  • Registered Users, Registered Users 2 Posts: 743 ✭✭✭lmk123


    Ya but I don’t have a lie back or pens, just tank and feeding passage. Approx 40k for tank and slats, 30k for steelwork and 5k electrical, are qoutes I have, so I’m guessing the rest should be done for 10-15k



  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    That is decent going take away vat on 85k approx 11.5k.

    Take away grant @40% 29.5k or @60% 44k leaves the shed costing you net 44 or 30k.

    Two year depreciation on tank probable takes another 10k off it.

    Well done by the way I say its below grant costings so make sure to to allow for you own labour and tractor work.

    The electrical should not cost 5k it a pretty straight forward job. Hope you.put in for yard lights in the grant as well if not get the electricians to throw-in the wiring while they are doing the shed

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 743 ✭✭✭lmk123


    The electrical covers yard lights and CCTV points too, I know the electrician well and he definitely isn’t robbing me, sadly the 60% is on the departments reference costs and not the actual cost. I’m eligible for the 60% grant and I’d say the shed will still cost me around €45k. Every job is different though, I’m building on pure pencil so won’t need much fill and did the planning myself, will also do groundwork’s myself, few pound saved there too.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 20,520 ✭✭✭✭Bass Reeves


    Have not costeded a shed in ages but references costs are ex vat and I say that shed is below reference costs.

    Slava Ukrainii