Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Cost of Building a House 2019

  • 08-05-2019 9:05am
    #1
    Registered Users, Registered Users 2 Posts: 2,500 ✭✭✭ECO_Mental


    Hi all,


    Just investigating building my house again nearly 10 years after I got planning anyway doing a bit of research and talking to a couple of people down here on Cork including one Architect who said that he is getting back quotes of around €175 sqr/foot...and that is a standard design house builders finish.

    For a house of around 2500sqr ft house you could be touching €450k for a builders finish, add another 100k to fit out a kitchen tiling etc thats well over 500k for a standard 4 bed detached.

    Is this the reality at the moment out there?, with these numbers there is no financial sense in building a house these days. Talking to estate agents also the market below 400k is buoyant but anything over is slow to sell (in Cork) so there is good value to be had in buying in the €400k+ range.

    I know the decision in building your own house sometimes is more than financial but these numbers seem a bit out of control at the moment.

    6.1kWp south facing, South of Cork City



«134

Comments

  • Registered Users, Registered Users 2 Posts: 9,157 ✭✭✭893bet


    Have you renewed your planning?


  • Registered Users, Registered Users 2 Posts: 2,500 ✭✭✭ECO_Mental


    893bet wrote: »
    Have you renewed your planning?


    yeah, I renewed it 4 years ago, I have until next August 2020 to have it substantially completed.

    6.1kWp south facing, South of Cork City



  • Registered Users Posts: 71 ✭✭vinnie_cork


    2500sq ft is more than your standard 4 bed. There are a few factors pushing up costs, building regs changes. The European Energy Performance of Buildings Directive Recast 2010 (EPBD) requires all new buildings to be nearly Zero Energy Buildings (nZEB) by 31st December 2020 so after this date costs will be even greater.
    10 years ago you would have built a C3 rated house maybe even D and not thought about it. It would have no PV panals and probably heated with Gas or oil. Now you need to hit A3 and about to be A1 required so new technology, advanced Heat pumps and PV use, mechanical ventilation etc.

    If you apply for an extension to planning now you will be required to comply with new conditions. I used do planning and house design years ago and I never understood the clients whom wanted 3000sq ft all ensuite mansions when all they could afford was a very decent 1800 sq ft design fully finished. My own sister and her husband insisted on 2,700 and while the house was built and finished in 2013 the driveway remains a dirt track that you would get stuck in visiting them. and low and behold they never use their 2nd living room.

    I have heard current rates are €150 to €200 per sq ft. This will go up (assuming there is not another crash) after nZEB comes into force.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    ECO_Mental wrote: »
    Hi all,


    1. including one Architect who said that he is getting back quotes of around.. €175 sqr/foot.. and that is a standard design house builders finish.

    2. Is this the reality at the moment out there?,
    3. with these numbers there is no financial sense in building a house these days.
    4. Talking to estate agents also the market below 400k is buoyant
    5. but anything over is slow to sell (in Cork) so there is good value to be had in buying in the €400k+ range.
    6. I know the decision in building your own house sometimes is more than financial but these numbers seem a bit out of control at the moment.
    1. Turn key can be achieved for 175/soft standard finish. I don’t believe that rate is for a builder finish.
    2. Yes
    3. That’s life
    4. Don’t talk to them
    5. Slow, yes. Value has nothing to do with it -in cork city any sought after area, a 4 bed is that money.
    6. Exactly.


  • Registered Users, Registered Users 2 Posts: 2,135 ✭✭✭mtoutlemonde


    I hope this isn't a silly question...it probably is but here goes.

    I have just got full planning for my house but since the papers have been sent, I'm thinking that it is too big, do you have to build to the size in your architect drawing ... I wouldn't be changing the house type/layout ... just the size.


  • Advertisement
  • Registered Users Posts: 1 Moustie


    I'm currently looking at buying a site ,cost €60.000 , and I will have around 160.000 to spend... how far that would get me ..


  • Registered Users Posts: 71 ✭✭vinnie_cork


    Very rough but see link. Factor in heat pumps and PV Panals now as you have to hit A3 and if house is finished after 2020 then add in heat recovery and all the other energy measures.
    Site complexity- piling, raft foundations, excavation, difficult access. Etc.

    [snip]

    And regarding chasing size, yes, it’s new planning. If house looks same style but shrinks 1m all over in dimensions it’s a different house. If it stays same and moved on site as you build it you need a new planning too.
    Your contributions fees to the authority was calculated on €/perm2 in Cork City it is €70-80 per m2 for council fees.
    I used advice clients to allow for future easy expansion if budget was tight, layout to add 40m2 to rear in few yrs time. 40m2 to rear is exempt (once it hits the other criteria).
    People need to stress to their designers their build budgets.


  • Registered Users, Registered Users 2 Posts: 1,541 ✭✭✭Dudda


    Moustie wrote: »
    I'm currently looking at buying a site ,cost €60.000 , and I will have around 160.000 to spend... how far that would get me ..

    After solicitor fees, land registry fees, architect, planning fees, newspaper notice, site percolation test, structural fees, possible environmental, traffic or flooding reports, development contribution fees, detail drawings, tender report, Irish water connection, ESB poles, access road into site, clearing Japanese knotweed, etc.
    You might have enough for foundations and a floor slab.

    To be honest it completely depends on the site. Way to many variables to say. If the site is flat, clear, has planning, all services and good ground conditions it will go a lot further.


  • Registered Users Posts: 71 ✭✭vinnie_cork


    Dudda wrote: »
    After solicitor fees, land registry fees, architect, planning fees, newspaper notice, site percolation test, structural fees, possible environmental, traffic or flooding reports, development contribution fees, detail drawings, tender report, Irish water connection, ESB poles, access road into site, clearing Japanese knotweed, etc.
    Walk away if knotweed, takes 2/3 years of treatment to rid and then could comeback at any time, can remain dormant for 20 years.
    Solicitor €1500
    Land registery maybe €200
    Architect/engineer €1500-2500 for your house budget
    Planning application €65
    Newspaper €50-300 (some authorities state national papers only)
    Site percolation €750
    Structural/engineer fees €1000 min
    Other reports €1000 each, but if flood report needed stop looking at site as only needed in flood risk areas.
    Development contributions in Cork is 70-80pm2 so a 100m2 house is €8000 Levy (1075ft2 house)
    Your budget forget detail drawings and tender reports you can’t afford a project manager you are self build and your managing everything. Or drop another €10,000 min
    Irish waster €1000 and you have to pay for work and manholes or a well ... €3-5k and treatment tank €3
    ESB charge €1700 connection min outside poles, it all adds up and that’s before you start building... a heat pump is now a building reg for green energy and that’s €10,000 or regular boiler and cover roof in PV panels €10,000....


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    I hope this isn't a silly question...it probably is but here goes.

    I have just got full planning for my house but since the papers have been sent, I'm thinking that it is too big, do you have to build to the size in your architect drawing ... I wouldn't be changing the house type/layout ... just the size.

    Speak to your agent. From info provided a new planning application will be required.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 2,135 ✭✭✭mtoutlemonde


    Very rough but see link. Factor in heat pumps and PV Panals now as you have to hit A3 and if house is finished after 2020 then add in heat recovery and all the other energy measures.
    Site complexity- piling, raft foundations, excavation, difficult access. Etc.

    [snip]

    And regarding chasing size, yes, it’s new planning. If house looks same style but shrinks 1m all over in dimensions it’s a different house. If it stays same and moved on site as you build it you need a new planning too.
    Your contributions fees to the authority was calculated on €/perm2 in Cork City it is €70-80 per m2 for council fees.
    I used advice clients to allow for future easy expansion if budget was tight, layout to add 40m2 to rear in few yrs time. 40m2 to rear is exempt (once it hits the other criteria).
    People need to stress to their designers their build budgets.

    I told my architect my budget but he returned with a house of 2600 sq.ft. I havn't yet priced the build but people are putting the fear of God telling me it is a massive house. I will be paying all the costs below from savings and the build is specifically from the mortgage. In my naivety I just went with it.


  • Registered Users Posts: 71 ✭✭vinnie_cork


    I told my architect my budget but he returned with a house of 2600 sq.ft. I havn't yet priced the build but people are putting the fear of God telling me it is a massive house. I will be paying all the costs below from savings and the build is specifically from the mortgage. In my naivety I just went with it.

    Look, it all depends on location, cost of building (after site cost) varies greatly from Dublin to Kerry. Supply and demand on trades etc.
    Is phasing anything an option? Like omitting dormer rooms and not alter design and allows for working on after. Your probably going to have to spec down your finishes. If there is more than 1 en-suite bedroom can you live with just one considering you will have a main bathroom and probably a Wc anyhow, might be €5k saving by time all elements add up for an en-suite.


  • Registered Users, Registered Users 2 Posts: 2,135 ✭✭✭mtoutlemonde


    Look, it all depends on location, cost of building (after site cost) varies greatly from Dublin to Kerry. Supply and demand on trades etc.
    Is phasing anything an option? Like omitting dormer rooms and not alter design and allows for working on after. Your probably going to have to spec down your finishes. If there is more than 1 en-suite bedroom can you live with just one considering you will have a main bathroom and probably a Wc anyhow, might be €5k saving by time all elements add up for an en-suite.

    I'm in the west so architect based it on €105 sq.ft - I took him at his word. Have saved money on site as it's on family land. No dormer rooms. I can definitely manage with one main bathroom.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    Moustie wrote: »
    I'm currently looking at buying a site ,cost €60.000 , and I will have around 160.000 to spend... how far that would get me ..

    Site should be bought ‘subject to planning’

    As part of planning process I’d recommend you get a +/-20% ‘order of magnitude’ costing.


  • Registered Users Posts: 178 ✭✭username2013


    Are all the prices listed in the thread based on the traditional block build method - ie - cavity wall insulation etc? If so are there any alternatives that are feasible in Ireland with our damp climate?

    Two main problems I see with house builds in Ireland are:
    a) very slow to build
    b) heating in houses here is terrible. Even newish houses with good energy ratings I think are quite poor. Warm if the heating is on, but if not they seem to lose heat very quickly.

    Surely there are new technologies/techniques that are available now that can mitigate these problems?


  • Registered Users, Registered Users 2 Posts: 974 ✭✭✭redarmyblues


    I'm in the west so architect based it on €105 sq.ft - I took him at his word. Have saved money on site as it's on family land. No dormer rooms. I can definitely manage with one main bathroom.

    In the West my brother is paying 150e per sq ft ex vat for a build.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    1. Are all the prices listed in the thread based on the traditional block build method - ie - cavity wall insulation etc?
    2. If so are there any alternatives that are feasible in Ireland with our damp climate?

    3. Two main problems I see with house builds in Ireland are:
    a) very slow to build
    b) heating in houses here is terrible.
    4. Even newish houses with good energy ratings I think are quite poor.
    5. Warm if the heating is on, but if not they seem to lose heat very quickly.

    6. Surely there are new technologies/techniques that are available now that can mitigate these problems?
    1. Cavity wall insulation is arguably the cheapest option in Ireland primarily because it’s the most common
    2. Yes
    3. What experience do have in this area?
    A. Disagree
    B. Thats a Massive generalization. Depends how well the house is built. And how well the heating system is sized
    4. As per 3.
    5. Lack of air-tightness and dry-lining are generally the causes of this.
    6. Yes. Read around the forum. Use the keywords in point 5.


  • Registered Users Posts: 71 ✭✭vinnie_cork


    Air tightness is key for warmth, then add mechanical ventilation, tie in heat pump and underfloor heating.

    And €105 per ft2 sounds a little low, even if ex vat. But, unless you get a quote, maybe your architect made it a very simple structure with no awkward details and no large steel supports required and standard block work dimensions (ie. walls in multiple of 450mm lengths to minimise material waste).

    I was talking to a Kerry builder 2 weeks ago for feelers on my budget and he said it’s all down to the bill of quantities but a crude cost is his area works out €1500/m2 or €138/ft2 for builders finish.

    I’m about to start a renovation project to an existing house and worrying my €110 p/ft2 budget is low as I want to use new energy technologies and achieve A3 status from G. And with that services are there and connected and building structure.


  • Registered Users Posts: 178 ✭✭username2013


    BryanF wrote: »
    1. Cavity wall insulation is arguably the cheapest option in Ireland primarily because it’s the most common
    2. Yes
    3. What experience do have in this area?
    A. Disagree
    B. Thats a Massive generalization. Depends how well the house is built. And how well the heating system is sized
    4. As per 3.
    5. Lack of air-tightness and dry-lining are generally the causes of this.
    6. Yes. Read around the forum. Use the keywords in point 5.

    As regards experience I have worked in construction here in Ireland and the US and Canada and from what I have seen the timber framed houses used there are much quicker to build and are much warmer. This may be due to better heating systems installed, I'm not really sure. In my experience heating bills there are not much than here though, probably a bit less in fact.

    You're right in regards to my observation been a massive generalization, but this was based on living in a large numbers of houses, in fairness a lot of these are probably older builds. House I have just moved into though was built in 2006 and had a BER rating of b+. I thought this would mean that it retained heat fairly well but we find it very cold unless heat is on. It is dry lined. Perhaps I don't understand everything in relation to how this rating is made. Anyways my observations were mainly due to me been a consumer of various builds (i.e - a renter) in various countries.

    I have no doubt you're right in stating that "Cavity wall insulation is arguably the cheapest option" but that does not necessarily make it the best and most economical over time. Hence my question regarding alternatives.


  • Registered Users, Registered Users 2 Posts: 2,135 ✭✭✭mtoutlemonde


    Air tightness is key for warmth, then add mechanical ventilation, tie in heat pump and underfloor heating.

    And €105 per ft2 sounds a little low, even if ex vat. But, unless you get a quote, maybe your architect made it a very simple structure with no awkward details and no large steel supports required and standard block work dimensions (ie. walls in multiple of 450mm lengths to minimise material waste).

    I was talking to a Kerry builder 2 weeks ago for feelers on my budget and he said it’s all down to the bill of quantities but a crude cost is his area works out €1500/m2 or €138/ft2 for builders finish.

    I’m about to start a renovation project to an existing house and worrying my €110 p/ft2 budget is low as I want to use new energy technologies and achieve A3 status from G. And with that services are there and connected and building structure.

    What he did exactly. Simple plan.


  • Advertisement
  • Closed Accounts Posts: 4,128 ✭✭✭dellas1979


    In the middle of a build.

    Yea its quite unbelievable all the things/roles/money that go into a build.

    The amount of money is unbelievable.

    Its currently impossible to get builders/trades on site.

    This is not a regulated game (I dont mean materials or building standards, I mean youve no recourse as to how slow they go/off on other sites). And it is a game.

    If you want to play a game of "will the builder show up today/answer my unanswered calls", off you go.

    If you are not dead set on building, I wouldnt.

    (Edit: You can probably tell am thick at/fed up with my builder!)


  • Registered Users, Registered Users 2 Posts: 2,500 ✭✭✭ECO_Mental


    dellas1979 wrote: »
    In the middle of a build.

    Yea its quite unbelievable all the things/roles/money that go into a build.

    The amount of money is unbelievable.

    Its currently impossible to get builders/trades on site.

    This is not a regulated game (I dont mean materials or building standards, I mean youve no recourse as to how slow they go/off on other sites). And it is a game.

    If you want to play a game of "will the builder show up today/answer my unanswered calls", off you go.

    If you are not dead set on building, I wouldnt.

    (Edit: You can probably tell am thick at/fed up with my builder!)


    You have to give us more info? ;)

    Are you doing it direct labor and what build method are you using (traditional block or timber frame etc) and more importantly what do you expect it to cost you per sqr/ft or sqr/m in the end up.

    I'm planning to go away from traditional block build and either closed panel timer frame or SIPs, that way all the walls roof etc are done in factory so you are not relying on a block layer not turning up. Also planning to have cement board cladding again doing away of block layers. Might cost a bit extra(although I hear blockies are charging nearly €3 a block these days!) but you will save time and more importantly your nerves:rolleyes:

    6.1kWp south facing, South of Cork City



  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    ECO_Mental wrote: »
    I'm planning to :

    Are you planning to have a main contractor, turn key? What are your prices coming in at?


  • Registered Users, Registered Users 2 Posts: 2,500 ✭✭✭ECO_Mental


    BryanF wrote: »
    Are you planning to have a main contractor, turn key? What are your prices coming in at?


    Early stages yet getting rough budget prices, but aim yes have a main contractor and to be as finished and turn key as possible, but that might depend on the budget. What I budgeting is to around €150sqr ft but could stretch to is €170sqr ft for turn key...

    6.1kWp south facing, South of Cork City



  • Registered Users, Registered Users 2 Posts: 3,442 ✭✭✭NSAman


    Ok I have bought a house on a few acres. I am not tearing it down completely, it is an old home 1900 or so. What I would like to do is build around the original. It is based in the west of Ireland and has all the services already in place... I do not want a huge house..something around 1500 sq feet... I know it is "how long is a piece of string" but should 150,000 get me there?


  • Registered Users, Registered Users 2 Posts: 2,625 ✭✭✭fergus1001


    I have been onto the build cost estimator online and it's telling me 240-260 k for a 2200 sq foot house, but I'm now seeing that build costs are shooting up which worries me !

    how much would you save if you just did kitchen/living and bedroom to complete Finnish and then done the rest yourself ?


  • Registered Users, Registered Users 2 Posts: 3,261 ✭✭✭alan partridge aha


    Build house in north Wexford 2011. 2450sq feet.
    Block Walls
    150mm cavity pumped and 50mm insulated slab.
    2 banks of tube solar panels
    Ufh downstairs, rads upstairs oil condenser burner
    Breton slab
    Pvc double glazed. Palladio doors front and back.
    Own well and biocyle unit.
    €6000 paid to council.
    €10000 for kitchen.
    All tiling, sanitary ware, furniture, painting, stove, electrical items for kitchen and entertainment and carpets/laminate floors.
    Did it direct labour so it involves trusting people especially as I'm no expert. From opening site (no cost) to moving in €214000.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    NSAman wrote: »
    Ok I have bought a house on a few acres. I am not tearing it down completely, it is an old home 1900 or so. What I would like to do is build around the original. It is based in the west of Ireland and has all the services already in place... I do not want a huge house..something around 1500 sq feet... I know it is "how long is a piece of string" but should 150,000 get me there?
    You haven’t given enough info
    fergus1001 wrote: »
    I have been onto the build cost estimator online and it's telling me 240-260 k for a 2200 sq foot house, but I'm now seeing that build costs are shooting up which worries me !

    how much would you save if you just did kitchen/living and bedroom to complete Finnish and then done the rest yourself ?
    Assuming mortgage, the bank will want the place finished.


  • Registered Users, Registered Users 2 Posts: 3,442 ✭✭✭NSAman


    BryanF wrote: »
    You haven’t given enough info

    Assuming mortgage, the bank will want the place finished.

    House itself is currently around 800 sq feet.

    Addition would include bedrooms and a kitchen built outside the foot print of the main house. House would be knocked completely inside to create an open plan area.so addition would be around 700 sq ft.

    Electricity on site already, water already on site, septic was upgraded about 7 years ago.

    Obviously the old house will have to be insulated, the roof is newer.Windows will have to be completely changed and modified.and front of house will be removed to create large open view to sea.

    Anything I am missing?.. sorry this is the initial starting point for me.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 9,157 ✭✭✭893bet


    Build house in north Wexford 2011. 2450sq feet.
    Block Walls
    150mm cavity pumped and 50mm insulated slab.
    2 banks of tube solar panels
    Ufh downstairs, rads upstairs oil condenser burner
    Breton slab
    Pvc double glazed. Palladio doors front and back.
    Own well and biocyle unit.
    €6000 paid to council.
    €10000 for kitchen.
    All tiling, sanitary ware, furniture, painting, stove, electrical items for kitchen and entertainment and carpets/laminate floors.
    Did it direct labour so it involves trusting people especially as I'm no expert. From opening site (no cost) to moving in €214000.

    8 years in the middle of a huge building collapse.

    Price is of zero relevance today.

    I also built around then. My friend recently engaged the same Blocklayer and his rate is close to doubled since 2012.


  • Registered Users, Registered Users 2 Posts: 3,261 ✭✭✭alan partridge aha


    893bet wrote: »
    8 years in the middle of a huge building collapse.

    Price is of zero relevance today.

    I also built around then. My friend recently engaged the same Blocklayer and his rate is close to doubled since 2012.

    My wife's nephew has started a self build and price per block is the same as I was charged. Cost of materials have risen of course but not by a huge amount.


  • Registered Users, Registered Users 2 Posts: 3,261 ✭✭✭alan partridge aha


    Anyone that pays over €500000 to build and move into a 2500 sq feet house needs their head examined.


  • Registered Users, Registered Users 2 Posts: 2,625 ✭✭✭fergus1001


    BryanF wrote:
    Assuming mortgage, the bank will want the place finished.

    the bank need it to be "livable" ie bedroom bathroom kitchen ?


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    fergus1001 wrote: »
    the bank need it to be "livable" ie bedroom bathroom kitchen ?

    Are you asking or making a statement?


  • Registered Users, Registered Users 2 Posts: 2,625 ✭✭✭fergus1001


    BryanF wrote: »
    Are you asking or making a statement?

    im asking as thats what i have been told, but obviously not sure


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 24,465 ✭✭✭✭lawred2


    I presume finished is taken to mean livable

    Finished would hardly mean a shell without fittings


  • Registered Users, Registered Users 2 Posts: 813 ✭✭✭staples7


    893bet wrote: »
    8 years in the middle of a huge building collapse.

    Price is of zero relevance today.

    I also built around then. My friend recently engaged the same Blocklayer and his rate is close to doubled since 2012.

    Its mostly just past 2-3 years. I built in 2016 (Contractor) and even that price has no relevance. I really didn't realise to the extent that prices have inflated.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    fergus1001 wrote: »
    the bank need it to be "livable" ie bedroom bathroom kitchen ?

    Finished.
    Including landscaping/entrance/percolation and all planning conditions


  • Registered Users Posts: 4,994 ✭✭✭c.p.w.g.w


    Anyone here ever use SIP(Structural Insulated Panels) for construction?


  • Registered Users Posts: 34 bajj


    I have heard tons of prices quoted, these are mine, hopefully help people understand the costs, we are at the higher end of things based on the south coast.

    Just started:
    189sqm, block, 200mm pumped cavity, 150mm floor, all air tight taped etc, alu clad windows and doors, stone sills, ducon slab MHRV, under floor, first and second floors standard to 1 ac/hr, landscaped, limestone patio and terrace, some stone and cedar cladding, a couple of external 'features', PC sums for sanitary ware, flooring and tiling supply and fit, PC sum for kitchen. Using a Main contractor and architect managing, all fees, contributions etc, basically turn key to a reasonably high standard all coming in at €2250/sqm.

    Expensive, yes VERY, but I do not have the time, skill or inclination to do it myself. My architect has seen a house recently completed for €1200/sqm but this was the very basics so I would suggest that the costs can be realistically be somewhere between the 2 figures.


  • Advertisement
  • Closed Accounts Posts: 4,128 ✭✭✭dellas1979


    bajj wrote: »
    Expensive, yes VERY, but I do not have the time, skill or inclination to do it myself. My architect has seen a house recently completed for €1200/sqm but this was the very basics so I would suggest that the costs can be realistically be somewhere between the 2 figures.

    This is absolutely the truth. When someone comes on and asks how much does something cost to build, its how long is a piece of string.

    You can have a toilet for e80. Or a toilet for e500.

    You can have double glaze PVC for half the cost of triple glaze aluclad.

    Depends-might be an idea to have a sticky or mega thread on these types of threads?


  • Registered Users Posts: 567 ✭✭✭stretchaq


    Just about finished my 2375sqft bungalow

    total cost 231K (including fees)

    had no architect designed house myself



    full self build

    me and mates done, foundations, floors, slabs, paint, roof and all site works

    all rooms in house are finished painted 2 bedrooms no furnite

    150mm cavity therm, air to water 400mm in attic

    it can be done for these prices but a self build means a self build,

    its doesnt mean project managing a build


  • Registered Users Posts: 71 ✭✭vinnie_cork


    Got some rough prices back for by 1300ft2 refurb and 200ft2 extension and its looking like it will hit €130/sqft or circa €1400/m2.... thats allowing for energy upgrades (heating, rewiring, insulation, treple glazing etc) and structural works. Had been expecting that level, as talking to people building from scratch its hitting €185/sqft or circa €2000/m2.


  • Registered Users Posts: 53 ✭✭MrFinance


    I'm currently in the process of going through designs and had a pre-planning meeting which went well. However, planning have stated that I cannot build higher than a dormer. Regardless, my partner and I have land and are looking to build from scratch.

    180sq/m in Cork. We have 30k in savings and have been pre approved for 260k mortgage. Essentially, 290k to get it from start to turn key finish.

    Are we being completely unrealistic?

    Also. Land is level, good quality etc. We will need to get septic tank. ESB is ok.


  • Moderators, Home & Garden Moderators Posts: 10,143 Mod ✭✭✭✭BryanF


    Don’t think that budget is enough for turn key. Suggest you Reduce the size of the preplanning proposed house.


  • Registered Users, Registered Users 2 Posts: 12,587 ✭✭✭✭Calahonda52


    stretchaq wrote: »
    Just about finished my 2375sqft bungalow

    total cost 231K (including fees)

    had no architect designed house myself



    full self build

    me and mates done, foundations, floors, slabs, paint, roof and all site works

    all rooms in house are finished painted 2 bedrooms no furnite

    150mm cavity therm, air to water 400mm in attic

    it can be done for these prices but a self build means a self build,

    its doesn't mean project managing a build

    Good job.
    What was the final ACH number after the blower door test?
    How much of the 231 was subjected to all the correct taxes?

    “I can’t pay my staff or mortgage with instagram likes”.



  • Registered Users Posts: 34 bajj


    MrFinance wrote: »
    I'm currently in the process of going through designs and had a pre-planning meeting which went well. However, planning have stated that I cannot build higher than a dormer. Regardless, my partner and I have land and are looking to build from scratch.

    180sq/m in Cork. We have 30k in savings and have been pre approved for 260k mortgage. Essentially, 290k to get it from start to turn key finish.

    Are we being completely unrealistic?

    Also. Land is level, good quality etc. We will need to get septic tank. ESB is ok.

    I don't think you will manage turn key but you won't be too far off, if you are willing to look at doing some things your self you can save and get it in at that price, get a QS to draw up a bill of materials (cost approx€600) which will help identify where you can make savings.


  • Registered Users Posts: 567 ✭✭✭stretchaq


    Good job.
    What was the final ACH number after the blower door test?
    How much of the 231 was subjected to all the correct taxes?

    Don’t have a reading for ACH but I did all the detailing myself and I used to do airtightness for a living so should be quiet good, most was done through books a few bits of cash here and there but mostly to mates for doing a few hours with me


  • Registered Users, Registered Users 2 Posts: 2,500 ✭✭✭ECO_Mental


    Mod note: Duplicate post deleted. Use report function in future.

    A quick update on my situation, planning to build next year a 300m2 dormer (incl garage) architecturally designed house and Im just putting together budget prices.

    Just sent out my planning drawings to a timber frame company here in Cork that do full builds.

    Anyway for a builders finish inc **NZEB Spec**
    Underfloor heating and low temp rad upstairs + heat pump
    Supergrund Foundation
    PC Sum for Zinc of €18,500 (fancy architects :p)
    triple glazed windows

    Does Not included
    Landscaping
    driveways
    well
    flooring tiling
    kitchen and fitted furniture
    painting

    €419,400 + VAT so €476,000 or about €158/sqr meter

    Still a lot to do after this though:o another 100k easy Id say...

    6.1kWp south facing, South of Cork City



  • Registered Users, Registered Users 2 Posts: 1,375 ✭✭✭bri007


    That’s a huge house, sounds like it will look good when it’s all done. You could save some money by doing the painting yourself/garden etc.
    ECO_Mental wrote: »
    Posted this in another thread by mistake so apologies but its relevant here also....

    A quick update on my situation, planning to build next year a 300m2 dormer (incl garage) architecturally designed house and Im just putting together budget prices.

    Just sent out my planning drawings to a timber frame company here in Cork that do full builds.

    Anyway for a builders finish inc **NZEB Spec**
    Underfloor heating and low temp rad upstairs + heat pump
    Supergrund Foundation
    PC Sum for Zinc of €18,500 (fancy architects :p)
    triple glazed windows

    Does Not included
    Landscaping
    driveways
    well
    flooring tiling
    kitchen and fitted furniture
    painting

    €419,400 + VAT so €476,000 or about €158/sqr meter

    Still a lot to do after this though:o another 100k easy Id say...