  • Registered Users Posts: 15 MrsHegsy


    stiofan85 wrote: »
    Yeah I think it's split between phase 3 and 4. I think P3 is what's up now and they are expecting to finish by June. Was out at the site at the weekend and it looks like they've the foundations dug for P4.

    We also ordered our shower doors through CKB Design. They gave us a good deal (apparently) and were very obliging.

    That’s great to know!! Having as much installed on move in as possible would be fantasticN how did you find CKB to deal with? Did you make many changes to the kitchen as standard?


  • Registered Users Posts: 505 ✭✭✭stiofan85


    MrsHegsy wrote: »
    That’s great to know!! Having as much installed on move in as possible would be fantasticN how did you find CKB to deal with? Did you make many changes to the kitchen as standard?

    Yeah, we added a wine rack, larder, under sink bin and the corner carousel thing. It's not cheap but then again neither is the house so do it once, do it right etc.... They're good to deal with.

    We also spoke to the electrician and he added some spot lights in the kitchen and the lighting under the cabinets. You're a couple of months behind us so you've time to think these things through.


  • Registered Users Posts: 15 MrsHegsy


    stiofan85 wrote: »
    Yeah, we added a wine rack, larder, under sink bin and the corner carousel thing. It's not cheap but then again neither is the house so do it once, do it right etc.... They're good to deal with.

    We also spoke to the electrician and he added some spot lights in the kitchen and the lighting under the cabinets. You're a couple of months behind us so you've time to think these things through.

    Oh larder is high up on our list! We’ve a 3 bed and there isn’t huge storage in the kitchen! Under sink bin is interesting! I’m wanting to look at changing counters too!


  • Registered Users Posts: 1 Jon OT


    MrsHegsy wrote: »
    Hi there neighbours! We were told Sept/Oct. we’ve bought the last house available at the very end of The Way though so it’s probably being released in two sections? I’m heading over to Curtis kitchens next week to make a few changes! I’ll see if they have had any updates while I’m there!

    Hi Folks, we've bought on the "Way" too (all things going well) and looking forward to getting in! We have spent some time up there recently so will share any significant updates we see.


  • Registered Users Posts: 375 ✭✭Maldini2706


    stiofan85 wrote: »
    Yeah, we added a wine rack, larder, under sink bin and the corner carousel thing. It's not cheap but then again neither is the house so do it once, do it right etc.... They're good to deal with.

    We also spoke to the electrician and he added some spot lights in the kitchen and the lighting under the cabinets. You're a couple of months behind us so you've time to think these things through.

    How did you get in touch with the electrician? Or was it the CKB guy? Thanks
    MrsHegsy wrote: »
    Oh larder is high up on our list! We’ve a 3 bed and there isn’t huge storage in the kitchen! Under sink bin is interesting! I’m wanting to look at changing counters too!

    We're a 3 bed too and were up in CKB the other day, I think the larder is only an option if you move the fridge to the other wall where the side cabinet and shelves are in the standard plans. They said some people are doing that to fit an American-style fridge freezer in and the larder would go where the fridge is in the current plans.

    The granite counter top is €3k in total, we didn't go for it at the time but I'm having non-buyer's remorse and we might change our mind.


  • Advertisement
  • Registered Users Posts: 505 ✭✭✭stiofan85


    How did you get in touch with the electrician? Or was it the CKB guy? Thanks



    We're a 3 bed too and were up in CKB the other day, I think the larder is only an option if you move the fridge to the other wall where the side cabinet and shelves are in the standard plans. They said some people are doing that to fit an American-style fridge freezer in and the larder would go where the fridge is in the current plans.

    The granite counter top is €3k in total, we didn't go for it at the time but I'm having non-buyer's remorse and we might change our mind.

    Sent you a pm


  • Registered Users Posts: 15 MrsHegsy


    Just wondering, has anyone made changes to the barhrooms? Or is that even possible?


  • Registered Users Posts: 14 SpursLady


    MrsHegsy wrote: »
    Just wondering, has anyone made changes to the barhrooms? Or is that even possible?

    Yes it was possible to make changes to the bathrooms through CKBs as they supply the them too. I made a small change to the main bathroom back in Jan :)

    Was out yesterday and things look like there are ticking along nicely :)


  • Registered Users Posts: 23 KB1980


    Can anyone recommend someone to fit shower doors?


  • Registered Users Posts: 742 ✭✭✭jester1980


    MrsHegsy wrote: »
    Oh larder is high up on our list! We’ve a 3 bed and there isn’t huge storage in the kitchen! Under sink bin is interesting! I’m wanting to look at changing counters too!

    We are in since Sept and got the under sink bin, something so small my wife wanted but its great, 3 way bin that pulls in and out, works perfect and highly recommend.


  • Advertisement
  • Registered Users Posts: 9,547 ✭✭✭billyhead


    stiofan85 wrote: »
    Congratulations :)

    Can't advise on the cover for the heat pump unfortunately. Can you give any advice on the blips? Anything avoidable?!

    If anyone needs one of these covers I have a brand new unused one that's not needed for sale on adverts and will sell at a discounted price. I am up the road in Rush too. Just PM me if interested


  • Registered Users Posts: 505 ✭✭✭stiofan85


    Driveways and footpath going into the first few on the North side of the drive. Anyone on the thread in that lot? Should be snagging soon I imagine


  • Registered Users Posts: 8 CPC1234


    stiofan85 wrote: »
    Driveways and footpath going into the first few on the North side of the drive. Anyone on the thread in that lot? Should be snagging soon I imagine

    Thank you so much was just wondering what the situation was ... getting very excited now


  • Registered Users Posts: 10 mchurc01


    stiofan85 wrote: »
    Driveways and footpath going into the first few on the North side of the drive. Anyone on the thread in that lot? Should be snagging soon I imagine



    Was just out there too, they're coming on great. yep we're moving into that patch.
    I have to say the back wall is looking very close to the house in the parts it's up already - does anyone else feel the same if you've seen it ?
    Hard to know the real size from behind the site fence but thought & hoped it would be bigger than it appeared to me anyway


  • Registered Users Posts: 505 ✭✭✭stiofan85


    mchurc01 wrote: »
    Was just out there too, they're coming on great. yep we're moving into that patch.
    I have to say the back wall is looking very close to the house in the parts it's up already - does anyone else feel the same if you've seen it ?
    Hard to know the real size from behind the site fence but thought & hoped it would be bigger than it appeared to me anyway

    We are further down and I thought the same about the back wall. On the plans the it looked further away. F*ck all we can do at this point I guess though.


  • Registered Users Posts: 10 mchurc01


    stiofan85 wrote: »
    We are further down and I thought the same about the back wall. On the plans the it looked further away. F*ck all we can do at this point I guess though.


    Looks that way alright....checked through the contract & nothing helpful in there. We have to accept it or find somewhere else.
    Ah well, with the beach down the road etc. it's not the worst scenario.


  • Registered Users Posts: 15 MrsHegsy


    jester1980 wrote: »
    We are in since Sept and got the under sink bin, something so small my wife wanted but its great, 3 way bin that pulls in and out, works perfect and highly recommend.

    Jester is your bin under sink or in a full press? We were in on sat and told no undersink option, don’t really fancy giving up a double press for the bin!


  • Registered Users Posts: 505 ✭✭✭stiofan85


    MrsHegsy wrote: »
    Jester is your bin under sink or in a full press? We were in on sat and told no undersink option, don’t really fancy giving up a double press for the bin!

    Yeah you're right, it's a full press. I said under sink because that's what we have now. If you want just under sink get the Ikea bins. They're half the height. That's what we have now and they're grand. We went for the larger version because the recycling one tends to fill very quickly


  • Registered Users Posts: 742 ✭✭✭jester1980


    MrsHegsy wrote: »
    Jester is your bin under sink or in a full press? We were in on sat and told no undersink option, don’t really fancy giving up a double press for the bin!

    Yeah its just under sink, we got from the kitchen company and one of Gordons guys installed it, its a small bin with 3 compatments, larger one for recyling which takes up 50% and other two parts 25%

    we didnt want a big bin and didnt want one showing in the kitchen.

    Works fine for us last 6 months anyway,.


  • Registered Users Posts: 375 ✭✭Maldini2706


    Just out of curiosity, what other changes to the original plans/specifications have people asked for? It's our first house so we're not really sure what amendments we can make


  • Advertisement
  • Registered Users Posts: 742 ✭✭✭jester1980


    We only changed items in the kitchen, changed the color of what the showhouse was, changed the countertop color as well as wife hated that, and then added the bin and an ironing board to one of the drawers.


  • Registered Users Posts: 505 ✭✭✭stiofan85


    Just out of curiosity, what other changes to the original plans/specifications have people asked for? It's our first house so we're not really sure what amendments we can make

    We added some spot lights in the kitchen, outside lights to the side, lights in the wardrobe, power for a shed, lighting for the kitchen cabinets and a light switch beside the bed in the master bedroom. Electrical plan seems to have enough sockets so didn't ask for anymore.

    In the kitchen it was the larder, under counter bin (the big one) and a wine rack. We were happy enough with the colour and the countertop.


  • Registered Users Posts: 8 CPC1234


    stiofan85 wrote: »
    We added some spot lights in the kitchen, outside lights to the side, lights in the wardrobe, power for a shed, lighting for the kitchen cabinets and a light switch beside the bed in the master bedroom. Electrical plan seems to have enough sockets so didn't ask for anymore.

    In the kitchen it was the larder, under counter bin (the big one) and a wine rack. We were happy enough with the colour and the countertop.


    Hi .. I was just wondering who is doing this for you as we emailed the electrician and never received a reply


  • Registered Users Posts: 8 CPC1234


    jester1980 wrote: »
    We only changed items in the kitchen, changed the color of what the showhouse was, changed the countertop color as well as wife hated that, and then added the bin and an ironing board to one of the drawers.

    Hi jester..

    Did ckb.. provide the ironing board... I asked about it however they said they didn’t do it .

    Thanks


  • Registered Users Posts: 505 ✭✭✭stiofan85


    CPC1234 wrote: »
    Hi .. I was just wondering who is doing this for you as we emailed the electrician and never received a reply

    It's the electrician Gordon put me in touch with. Chris I think. He was going into my unit that week so perhaps he's going by whatever units he's working on that week?


  • Registered Users Posts: 742 ✭✭✭jester1980


    CPC1234 wrote: »
    Hi jester..

    Did ckb.. provide the ironing board... I asked about it however they said they didn’t do it .

    Thanks

    Yep they did it for us, well they ordered it and we let Gordon know and he installed it.


  • Registered Users Posts: 23 KB1980


    Maybe an odd question but just wondering where people store towels as there is no storage for them where the heating tank is.


  • Registered Users Posts: 10 Sineadch12


    KB1980 wrote: »
    Maybe an odd question but just wondering where people store towels as there is no storage for them where the heating tank is.
    Hi there shelved were installed in there for when we moved in


  • Registered Users Posts: 23 KB1980


    Sineadch12 wrote: »
    Hi there shelved were installed in there for when we moved in

    Thanks for that. We have no shelves and with the size of the boiler/tank in there I didn't even think shelves could fit!


  • Advertisement
  • Registered Users Posts: 742 ✭✭✭jester1980


    we asked for shelves also, three small wooden ones that hold towels perfect


Advertisement