Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Irish rail fleet and infrastructure plans

17810121321

Comments

  • Registered Users, Registered Users 2 Posts: 6,327 ✭✭✭highdef


    A recent RTE radio interview with Barry Kenny suggests that (thankfully) the new order will have aircon but thankfully they will have actual windows!



  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    QQ, where did this extract come from? I mean, who said it and in what situation?



  • Moderators, Education Moderators Posts: 26,403 Mod ✭✭✭✭Peregrine


    Irish Rail board meeting. Mr Smyth is Peter Smyth the Chief Mechanical Engineer.



  • Registered Users, Registered Users 2 Posts: 10,759 ✭✭✭✭Jamie2k9


    Will the new warning systems been installed at various farm/local road crossings result in any speed changes assuming other factors allow it.



  • Registered Users, Registered Users 2 Posts: 1,287 ✭✭✭weatherbyfoxer


    Seems to be talks in the Kildare County Development plan of developing an inland port at Cherryville Junction..anyone see any information on it?



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    It's in the IR freight plan also.

    With land in the north Docklands that was used for (non port company) container storage and haulage ops being turned in to apartments and hotels very rapidly there may be a need for one.

    Can the PPT even take container flats or do they need to be in pocket wagons?



  • Registered Users, Registered Users 2 Posts: 17,943 ✭✭✭✭LXFlyer


    Considering that liner trains operated across the network for years from North Wall, I think that the answer to that is yes!



  • Registered Users, Registered Users 2 Posts: 1,862 ✭✭✭Economics101


    The PPT currently takes container flats from Ballina to North Wall (and not on pocket wagons)



  • Registered Users, Registered Users 2 Posts: 1,287 ✭✭✭weatherbyfoxer




  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    Its actually just there as an 'eastern gateway' west of Dublin without the location being specific. I thought it was more specifically Cherryville but must have misremembered.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,287 ✭✭✭weatherbyfoxer


    Ah right,Seen that previously alright,IR playing the card close to the chest as per usual regarding location,surely the junction is the most suitable with it being located between j13 and j14 of the N7 motorway



  • Registered Users, Registered Users 2 Posts: 515 ✭✭✭feelings



    Ready this with interest. I wonder if Irish Rail would consider these?



  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    There's very little hydrogen production here (and it's pretty much all committed to bus trials), and with such a small network comparatively it's just easier to go for electrification and the lighter, more efficient trains that produces.



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    they're never going to electrify the whole network; hydrogen could be long term replacement for diesel on branch lines etc.



  • Registered Users, Registered Users 2 Posts: 29,183 ✭✭✭✭end of the road


    they will probably rely on battery for that.

    I'm very highly educated. I know words, i have the best words, nobody has better words then me.



  • Registered Users, Registered Users 2 Posts: 1,245 ✭✭✭p_haugh


    Seen this come up in the news today.

    Preliminary design beginning soon for flood & erosion prevention on the Rosslare line between Merrion Gates and Greystones.




  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    actually all the way down to Wicklow Town is included in this project.



  • Registered Users, Registered Users 2 Posts: 1,245 ✭✭✭p_haugh




  • Registered Users, Registered Users 2 Posts: 1,245 ✭✭✭p_haugh


    Also, anyone have an update on the new ICR cars? I know the first vehicles are en-route from South Korea and due to arrive this month.



  • Registered Users, Registered Users 2 Posts: 438 ✭✭andrewfaulk


    The first 3 carriages arrived to Dublin this morning along with new RTGs for DFT terminal.. They should be offloaded on Wednesday evening in Ocean Pier terminal



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,245 ✭✭✭p_haugh


    Irish rail posted about the first 3 carriages being unloaded today




  • Registered Users, Registered Users 2 Posts: 2,219 ✭✭✭Glaceon




  • Registered Users, Registered Users 2 Posts: 10,759 ✭✭✭✭Jamie2k9


    Quiet an extraordinary situation that IE, NTA and Dep of Transport have self inflected. The prospect of over half the DART fleet been taken out of service with no replacement available. Hopeing for an ontime delivary, commissioning and fault free trains.

    Its about time IE stopped pandering to TDs when they appear at Gov committes wasting everyones time about this uneonomical plans for various rail lines, stations and service aspirations. There is already daily DART failures which were almost unheard of a few years ago and they expect them to keep going when they should be scraped at least 10 years ago.

    The CRR will probally extend it by much less than 10 years (2-5) but it would be great to see the fallout if they refused especially coming into an election year...



  • Registered Users, Registered Users 2 Posts: 13,764 ✭✭✭✭Geuze


    Is the 2700 class still completely out of service?

    I know a plan to renovate them was abandoned.

    There are 26 vehicles, I think.

    I have seen massive, severe overcrowding on first train into Galway in the morning, so more stock is needed.



  • Registered Users, Registered Users 2 Posts: 29,183 ✭✭✭✭end of the road



    yes still out of service, very unlikely to ever run again at this stage.

    I'm very highly educated. I know words, i have the best words, nobody has better words then me.



  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    Out of service, unserviceable and non-economic to restore.

    If they wanted more stock, they could get it quicker and easier by ordering it. But it seems to be the case that anything other than the limited number of 22ks that are on their way here is going to rely on cascaded diesels from Dublin when the DART+ fleet start to arrive.



  • Registered Users, Registered Users 2 Posts: 13,764 ✭✭✭✭Geuze


    Pity.

    The 2700 class were in service for what, just 12-14 years?

    I can't understand how they deteriorated so much by simply being parked somewhere.

    Were they laid up outdoors or indoors?



  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    They were borderline unservicable from the day they arrived. There were huge warranty claims which made them just usable enough for the life they had.

    The very closely related 8200 DARTs had an even worse service history. Both should have been rejected to the manufacturer like Denmark did to AnsaladoBreda but massive fleet constraints at the time meant they weren't.



  • Registered Users, Registered Users 2 Posts: 10,759 ✭✭✭✭Jamie2k9


    I see they have a traction stuidy for Enterprise replacment out. They are still going with 2027/28 timeframe.

    Most noteable:

    The new fleet will operate using IÉ’s existing 1.5 kV DC OHLE network where installed and otherwise be self-powered until route electrification is achieved around 2035. NIR propose at some future point to install 25 kV AC OHLE and it may feature short discontinuous sections. All technology & fuel source strategies and solutions recommended must be proven reliable, have established safe supply networks and demonstrate value for money. “Self-Power” requires a very detailed study and Diesel power is seen as a choice of last resort where no other practical proven solutions currently exist. 


    Going to be a costly train to accommodate 3 modes.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu




  • Registered Users, Registered Users 2 Posts: 3,409 ✭✭✭thomil


    Should be doable. a surprising number or locomotives and EMUs are multi-voltage capable, including the ICE 3 trainsets operating into the Netherlands from Germany, who have to switch from 15KV on the German network to 1.5KV on the Dutch network. Swiss railways have to deal with similar issues when operating into France or Italy, including with regional or suburban type trainsets.

    Good luck trying to figure me out. I haven't managed that myself yet!



  • Registered Users, Registered Users 2 Posts: 8,882 ✭✭✭SeanW


    If they're going down this route of sort of sometime partially electrifying the Dublin-Belfast line with caveats, then it strikes me that continuing to divide the service with locomotives and carriage sets (with a DVT) would be ideal. A good start might be to acquire a replacement for the 201 class locomotive that can use both diesel and draw from the DART (1.5 kv DC) OHLE for start, then if it later turns out that the Northern Ireland rail network is to be electrified with 25kv AC but with gaps for tunnels, bridges etc, then the DVT could be replaced with an AC powered locomotive that includes batteries or something.



  • Registered Users, Registered Users 2 Posts: 8,543 ✭✭✭dublinman1990


    What types of locomotives are currently suitable to carry out that purpose for the Enterprise? Do NIR & IE have a fair idea as to what type of new locomotive they can order for that purpose when it's used on an Irish rail guage.

    I would have some confidence to say that type of technology is available for rail lines right across Central Europe as lot of them are equipped with OHLE for locomotives to carry out passenger and freight runs.



  • Registered Users, Registered Users 2 Posts: 1,862 ✭✭✭Economics101


    25kv AV electrification with gaps (for bridges, tunnels)? What a laughing stock Translink or IE would be if they went for this nonsense, They might save on the fixed OHLE but what about the cost and complexity of having hybrid stock? Dual voltage electric traction is no problem, perfectly routine in Europe and totally proven technology.

    Does anyone in Ireland ever go to the Continent and see how things should be done?



  • Registered Users, Registered Users 2 Posts: 10,759 ✭✭✭✭Jamie2k9


    My reading is NIR have no intention of electrifying Newry-border and like today keep the line just about functional at minimun cost. IE would probally go north of Dundalk but maybe not the full way to border.

    Can't see locomotive been considered all, various commentarty on the route have all referecned multiple units.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,045 ✭✭✭Pete_Cavan


    IÉ have issued a tender for passenger seat replacement for 2600 & 29000 DMU Fleets;x



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    they need to do the floors on the 29ks as well.



  • Registered Users, Registered Users 2 Posts: 29,183 ✭✭✭✭end of the road


    and a hell of a lot more to boot.

    they need a complete refurbishment at this stage they are almost clapped out.

    I'm very highly educated. I know words, i have the best words, nobody has better words then me.



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    yeah, I sort of assumed they'd be scrapped as new stock gets delivered, they're wrecked. Surprised to hear about this tender so...



  • Registered Users, Registered Users 2 Posts: 29,183 ✭✭✭✭end of the road


    wouldn't surprise me if they do get scrapped but to be honest it would be stupid as chances are they could be refurbished reasonably enough.

    if they are i can guarantee just like last time the new stock won't be enough to replace what was scrapped and deliver the necessary increased services and capacity.

    I'm very highly educated. I know words, i have the best words, nobody has better words then me.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 3,272 ✭✭✭Barna77


    About time!



  • Registered Users, Registered Users 2 Posts: 7,045 ✭✭✭Pete_Cavan


    Presumably there won't ever be orders of new DMUs again (EMU/BEMU only), and a large part of the network will remain non-electrified and beyond battery range. Could they are looking to flog the DMUs for as long as physically possible because they know they won't have any other options?



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    I'd have thought they're due a full mid life refurb at this stage; if they're only doing the seats that would suggest they're not planning to keep them running for 35-40 years.



  • Registered Users, Registered Users 2 Posts: 2,219 ✭✭✭Glaceon


    They've had a hard life, mainly due to there being insufficient stock to cover for them. IE probably couldn't take them out of service for a midlife refurb even if they wanted to, at least not until the DART is extended to Drogheda.



  • Registered Users, Registered Users 2 Posts: 1,245 ✭✭✭p_haugh


    According to Rail Users Ireland on twitter, there's been an additional order of 90 DART carriages ordered to replace the original fleet...




  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    I wonder if there's any potential for preserving one of the 8100 sets?



  • Registered Users, Registered Users 2 Posts: 7,045 ✭✭✭Pete_Cavan


    From Barry Kenny's comments in the IT article, it looks like the new carriages won't replace any/many existing DART carriages but are for the Northern commuter route to Drogheda and required for Dart+.



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    that was in relation to the original order of 95 carriages. An extra 90 has now been announced, it seems likely the LHB Darts will be retired as those come on stream. As RUI points out, those original units are becoming very unreliable.



  • Registered Users, Registered Users 2 Posts: 1,862 ✭✭✭Economics101


    Are you referring to the original LHB Dart units?. If so, these were all taken to Germany a few years ago for a very extensive mid-life refurbishment.



  • Registered Users, Registered Users 2 Posts: 69,589 ✭✭✭✭L1011


    They're referring to the 29000 DMUs, that's what is getting new seats (along with the 2600) and had further discussion of the significant corrosion problems they are showing (floors bubbling up etc).

    The LHB DART units were taken to Germany nearly two decades ago for a mid-life refurbishment and are now exceptionally close to their official end of life date. Time marches on terrifyingly!



  • Advertisement
Advertisement