  • Registered Users Posts: 397 ✭✭Geogregor


    my3cents wrote: »
    http://map.geohive.ie/mapviewer.html and try the historic maps. Edit> You can open more than one map and superimpose one them on each other.

    What a brilliant website, I can spend hours on it :)


  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 12/02/19 (pic engineers ireland )
    mzL6Dfu.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 13/02/19 (pic niall Roche twitter )
    uXcQs7G.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    Bridge construction January 19
    bcs7Mad.jpg


  • Registered Users Posts: 4,477 ✭✭✭eagerv


    2100Hrs Tonight.
    The old Pink Rock road is open again...


    The road had become overgrown, it has now been cleaned up a bit.



    YR8Xq0k.jpg


    Io0kBO5.jpg


  • Advertisement
  • Registered Users Posts: 409 ✭✭topnotch


    road_high wrote: »
    Any one a 70s or early 80s detailed road map of Ireland? Be fascinating to see these old routes on maps

    Took a quick snap of the old 1/2 inch to 1 mile South Wexford map there for ya. (1986)


  • Registered Users Posts: 5,440 ✭✭✭swoofer


    any updates on the opening of this by pass, want to book uk trip asap?


  • Registered Users Posts: 2,326 ✭✭✭alta stare


    swoofer wrote: »
    any updates on the opening of this by pass, want to book uk trip asap?

    Wexford CC and BAM say summer and rumours are it is behind and it will be November. From the progress i see when i pass by it looks like it is on schedule so who knows.

    Not being smart but do you need it to be open to book a trip?


  • Registered Users Posts: 5,440 ✭✭✭swoofer


    yes, I want to by pass new ross forever, spent too long in queues!!


  • Registered Users Posts: 2,326 ✭✭✭alta stare


    swoofer wrote: »
    yes, I want to by pass new ross forever, spent too long in queues!!

    Yeah it is a pain alright :D Mornings are fine its between half 5 and half 6 going in to New Ross from the Waterford side which is a pita.


  • Advertisement
  • Registered Users Posts: 1,159 ✭✭✭jelutong


    Waterford side?


  • Registered Users Posts: 2,326 ✭✭✭alta stare


    jelutong wrote: »
    Waterford side?

    Coming from Waterford direction. I forgot to add the evening part to those times.


  • Moderators, Sports Moderators Posts: 11,980 Mod ✭✭✭✭Cookiemunster


    Some cool pics in the fog posted on twitter by BAM

    Pier Three rising out of the mist - a thing of beauty, a joy to behold. #newrossbypass #n25nrjv @BAMIrl_ @BAMPPP

    D0a66xqXgAE7C0K.jpg

    D0a66wwX4AAuZK5.jpg


  • Registered Users Posts: 1,955 ✭✭✭Deise Vu


    ^^^^
    That's worthy of the cool pics thread! The second photo is amazing. I have no head for heights, If I had to descend that ladder my imagination would be telling me the bottom half could be missing!


  • Registered Users Posts: 6,893 ✭✭✭allthedoyles


    The eagerly anticipated New Ross Bridge and N25 Bypass will open at a yet to be determined date in 2020, rather than this summer, as had been previously anticipated.
    The news, disclosed to South Kilkenny Councillors at the February meeting of the Piltown Municipal District, was not greeted with any palpable sense of disappointment on members’ behalves.

    As late as last September, Councillors had been told that the project was due to open by June of this year.


    http://www.munster-express.ie/business/new-ross-bridge-to-open-in-2020/


    Its going to be 2020 as I always suspected .


  • Registered Users Posts: 2,326 ✭✭✭alta stare



    That is disappointing if true.


  • Registered Users Posts: 3,231 ✭✭✭Azatadine


    No surprise though is it? It's been pretty well flagged. I hope it's early 2020 but if they are not giving a date, it may well be a long way off still.


  • Registered Users Posts: 13,812 ✭✭✭✭josip


    Presumably that article is by and large a cut and paste press release from BAM with little if no journalistic input?
    Some of the statements are completely contradictory.

    "will open at a yet to be determined date in 2020"

    "Councillors had been told that the project was due to open by June of this year."

    "Progress ... has proceeded on schedule"


  • Registered Users Posts: 10,690 ✭✭✭✭Jamie2k9


    Oh dear Leo or just about any TD will have no photo opportunity before an election!


  • Moderators, Science, Health & Environment Moderators Posts: 19,546 Mod ✭✭✭✭Sam Russell


    Jamie2k9 wrote: »
    Oh dear Leo or just about any TD will have no photo opportunity before an election!

    I think standing on the edge of the part completed bridge looking into the Barrow would make a tremendous photo op.


  • Advertisement
  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 28/02/19 (pic endo delaney)
    2f60dv2.jpg


  • Registered Users Posts: 68,499 ✭✭✭✭L1011


    Enniscorthy is the same constituency - they should do photo op wise


  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 07/03/19 (pic fb)
    j7cd5QW.jpg


  • Registered Users Posts: 3,231 ✭✭✭Azatadine


    I wish those sections would connect! Then I'll know we are getting close!


  • Registered Users Posts: 1,159 ✭✭✭jelutong


    So would BAM!


  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 27/02/19 (pic stan prucha)
    MoyfGw3.jpg


  • Registered Users Posts: 4,322 ✭✭✭m17


    The barrow crossing 27/02/19 (pics stan prucha)
    DnGolhO.jpg

    TpD2iet.jpg



    THajFVf.jpg


  • Registered Users Posts: 13,812 ✭✭✭✭josip


    lRsYhIq.jpg


    fO711cr.jpg


  • Registered Users Posts: 3,231 ✭✭✭Azatadine


    I know nothing about construction but was wondering if those two missing sections get 'dropped in' or do the sections need to be built out and meet each other?


  • Advertisement
  • Registered Users Posts: 13,812 ✭✭✭✭josip


    Azatadine wrote: »
    I know nothing about construction but was wondering if those two missing sections get 'dropped in' or do the sections need to be built out and meet each other?


    They get built out using travellers.
    There was a movie posted earlier but I can't find it.
    BAM Slideset has some info.
    https://www.waterfordchamber.ie/images/Declan-Roche-BAM.pdf