Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

M7 - Naas/Newbridge Bypass Upgrade [Junction 9a now open]

18182838587

Comments

  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    BuzzFish wrote: »
    This looks odd (very minor I know)

    Shouldn't it be either one lane, or two with a line between?

    548307.jpg

    I've seen that on some roundabouts. The urlingford junction on m8 definitely has the identical markings without a dividing line.


  • Registered Users, Registered Users 2 Posts: 28,928 ✭✭✭✭_Kaiser_


    What's more annoying is the same roundabout has 3 different versions...

    Capture.jpg

    - The one called out above
    - two approach lanes marked
    - Single approach lane

    Make up yer mind FFS!


  • Registered Users, Registered Users 2 Posts: 7,036 ✭✭✭Pete_Cavan


    From the width of the road at that point, it looks to me like they put in an extra triangle incorrectly rather than forgot the dividing line.


  • Registered Users, Registered Users 2 Posts: 678 ✭✭✭jmkennedyie


    The new Clane roundabout has the lanes lined differently to the other roundabouts on the scheme. Rather than two purely circular lanes circling the roundabout, the left lane is lined out the next exit, and the right lane then crosses left to exit at the following exit.

    Anyone seen this technique elsewhere? Fine if people in the left lane take their next exit, but not so pretty if they want exit+1. I hope approach signage is clear.


  • Posts: 31,118 ✭✭✭✭ [Deleted User]


    The new Clane roundabout has the lanes lined differently to the other roundabouts on the scheme. Rather than two purely circular lanes circling the roundabout, the left lane is lined out the next exit, and the right lane then crosses left to exit at the following exit.

    Anyone seen this technique elsewhere? Fine if people in the left lane take their next exit, but not so pretty if they want exit+1. I hope approach signage is clear.
    That is a very common method in the UK and most EU countries, helps to enforce lane discipline.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 28,928 ✭✭✭✭_Kaiser_


    Pete_Cavan wrote: »
    From the width of the road at that point, it looks to me like they put in an extra triangle incorrectly rather than forgot the dividing line.

    Also looks to me that the 2 lanes in the bottom of the picture are different sizes, but maybe that's just the angle


  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    _Kaiser_ wrote: »
    What's more annoying is the same roundabout has 3 different versions...

    Capture.jpg

    - The one called out above
    - two approach lanes marked
    - Single approach lane

    Make up yer mind FFS!

    <snip> Mod: No snarky comments.


  • Registered Users, Registered Users 2 Posts: 28,928 ✭✭✭✭_Kaiser_


    Darc19 wrote: »
    Frankly they should have just employed you to design and build it as you are a phenomenal expert and seem to know everything about road construction judging by your posts

    Every criticism of this project (and not just by me) has been met with replies like the above by yourself, as though it's some sort of personal slight.

    So come on.. in what way are you connected with this project then?


  • Posts: 0 [Deleted User]


    Darc19 wrote: »
    <Snip>
    It's a really dumb roundabout, you don't need to be an expert to see how.


    Why is it two lanes? It makes no sense and just causes several areas where traffic is potentially crossing each other when attempting to exit.


  • Registered Users, Registered Users 2 Posts: 3,465 ✭✭✭JohnC.


    The new Clane roundabout has the lanes lined differently to the other roundabouts on the scheme. Rather than two purely circular lanes circling the roundabout, the left lane is lined out the next exit, and the right lane then crosses left to exit at the following exit.

    Anyone seen this technique elsewhere? Fine if people in the left lane take their next exit, but not so pretty if they want exit+1. I hope approach signage is clear.

    The Grannagh Junction Roundabout approaching Waterford does this. Of course, half the people using it have no lane discipline, so people are just meandering over and back across lines as if they weren't there.

    I'd post a satellite image, but both Google and Bing aerial images of this junction are quite bad.


  • Advertisement
  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    JohnC. wrote: »
    The Grannagh Junction Roundabout approaching Waterford does this. Of course, half the people using it have no lane discipline, so people are just meandering over and back across lines as if they weren't there.

    I'd post a satellite image, but both Google and Bing aerial images of this junction are quite bad.

    The Comber Road roundabout on the A20 Newtownards ring road was recently modified to a similar setup.

    It has actually improved the flow of traffic considerably.


  • Registered Users Posts: 736 ✭✭✭BuzzFish


    The new Clane roundabout has the lanes lined differently to the other roundabouts on the scheme. Rather than two purely circular lanes circling the roundabout, the left lane is lined out the next exit, and the right lane then crosses left to exit at the following exit.

    Anyone seen this technique elsewhere? Fine if people in the left lane take their next exit, but not so pretty if they want exit+1. I hope approach signage is clear.

    Same on the Kerry Group roundabout


  • Registered Users Posts: 862 ✭✭✭regedit


    _Kaiser_ wrote: »
    Every criticism of this project (and not just by me) has been met with replies like the above by yourself, as though it's some sort of personal slight.

    So come on.. in what way are you connected with this project then?
    The question has been asked before and he (Darc19) has never responded. So, clearly he has vested interests!
    He aggressively seeks credentials from anyone who questions the delay while never offering a glimpse of his qualifications


  • Moderators, Science, Health & Environment Moderators Posts: 19,862 Mod ✭✭✭✭Sam Russell


    Mod: Can ye stop the snarking. Speculating on posters identity is against he charter, but so is snarking.

    Give it a rest.


  • Registered Users, Registered Users 2 Posts: 35,466 ✭✭✭✭Hotblack Desiato


    Anyone seen this technique elsewhere? Fine if people in the left lane take their next exit, but not so pretty if they want exit+1. I hope approach signage is clear.

    It's a turbo roundabout.

    This one has 3 arms, so (ignoring u-turns, if allowed) there are only two possible movements from each entrance, and two lanes at each entrance, so there should be no conflict.

    Scrap the cap!



  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    If you look at the roundabout that is causing palpitations to some people, it actually makes sense.

    On the approach at the bottom, I'd would guess that 50/60% of vehicles are heading straight (1st exit), 40/50% are probably taking 2nd exit. (Effectively turning right)

    From the opposite side, traffic has probably been calculated as much lower.(obvious), so a wide two lane exit is not required but you will have some vehicles slowing to go left (into sallins I assume) so a double yield (as they have used on other roundabouts for years) makes sense for the vehicles who may move to the right of the left turning vehicle.

    Quite sensible if you think about it.

    But too many people jump on something without thinking and throw ridiculous assertions about.

    Example, left lane of m7 was said to be uneven. It was pointed out that the left lane simply was resurfaced and it suddenly was lane three.
    Or mid construction of the roundabout on Jct 10, a poster saying it was ridiculous that vehicles would have to drive to bundle of sticks roundabout to go to Newbridge.

    But the best was a couple of weeks ago when a poster said that the half completed signs probably won't be finished - you could almost hear the disappointment when they signs were completed.

    Where siac colas failed miserably was in how they communicated with the public. If they simply had a monthly blog every month, people would have been more understanding and the social media "experts" (who also seem to be covid experts too) would have had less to moan about.


  • Registered Users, Registered Users 2 Posts: 241 ✭✭champchamp


    BuzzFish wrote: »

    Does a "soft opening" mean I can drive it from next week? I've been driving the Kill-Straffan road for the last 18 years, can't wait to get off it...


  • Registered Users Posts: 214 ✭✭Golden Horde


    BuzzFish wrote: »
    This looks odd (very minor I know)

    Shouldn't it be either one lane, or two with a line between?

    548307.jpg

    Was up for a walk this evening.....lines now drawn on the road at this junction between the two triangles.


  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    Was up for a walk this evening.....lines now drawn on the road at this junction between the two triangles.

    Some people are going to be terribly disappointed with that, but I'm sure they'll find something else to find fault with


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 18,099 ✭✭✭✭Mantis Toboggan


    Was up for a walk this evening.....lines now drawn on the road at this junction between the two triangles.

    Surprised that didn't take a few weeks

    Free Palestine 🇵🇸



  • Registered Users, Registered Users 2 Posts: 7,036 ✭✭✭Pete_Cavan


    Darc19 wrote: »
    Some people are going to be terribly disappointed with that, but I'm sure they'll find something else to find fault with

    I'd say it is more likely those who tried to claim those markings were correct will be terribly disappointed if that is now proven to not be the case.


  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    Pete_Cavan wrote: »
    I'd say it is more likely those who tried to claim those markings were correct will be terribly disappointed if that is now proven to not be the case.

    Not at all, I said that such markings are in place elsewhere, so could be valid.

    If you want to check it's the urlingford junction of the M8 on the approach from urlingford.

    But certain posters continually make assumptions that XY and Z is not done only to find that they are commenting on works in progress and not the finished works.

    The mid construction comments about the roundabout on Jct 10 not being a roundabout was the funniest of them all.

    At the end of the day, communication from the project was appalling and this festered the "catastrophe" comments from people because they didn't have much knowledge of the project


  • Registered Users Posts: 736 ✭✭✭BuzzFish


    Darc19 wrote: »
    Not at all, I said that such markings are in place elsewhere, so could be valid.

    If you want to check it's the urlingford junction of the M8 on the approach from urlingford.

    But certain posters continually make assumptions that XY and Z is not done only to find that they are commenting on works in progress and not the finished works.

    The mid construction comments about the roundabout on Jct 10 not being a roundabout was the funniest of them all.

    At the end of the day, communication from the project was appalling and this festered the "catastrophe" comments from people because they didn't have much knowledge of the project

    Tell the truth Darc.... ye told the lads to fix it when ye got to site the other day after we pointed it out? I think you really appreciate our feedback :pac:


  • Registered Users, Registered Users 2 Posts: 3,817 ✭✭✭Darc19


    BuzzFish wrote: »
    Tell the truth Darc.... ye told the lads to fix it when ye got to site the other day after we pointed it out? I think you really appreciate our feedback :pac:

    Terrible trouble trying to explain it to them and had to translate the comments into Polish :D

    But we got there in the end with a bit of masking tape and masonry paint - sure it will do :)


  • Registered Users, Registered Users 2 Posts: 1,665 ✭✭✭traco


    Drove down the ring road this morning. Looks like a fair bit of tidying up to be done on it yet.

    I would guess at this stage it won't open until Tuesday/Wednesday at the earliest. Can't see them getting everything sorted and also being a bank holiday weekend with everyone off I doubt that they will take an risk in case there is an issue or problem.


  • Registered Users, Registered Users 2 Posts: 1,216 ✭✭✭cargo


    MYSTICA1 wrote: »


    Well that's confirmation that the Sallins bypass will be open before 4th May as it's listed in that notice as an alternative route....

    Now anyone got any closer dates?


  • Registered Users Posts: 7 riggersmark


    cargo wrote: »
    Well that's confirmation that the Sallins bypass will be open before 4th May as it's listed in that notice as an alternative route....

    Now anyone got any closer dates?

    I would imagine its getting very close as they have removed some of the black bag coverings that have been covering up the exit 9a signs for months.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 11,498 ✭✭✭✭fullstop


    MYSTICA1 wrote: »
    However ....

    Irish Motorway Info website says the following. (I have no idea how reliable or otherwise this website is!)

    The long suffering new M7 junction 9A is to open at the end of March. This piece of infrastructure has been repeatedly delayed and it's fair to say at this stage that we will believe it when we see it. Recently some work had to be redone to address deficiencies. Note that the Sallins bypass will not open at that time; for now the junction will only facilitate access to north Naas.

    Another opening date comes and goes for J9a and still no movement.


  • Registered Users Posts: 125 ✭✭MYSTICA1




  • Registered Users Posts: 156 ✭✭Kevtherev1


    MYSTICA1 wrote: »


    So somebody nearby go out in their car and drive it to confirm etc


  • Registered Users Posts: 125 ✭✭MYSTICA1


    Kevtherev1 wrote: »
    So somebody nearby go out in their car and drive it to confirm etc

    There are people who post on this forum who can see it from their house. No need to be a smart ass.


  • Registered Users Posts: 7 riggersmark


    I'll be passing by in the morning I'll let u all know if its not confirmed by then


  • Registered Users Posts: 125 ✭✭MYSTICA1


    I have been told elsewhere that it is not, in fact, open this evening. Over-eager reporting by the politician and journalist again&#55357;&#56898;


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 11,498 ✭✭✭✭fullstop


    MYSTICA1 wrote: »

    Page/article is gone, and no I don’t believe it’s open as 9a would have to be open and the barricades are still up.


  • Registered Users Posts: 736 ✭✭✭BuzzFish


    Not open. Passed Kerry Group at 7pm and junction all closed up. And traffic lights powered off.

    Suprise surprise, Mr Clear jumps the gun again.

    549414.jpg


  • Registered Users Posts: 7 riggersmark


    9a junction still closed at 8am on Wednesday morning. Just passed and barriers are still up


  • Registered Users Posts: 1,034 ✭✭✭riddlinrussell


    BuzzFish wrote: »
    Not open. Passed Kerry Group at 7pm and junction all closed up. And traffic lights powered off.

    Suprise surprise, Mr Clear jumps the gun again.

    *snip*

    To be fair to him on this one, he isn't quoted as saying its open, just about the upcoming millbank closure. Not that he hasn't jumped the gun before.

    This seems like an over-eager reporter moreso.

    It is opening very imminently, but yeah not yet.


  • Registered Users Posts: 7 riggersmark


    Finally some official news. Exit 9a opening Friday Morning


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,036 ✭✭✭Pete_Cavan


    Do we know yet what road number the Sallins Bypass will have? It probably should have been a National Secondary and immediately look to extend it, bypassing Clane and joining the R408 east of Rathcoffey. Maybe even take in the R445 so that it would eventually run from Newbridge to Maynooth, it would be a relatively short National Secondary but traffic volumes and road standard could be well above many NSs.


  • Registered Users Posts: 1,034 ✭✭✭riddlinrussell


    Pete_Cavan wrote: »
    Do we know yet what road number the Sallins Bypass will have? It probably should have been a National Secondary and immediately look to extend it, bypassing Clane and joining the R408 east of Rathcoffey. Maybe even take in the R445 so that it would eventually run from Newbridge to Maynooth, it would be a relatively short National Secondary but traffic volumes and road standard could be well above many NSs.

    According to the Kildare CC notification on the closure of Millbank road

    ROAD TO BE CLOSED

    Sallins Link Road (L1102)

    (Millbank Road)


    From (Junction with)

    Roundabout on Sallins Bypass (R407)


    To (Junction with)

    Clane Rd (L3014)

    So the current R407 (The road through Sallins) is becoming the L3014, the Bypass becomes the new R407 and the Sallins link road itself is the new L1102


  • Registered Users, Registered Users 2 Posts: 678 ✭✭✭jmkennedyie


    Regarding extending northwards...there is a strategic reservation zoning just east of Clane to facilitate a long term Liffey crossing to Celbridge Road at least, but no route to Bodenstown reserved or earmarked...that will be an interesting alignment due to studs, farmlands, mature woodland, etc.

    Sections of existing R407 Clane to Kilcock Road upgraded over recent years. Would be surprised if a different alignment veers in towards Rathcoffey...and R408 is a very basic road. Main commercial traffic appears to head to Kilcock and M4...lots of national distribution centres in the region for supermarket chains etc and more on the way...application for one North of Sallins IIRC.

    Reservations exist for several short relief roads around Clane village...Celbridge/Kilcock expected to start construction soon, others years out if ever.

    Finally, for what it is worth the Leinster Outer Orbital Route is a long term national primary road route reservation west of Clane from Newbridge/Naas to Trim/Navan as I recall and over to Drogheda.


  • Registered Users, Registered Users 2 Posts: 7,036 ✭✭✭Pete_Cavan


    Regarding extending northwards...there is a strategic reservation zoning just east of Clane to facilitate a long term Liffey crossing to Celbridge Road at least, but no route to Bodenstown reserved or earmarked...that will be an interesting alignment due to studs, farmlands, mature woodland, etc.

    Sections of existing R407 Clane to Kilcock Road upgraded over recent years. Would be surprised if a different alignment veers in towards Rathcoffey...and R408 is a very basic road. Main commercial traffic appears to head to Kilcock and M4...lots of national distribution centres in the region for supermarket chains etc and more on the way...application for one North of Sallins IIRC.

    Reservations exist for several short relief roads around Clane village...Celbridge/Kilcock expected to start construction soon, others years out if ever.

    Finally, for what it is worth the Leinster Outer Orbital Route is a long term national primary road route reservation west of Clane from Newbridge/Naas to Trim/Navan as I recall and over to Drogheda.

    Bodenstown Golf Course closed didn't it? Could be an option for part of an extension north.

    The R408 would need upgrading but I was thinking in terms of potentially a new M4 junction to replace the existing substandard Maynooth junction.

    The Outer Orbital Route has no formal reservation and I'm not sure that is even part of any current policy or strategy documents. It is unlikely to ever happen.


  • Posts: 0 [Deleted User]


    The Leinster Orbital Route is not part of any plan or forecasts. It's not mentioned in any recent policy documents. It'll never happen IMO.


  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    The Leinster Orbital Route is not part of any plan or forecasts. It's not mentioned in any recent policy documents. It'll never happen IMO.

    Sadly, I agree with you.


  • Registered Users, Registered Users 2 Posts: 1,753 ✭✭✭KrisW1001


    I always thought that the problem that the Leinster Outer Orbital has been put forward as a solution for is better solved by improving the National Secondary network outside Leinster, and the Regional route network in Kildare, Meath and Louth.

    The further away from the M7/M9 junction you get, the more options there are on the National Secondary network to reach M1 without coming near to Dublin - it would be better to upgrade these than try to drive a new motorway through the most densely populated part of the country. Closer to Dublin, more 2+2 express routes (like this new bypass) around bottleneck towns in Leinster will give the Leinster-originated traffic a good alternative route across the province that doesn't involve the M50.


  • Registered Users Posts: 214 ✭✭Golden Horde


    Wonder why the Sallins bypass is opening but the link road into Sallins isn't.

    Seeing as Kildare Co Co have issued a closure notice for the road (Millbank part - with the new link road staying open) for 6 weeks in May-June, they obviously see it being opened by then - just not tomorrow...?


  • Registered Users Posts: 667 ✭✭✭BelfastVanMan


    Wonder why the Sallins bypass is opening but the link road into Sallins isn't.

    Seeing as Kildare Co Co have issued a closure notice for the road (Millbank part - with the new link road staying open) for 6 weeks in May-June, they obviously see it being opened by then - just not tomorrow...?

    The existing, i.e. the old part of the link road, closest to the town, still badly needs resurfaced.


  • Registered Users Posts: 214 ✭✭Golden Horde


    The existing, i.e. the old part of the link road, closest to the town, still badly needs resurfaced.

    Seems strange though as the old part is in use anyways and we know they are closing it to re-surface and redo the paths next month.

    I just don't get why the full link road won't open as part of the main scheme. It seems ready and is part of the solution for Millbank residents while the old part is being redone. So Kildare CoCo will have it open next month when the old part is closed - I suppose I'm wondering out loud why it's not ready to go tomorrow.