Bit off yet, the NRA website says it's due to be finished Q2 2009, but anyone know if this is going to open as motorway all the way, or if not what part of it will?
Bit off yet, the NRA website says it's due to be finished Q2 2009, but anyone know if this is going to open as motorway all the way, or if not what part of it will?
This scheme is part of the current round of redesignations so it should open as a Motorway. That is the Department of Transport hurry up!:rolleyes:
Hmm, i wonder how much a trip to up the M8 to Dublin will be in terms of petrol & tolls and back again by the time the Mway is hopefully finished in 2010.
The Fermoy-Mitchelstown road is flying along(certainly from the Fermoy bypass end of bit to before Mitchelstown). It looks like they are already starting to put down some of the surfaces on parts of it, which is great.
When are we ever going to see the Motorway re-classification?
This was announced nearly a year ago, and then the Government finally had their public consultation towards the start of the year, so what are we waiting for?
I heard that Cullahill to Cashel will open by September/October 2008 - well ahead of schedule. At least, when I rang this number - 056 8838238 - that's what the girl said.
With regard to motorway redesignations, a very helpful person at the Department of Transport has informed me that the Minister received a number of objections to the proposed redesignation of HQDCs along the N/M8 route. The NRA was given an opportunity to reply to the objections, which it did. The objectors had until last Friday (June 20th) to respond to the NRA's assurances, and a number did.
So, the Minister will now assess the objectors' objections, and then will decide on the matter. Presumably the redesignations will go ahead ASAP.
I drove the sections that are opened at the weekend, the trip through Tipperary is thankfully getting shorter and shorter every time i go up the M/N8, the M7/8 Interchange will be the last come on stream im guessing?
I drove the sections that are opened at the weekend, the trip through Tipperary is thankfully getting shorter and shorter every time i go up the M/N8, the M7/8 Interchange will be the last come on stream im guessing?
Yes. The Mitchelstown to Fermoy scheme is relatively short, and rapid progress is being made there.
I haven't seen first-hand (or even heard from anyone else) how the M7/8 Portlaoise to Culahill section is moving along, but at almost 40km, it's a big project and will certainly be the final installment.
Wouldn't it have made more sense to have done Portlaoise to Culahill first before doing Cashel - Culahill as Portlaoise to Culahill contains bypasses of both Durrow and Abeyleix ?
Moderators, Technology & Internet ModeratorsPosts: 10,285Mod ✭✭✭✭
Join
Date:
Posts: 10122
Redesignation or not, the bit between Culahill and Urlingford will be motorway as it has a Motorway Order attached to it. Why they designed one scheme to the same standard, but with motorway regulations only attached to part of it, no one has ever given a clear answer.
Redesignation or not, the bit between Culahill and Urlingford will be motorway as it has a Motorway Order attached to it. Why they designed one scheme to the same standard, but with motorway regulations only attached to part of it, no one has ever given a clear answer.
I think thats because the northern terminus of that runs directly into the M7/M8 scheme with no junction, to stop people turning off and dodging the toll. That way part of it has to be motorway as once you're on it you're travelling to a motorway with no way off.
I've been trying to post pictures of the M8 Cashel to Cullahill scheme, but I think they're too big to upload.
Basically, the road has every chance of opening by October as far as I can see, which is what the locals are saying anyway.
Most of the road has been tarred and medianed. The coat of tar is by no means the final coat -- there's more to be done there. Some sections do not have the median put up yet, either. No lines have been done, and no cats eyes. There's still a bit of landscaping work to be done too. The grade seperated junction at Cashel is pretty much ready (but the median hasn't been erected yet), and the HQDC has been blended seamlessly with the Cashel Bypass; the one at Horse & Jockey is built too and is functional. The one south of Cullahill is being laid out at the moment, but isn't open to traffic yet.
Hmm. November? The new M1/N1/A1 link road looked like that - a few weeks before it opened. They appeared to just top it with asphalt pavement and paint the signs in about 2 weeks - the signs went up somewhere in here.
I'd say we could be talking September or early October, not November!
Hmm. November? The new M1/N1/A1 link road looked like that - a few weeks before it opened. They appeared to just top it with asphalt pavement and paint the signs in about 2 weeks - the signs went up somewhere in here.
I'd say we could be talking September or early October, not November!
I hope so. September was the rumour until about a month ago, but everyone seems to be saying November now.
I heard that Cullahill to Cashel will open by September/October 2008 - well ahead of schedule. At least, when I rang this number - 056 8838238 - that's what the girl said.
With regard to motorway redesignations, a very helpful person at the Department of Transport has informed me that the Minister received a number of objections to the proposed redesignation of HQDCs along the N/M8 route. The NRA was given an opportunity to reply to the objections, which it did. The objectors had until last Friday (June 20th) to respond to the NRA's assurances, and a number did.
So, the Minister will now assess the objectors' objections, and then will decide on the matter. Presumably the redesignations will go ahead ASAP.
thats great if it only 2 or so months away from the cashel to culahill section being open, currently that part of the current n8 is pain, i was on it last nite and a good old granny driver was driving 50km/h and it was pain and hard to try and overtake.
I just found out that a lot of the builders are gone on the traditional two week builders' holidays. So practically nothing will be done for the next fortnight.