Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Dublin Metrolink - future routes for next Metrolink

13132343637

Comments

  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Luas opened in 2004

    In 2003 DB carried 149 million in 2005 they carried 146 million.

    Today DB + GAI carry 157 million.



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer


    It took time for most of the changes to happen rather than it happening straight away and a lot of the changes happened as part of Network Direct which saw some routes merging with others.

    Green Line:

    No routes cancelled initially, but frequency dropped on both the 11 and 48a, substantially on the latter.

    The 48a was withdrawn and replaced by the 61 between the city and Dundrum as part of Network Direct some years later, with the 14/14a replacing it between Ballinteer and Dundrum.

    Route 13b from City Centre to Palmerston Park via Ranelagh was withdrawn subsequently, removing the bus service along much of Palmerston Road, but this was already a low frequency route.

    The 14a was also merged with the 14 as part of Network Direct, and replaced by the 128 serving Upper Rathmines Road (although there was no drop in combined 14/14a frequency when compared with the new 14). This change removed the bus service along Lower Churchtown Road and Dartry Road.

    Route 44c to/from Ballyogan was withdrawn some years later as well, and there were service cutbacks on the 44 as well at certain times.

    Red Line:

    No routes cancelled initially, but the 56/56a frequency was cut significantly after some time.

    Route 50 was withdrawn subsequently as part of Network Direct - this removed the bus service from Mayberry Road in Kilnamanagh.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    And just to add to these numbers, last year Luas carried over 48 million passengers! Equivalent of 1/3rd of the entire Dublin City Bus network on just two lines! Imagine how screwed we would be if we didn’t have them!



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer


    Dublin City bus fleet is about 1,200 vehicles.

    It's about 1,279 now since the latest BusConnects phase (186 at GAI and 1,093 at DB).



  • Registered Users Posts: 1,337 ✭✭✭Consonata


    It's not majorly narrow really, the biggest pinchpoint that you'd have to negotiate is +/-500m at Donnybrook stadium, south of that its 6-8 lanes basically till the motorway, north of that it's never narrower than 4 lanes, with it more often being 5 or more.



  • Advertisement
  • Registered Users Posts: 823 ✭✭✭spillit67


    It is narrow right up Morehampton Road though.

    Yes is clears beyond the Church.



  • Moderators, Science, Health & Environment Moderators Posts: 5,148 Mod ✭✭✭✭spacetweek




  • Registered Users, Registered Users 2 Posts: 397 ✭✭TheSunIsShining




  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    I wonder if more radial Luas lines are really the best way forward at all. I know it's tempting to look at a wide dual carriageway and assume a Luas is the best option but a part of me thinks we will just end up revisiting all these radial Luas lines and upgrading them to metro at even greater expense. Luas has a role to play but is it in radial transport? I'm not sure. A SW metro to fill in that large gap combined with more orbital Luas feeder lines (initially bus routes of course) has a certain appeal. I think all the radial routes need to be high capacity fully automated rapid rail transit to be honest.



  • Registered Users, Registered Users 2 Posts: 1,765 ✭✭✭KrisW1001


    Plan the type of transport based on expected demand. If a radial route is far too busy for bus, then a tram is the next step. If it's far to busy for trams, then either add branching services to spread passengers, or upgrade to metro, or both.

    A denser tram network in the city would do a lot to make the longer-distance services more attractive.



  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Most similar sized European cities have very large tram networks (and of course Metro too). Amsterdam has 19 trams lines, Berlin 22, etc. Basically the norm is an extensive tram network supported by key Metro lines that tie the network together.

    Sure, it would be nicer to have a dozen Metro lines, but would be hard to justify the 100 Billion or so that it would cost.



  • Moderators, Science, Health & Environment Moderators Posts: 19,873 Mod ✭✭✭✭Sam Russell


    Running a Luas line along from Rialto mainly along the South Circular to Grand Canal Dock would provide an excellent orbital route.

    By connecting with the GL at Harcourt allow trams from both Rialto and GCD to divert to SSG and onto OCS and beyond. At Rialto, trams could go onto Heuston, or out towards Tallaght.

    Think of the number of tram lines that would allow - with frequency driven by demand.



  • Registered Users Posts: 823 ✭✭✭spillit67


    I am of the belief that this will actually be the next line- perhaps as a Metro or DART Tunnel.

    It provides the most utility for the most people & can be “sold”.



  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    In German cities at least, tram lines tend to either supplement the metro and heavy rail networks (Berlin, Munich, Frankfurt) or function as pre-metro (so tunneled in the city centres to avoid all the on street conflicts, eg Cologne, Stuttgart). Running trams as primary radial routes without city centre segregation only happens in much smaller towns and cities (eg Potsdam, Bielefeld, not really comparable with Dublin). If we were prepared to go pre-metro I'd accept that trams can "do the job" but that also means no automation in future. I see the Red Line as something we really should not be looking to replicate. But hey, I know the political reality means we'll probably build nothing. I still don't really believe Metrolink will be built. I'll believe it when I see it as they say.



  • Moderators, Sports Moderators Posts: 27,306 Mod ✭✭✭✭Podge_irl


     But hey, I know the political reality means we'll probably build nothing

    I genuinely don't understand what political reality people think means this.

    It is a popular project that will only reward people who get it in motion.



  • Registered Users, Registered Users 2 Posts: 259 ✭✭DaBluBoi


    I see the Red Line as something we really should not be looking to replicate

    Apologies if this doesn't relate well to the main topic, but could you elaborate on this point? Are you referring to the non-direct it takes from Heuston to Tallaght, with the amount of turns it takes? Otherwise, it does have very good patronage.



  • Registered Users, Registered Users 2 Posts: 1,765 ✭✭✭KrisW1001


    There's nothing wrong with Red for what it is. The Red Line is a classic tram service, typical of continental cities: primarily on street with stops every 500-800 metres. The southern end of Green Line is more like a pre-Metro: running on its own segregated way, with wider spacing between stops.

    The type of stop is also different: Red has on-street stopping, typical of a tram system, but the Charlemont-Sandyford Green line has "stations" separated from the surrounding streets.

    Demand from South-west Dublin would justify higher capacity than Red can deliver, but that does not automatically mean replacing it with a Metro: The goal of meeting passengsr demand could also be achieved with a couple more on-street tram lines serving different parts of the city's southwestern suburbs.



  • Registered Users, Registered Users 2 Posts: 10,774 ✭✭✭✭tom1ie


    The more I look at google maps the more I come to the conclusion, that if a LUAS was the only option on the table for the SW it would have to have a core route into/out of the cc and split at Ballyboden Rd- one leg going east towards Glencairn GL stop and one leg going west towards tallaght P+R stop on the red line.

    The route from the red line P+R stop would be roughly:

    tallaght P+R

    Old Bawn rd

    Killinininy road

    st colmcilles way

    scholarstown rd

    Ballyboden way

    The roundabout at Ballyboden way/ Taylor’s lane/ Ballyboden road/ Edmondstown rd- this is where the LUAS can either continue along Taylor’s lane towards glencairn GL stop which would create an orbital route from tallaght to sandyford, or the LUAS can continue on towards the cc via:

    Ballyboden road

    Willbrook rd (quite narrow here, car traffic reduced to one way)

    Rathfarnham rd

    Terenure rd north

    Harold’s cross rd

    clanbrassil street upper

    Clanbrassil street lower

    New street

    patricks street

    Christ church sq

    The other leg splitting at the the roundabout at Ballyboden way, heading towards glencairn GL stop would be:

    Taylor’s lane

    Grange rd

    Brehon field rd

    The link road that runs parallel with the M50- no name on google maps

    Leopardstown rd

    Murphystown way

    Glencairn GL stop



  • Registered Users Posts: 1,034 ✭✭✭riddlinrussell


    I'd argue the red line from Rialto out to Belgard operates like a _very slow_ metro with some at grade crossings, either on segregated track or in the central median of the road, there is probably an argument to be made for a few underpasses and improvements to separation along that section, and then tunnel from there under the city for a cheaper "metroisation" of the outer red line.

    The stub line from James's could extend out to Blackhorse via Inchicore for interchange and operate more like other European trams, rather than the very large distances which are quite unusual for our system.



  • Registered Users Posts: 1,231 ✭✭✭gjim


    The annoying thing with the Green line is that you have pre-metro sections (south of Charlemont and north of Broadstone) with an on-street bottleneck section in the middle which capacity constrains the line as a whole and "wastes" the highly segregated sections. The ML extension will - if it ever happens - unlock the potential of the old Harcourt alignment. When that happens, I would continue the Green Luas south as a primarily on-street tram by heading out to Terenure or East to Ringsend from Harcourt.

    Street trams play an important part of a PT network; ideally you have a reasonably dense network of street trams in the core that distributes commuters around the core, whether arriving via metro or heavy rail to a "central" station or whether arriving at the fringe of the core via buses.

    Dublin has a very strange take on the hierarchy of public transport modes. We have bus capacity concentrated in the core, very little core/central through-running metro/heavy rail capacity, and tram lines that extend through far outer suburbs. The lack of high capacity access to the core will be addressed somewhat with ML and hopefully DART underground gets dusted off too. But there doesn't seem to be a plan for the first issue. I would confine all new tram construction to within the canals or thereabouts.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    Yup. The primary problem with the Red Line is that it just takes far too long to cover a fairly short distance. It's built now and I think that there should be a series of works to eliminate conflicting movements in the outer suburbs (underpasses, overpasses) and really in the city from possibly the Black Lion it should go underground or at the latest around Rialto. The city centre on street running doesn't match the outer suburban off street sections. The capacity is killed in the city. We should not build any more radial routes like this. The least we should aspire to is pre-metro tunneled trams in the city centre if we can't go full metro. You'd be better off building fewer radial metro routes fed by orbital bus corridors than several radial tram lines like the Red line. That's my take on it.



  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    I left Ireland in 2009. Virtually nothing on rails has been built since then. Plenty of reports and whatnot. I guess it's made me cynical.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Well we all know what happened around 2009 and on!

    The least we should aspire to is pre-metro tunneled trams in the city centre if we can't go full metro.

    That isn't really realistic. It is the tunnelling that makes Metros expensive, not tram versus Metro. There would be relatively very little cost difference between a tunnelled Luas line and a tunnelled Metro line.

    So the question isn't really Luas v Metro, it is tunnelled or not tunnelled. If you are going to tunnel, it might as well be a Metro.

    You'd be better off building fewer radial metro routes fed by orbital bus corridors than several radial tram lines like the Red line.

    I'm not sure I agree, the thing is you could build Luas lines on all the radial routes for the cost of just one Metro line. We built both the Green and Red lines for a total of 750 million combined, of course costs have increased, so lets say the price has doubled, so 750 million per line. A Metro, is about 5 to 10 billion. You could build 6 to 12 Luas lines for the cost of one Metro line!

    I also not sure you are right by the lack of utility of such street running tram lines. The Green line can carry up to 8,000 people per hour per direction, despite it's street running sections. That would be a massive upgrade over the 1,700 or so a double decker bus at 3 minutes frequency can carry. That is like a 5 fold increase in capacity and far more reliable. That really would be a fantastic increase in capacity for all these radial routes.

    Those of us who life on the likes of the Swords road corridor would give our right arm to have Luas.



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer


    There is only so far that you can go developing LUAS lines along suburban roads given the roadwidth and the need to retain a reasonable network of roads accessible to all.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    But most of the radial routes are QBC bus corridors and with the BusConnects infrastructure work, they will be even more so. That is plenty of space to replace these with mixed Luas/Bus routes.

    I mean you'd easily put a Luas down the Swords road and that would be true for at least half of the radial routes.

    Sure there maybe some pinch points on other routes, shrug, there are various approaches to help deal with that, one way streets, etc. This isn't rocket science, most other European cities have been doing this for decades. There are plenty of tram only roads in cities all over Europe. There really isn't anything special about Dublin in this regard.

    We just have to be willing to prioritise public transport.



  • Registered Users, Registered Users 2 Posts: 2,193 ✭✭✭Fian


    Can I ask a question about how a green line luas upgrade would work? I live near dundrum luas station and was pretty outraged at the decision to stop the metro at charlemont rather than continue it on the green line, seemed like such a stupid waste of money and ambition to placate a few loud voices.

    However something that had not occurred to me is whether this would mean the loss of stops? Would a metro stop at all the existing luas stops or would it stop far less frequently as it seems to do north of charlemont? This would be very unlikely to directly impact me, since Dundrum is kind of a no-brainer stop and would be very unlikely to be dropped, if I take the luas to work I exit at stephen's green now and the new station owuld actually be closer to my office. I cycle to work anyway unless it is icy or something. But I can see it impacting others and it strikes me that a luas line with frequent stops and connecting to the metro in Charlemont might be preferable than a metro line with a third the number of stations.



  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    I wouldn't agree that pre-metros cost the same as metros because of the city centre tunnelling required. If that were true then pre-metros in places like Cologne, Stuttgart etc. simply wouldn't exist, they'd all be full metros. The pre-metro is a tram network with underground central running only. All the other (initial) costs are saved: line of sight running with very basic signalling, conflicts with road traffic in the suburbs (where there's more room) are allowed and don't require full grade separation. It's the city centre traffic that limits the Red Line's capacity though, not so much the traffic on the Naas Road or Belgard Road.

    There would be a massive price difference between the red line put underground from Rialto + a bit of grade separation at busier junctions (eg Long Mile Road/Naas Road) and putting entire Red line underground or otherwise fully grade separated. The Red line is actually a really good candidate to be converted to pre-metro IMO. Beyone Rialto there are nice long stretches of free running and the pinch points mentioned above could be tackled one by one to bring the service up to something much closer to a metro service, both in speed and frequency. I kind of expect this to happen if we ever get comfortable with actually building railways in tunnels.

    I could actually live quite happily with radial pre-metro too I guess. I just don't think radial tram lines that snake all the way through city streets before getting out to more free running sections in the suburbs make any sense. The Red Line is undoubtedly popular, because it's the best there is on offer, but I don't think it should serve as a template for future projects. With some clever design you could funnel several suburban street running trams through a pair of north/south and east/west tunnels in the city. You wouldn't have to tunnel every single line right across the city individually. The lines could share the core city centre tunnels.



  • Registered Users, Registered Users 2 Posts: 15,115 ✭✭✭✭loyatemu


    I don't think they were planning to close any stops - the upgrade process from the original plan is in this post



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer


    I’d refer you to the graphic that I posted on page 53.

    You'd still have the same number of stops as far as Beechwood, but then you would change to LUAS there if needs be.



  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    TII actually looked into this. Back in 2017 they considered building Metrolink as a Luas line that went underground in the city center versus a Metro. The report found very little cost difference between the two, but much lower capacity with the Luas option, thus Metrolink, the report is online if you are interested.

    By far the highest cost of these projects is the actual tunnelling, the TBM, followed by building the station box. Obviously it wouldn't matter if it was a tram or a Metro, those two costs would be similar.

    Signalling would be a rounding error in a project like this.

    Sure, if you wanted to save some money, you could have it built in the suburbs as non-segregated. You could still do that as a Metro, the only difference would be the height of the platforms. Obviously the Metro would need to be driver operated [1] rather then fully operated, which would save you some money on full automation and platform screen doors.

    But you are still talking about multi billion euro projects either way, with maybe saving a few hundred million here or there.

    [1] Siemens actually has a fully automated tram running in Potsdam that has non-segregated running, so if that continues to develop it might be an option.

    BTW The reason I suggest high floor Metro rather then low floor Luas, well with the Green line, we now see the issues with upgrading it from low floor operations to high floor. If you want to build a pre-metro that you think you want to upgrade to Metro in the future, then better to start off all high floor, makes for an easier upgrade path. And yes, if you want there are high floor trams too.

    Post edited by bk on


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Broadly speaking, all the Luas stops would be converted to Metro. The distance between Luas stations on the Green line is already quite far for a tram line and more Metro like.

    The exceptions would be where the Metrolink line connects to the Green line. For instance if it connects south of Beechwood, then Beehwood station and the other stations north of it would remain Luas stations on the Green line. so it would look like this:

    • Metrolink Swords (via Beechwood) to Sandyford
    • Luas Green Line Fingals to Beechwood

    Note those are just an example, there are different options on how they connect the lines that might change the above (e.g. North or South of Beechwood, etc.).

    For you at Dundrum, it would basically be a very nice upgrade to Metro.



  • Registered Users, Registered Users 2 Posts: 259 ✭✭DaBluBoi


    What would happen to the Broombridge branch then? Would it turn into its own separate line?



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer




  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Finglas is a northern extension from Broombridge, so it would still be there. Or if you prefer, Finglas - Broombridge - City Center - Beechwood



  • Registered Users Posts: 823 ✭✭✭spillit67


    Tunnelling is definitely a “waste” with light rail but shouldn’t be ruled out for some really short sections where you can unlock good connectivity.

    To me we definitely need heavy rail going across the south city next. If that is along the South Circular Road, the Grand Canal or through the traditional DU route that’s fine with me. All routes to me “unlock” the city in ways that we will fine the Metrolink/DART+/Luas combo will in the north inner city.

    The more I look personally I think either a SCR or Canal route is best, primarily because it can be sold to a large swathe of the Dublin population. The ability to be able to get from Docklands/GCD to Heuston in 10 mins would be a gamechanger for the brownfield sites of the city centre and no CBA will ever capture it adequately.



  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    Yes, I was just looking at the post 2042 Luas network, most of the new proposed new liens don't need a tunnel, however arguably there looks to be a need for perhaps one East to West Tunnel. Here waht the proposed lines look at:

    • 2 Lines the UCD one and Knocklyon meet at Charelmont, where you either continue on the Green line or Switch to Metrolink, so obviously Metrolink tunnel already covers those.
    • Clongriffin line looks to plug into the eastern end of the Red line. The eastern end of the Red line tends to be not to busy, so it should be able to handle it. Basically every second tram one going to Poolbeg the other to Clongriffin. No tunnel needed.
    • Swords Road/Ballygriffin line, basically a completely new line, down the Swords Road and down Gardiner street, parallel to the Green Line. Pretty easy to do, plenty of road space, basically recreating the old planned Swiftway/BRT route. Definitely no tunnel needed.
    • Tyrrelstown line, basically joins the Green line at Broombridge. Should be fine, the Green line is relatively quiet north of O'Connell St. Even with the extension to Fingals I'd say it would be fine. Basically every second tram to either Finglas or Tyrrelstown. No tunnel needed.

    Now we get into the more complex parts. First of all they have the Lucan Luas line, which has been discussed before. But then they have new lines that connect into either the Red line or Lucan line and I'm not sure how there would be the capacity for that.

    • Blanchardstown line connecting into the Red line in tow. I have no idea how it could have the capacity for this!
    • Clondalkin into the red line. Again I don't see how the capacity there is for that.
    • Kimmage line into the Lucan line, maybe there would be enough capacity for this, maybe.

    I'm not sure how you'd make these three lines work. Perhaps if the Lucan line was underground in the city center like suggested earlier, then there might enough capacity to handle these lines.

    Or perhaps they think it might work if you split traffic between both the Red Line and Lucan line. Most Tallaght traffic goes via the new Knocklyon line, leaving space for Clondalkin line to feed into the Red line. Though Blanchardstown would still be a bit of a head scratcher.

    Of course if you built the Lucan line as a tunnel, where would that leave DART Underground!



  • Registered Users, Registered Users 2 Posts: 1,765 ✭✭✭KrisW1001


    They don't have to be underground in the city centre, but rather branch out into different city-centre routes. That's how European cities manage the lower line capacity of on-street trams in centres.



  • Registered Users Posts: 630 ✭✭✭loco_scolo


    If you split the Red Line at James with a spur to College Green / Pearse Street, then you significantly increase CC capacity. Between Blackhorse and James' the line is well segregated from traffic/conflicts and should handle additional trams coming from various directions.

    The Dart West upgrade + BusConnects will take most of the Blanch-CityCentre demand, so it's not as though the full Blanch demand would be a single Luas line. The Lucan spur would also interchange with Dart SW.

    Once Dart+ and Metro are complete, there'll be a substantial high capacity network with lots of good interchange stations supported by a larger Luas Tram network.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,006 Mod ✭✭✭✭bk


    kris, loco, you are right, stepping back and looking at the wider network and how it all fits together, it makes a great deal of sense.

    I actually some how missed that the map includes Dart Underground! It is a small map, you really have to squint at it. The Kimmage line actually feeds into DU, which makes more sense. As you say the Blanchardstown line connects into Dart+ West and the Lucan line into Dart+ SW.

    Id say that would all work really well. The more I think about it the more it all makes a great deal of sense and would give us a great comprehensive transport network that would transform Dublin.

    Other then DU, most of these would be relatively straight forward, fast and affordable to deliver.



  • Registered Users, Registered Users 2 Posts: 10,774 ✭✭✭✭tom1ie


    Are you talking about a spur coming off east of the Fatima stop?

    What route would it take towards college green/ pearse street? If it went up college green is that not an interaction with the GL and hence cutting the existing throughput on the GL CC?



  • Advertisement
  • Registered Users Posts: 630 ✭✭✭loco_scolo


    No from James' Hospital down to College Green via Thomas Street. With College Green closed to general traffic, that route is ideal for a Luas line.

    This would double East-West capacity in the city centre and could be built relatively quickly.

    If the spur was continued across College Green to Pearse Street, it would offer a much better connection with Metro at Tara, versus the poor connection from Abbey Red Line to OCS Metro.




  • Registered Users Posts: 823 ✭✭✭spillit67


    College Green to me is where a tunnel might make some sense. If you are connecting the Green with the Red there, you could do it on street but if we are going to dig up at what most consider the “centre” of the city for a plaza, why not a short underground interchange that frees up space above ground?

    I’d also like to see a spur from the Green closer to SSG that goes down Baggot Street as part as the bottom of Pembroke Street. Or if too narrow, swing left down Nassau, over Merrion Square and down Mount Street. Indeed it come form part of any interchange at College Green- in effect a “new” line from James down towards Ballsbridge.

    You could run all sort of different lines and routes.

    Indeed it could ultimately get to Poolbeg and provide a full circle Luas line for the city.



  • Registered Users, Registered Users 2 Posts: 9,761 ✭✭✭cgcsb


    A Lucan to Ringsend luas stopping at templebar and and Tara Street makes much more sense in terms of adding capacity, this would free up the red line for more local trips, the Heuston to Docklands section is currently rammed beyond its capacity.



  • Registered Users Posts: 97 ✭✭citizen6


    Does the plan for College Green plaza allow buses through from Dame St? I assume the same would apply to a Luas Red Line extension.

    Even if not, James' to Dame St would be very useful. I wonder would they develop that separate to rest of Lucan Luas.



  • Registered Users, Registered Users 2 Posts: 17,941 ✭✭✭✭LXFlyer


    No buses will be going between College Green and the Dame Street/George's Street Junction.

    There will however by three north/south Spines (A, E and F) and one radial bus route (85) going from Grafton Street to O'Connell Street, and they will be sharing that space with trams in both directions on College Green.

    That will be between 45-60 buses an hour in each direction.



  • Registered Users Posts: 1,337 ✭✭✭Consonata


    If Metrolink were to be extended to Sandyford, would there be an argument of utilising the old Foxrock alignment of the Harcourt St. line through the racecourse, potentially doing some TOD there, down to Bray?

    Main reasons' why I'm thinking this is that it will be nigh on impossible to resolve the LC issues on the Carrickmines branch, and that section of track could be connected instead to an N11 Luas in the future.



  • Registered Users, Registered Users 2 Posts: 7,644 ✭✭✭prunudo


    I'd definitely be one for advocating any Metrolink, whether upgrade or new route, which goes to Sandyford, should have provisions to be extended further south.

    What route it takes is up for debate, but personally think it should go further east, linking Foxrock, Cornelscourt, Cabinteely, Ballybrack and connecting Dart line at Shanganagh.

    Luas to Bray from Cherrywood is nice, but the sytem is too slow for serious commuting imo. Its a city tram line, not suitable for mass transit for 10km.



  • Registered Users Posts: 1,337 ✭✭✭Consonata


    Was thinking something like this. The N11 Luas is currently "Post 2042" but there are a couple of way it could utilised. If the old Harcourt alignment was reclaimed, since it is still there for the most part, you have the benefit of avoiding all the level crossing south of the M50 and in Sandyford. Leopardstown Racecourse could be redeveloped into mixed residential, and Metrolink would get the benefit of a much more direct railway alignment, likely much faster and able run at higher capacity.

    (Apologies for the crayons, I recognise a lot of this is ficticious however the Eastern Bypass alignment is intact west of the N11 and could be used as a corridor for a future Green line extension.



  • Registered Users, Registered Users 2 Posts: 7,644 ✭✭✭prunudo


    makes sense and has the benefits of serving high density Cherrywood with higher capacity metro and fast service from Bray.



  • Registered Users Posts: 823 ✭✭✭spillit67


    The only issue I have with that (and the Eastern Bypass route) is that it really does overlap with the existing Green Line catchment south of UCD.

    I’d prefer it to at least get to Stillorgan and Blakes Corner junction & taking in some more of the dense N11 developments.

    That said, that‘s the third or fourth priority after connecting a Donnybrook, UCD and relieving Sandyford.



  • Advertisement
Advertisement