  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    The first 2.5km on the Sligo side is an online widening/upgrade which includes the construction of a parallel road to facilitate access


  • Registered Users Posts: 5,542 ✭✭✭veryangryman


    marno21 wrote: »
    The first 2.5km on the Sligo side is an online widening/upgrade which includes the construction of a parallel road to facilitate access

    The access road hardly needs 2 years of stop/go though. Just seems like poor inefficient engineering.

    The unmarked cop at Castlebaldwin will be redundant if the stop/go is near him.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Some nice shots of early works on this scheme courtesy Sligo County Council

    https://twitter.com/sligococo/status/1116696235799457792


  • Registered Users Posts: 315 ✭✭steeler j


    marno21 wrote: »
    Some nice shots of early works on this scheme courtesy Sligo County Council

    https://twitter.com/sligococo/status/1116696235799457792

    nice photos


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Blasting now underway 4km north of Castlebaldwin for 8 months

    https://twitter.com/sligococo/status/1142108211526426624


  • Advertisement
  • Registered Users Posts: 397 ✭✭Geogregor




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Also, a flythrough over the most northern part of the scheme: https://vimeo.com/337560892


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Pics of site prep May 2019:

    ch-8800s.jpg

    ch-900-epl-s.jpg

    ch-7000s.jpg

    ch-6800s.jpg

    ch-4300s.jpg


    June 2019 earthworks:

    ch9plus350-rhs-in-borrow-pit-2.jpg

    dscn0161.jpg

    dscn0123.jpg

    ch9plus350-rhs-in-borrow-pit-5.jpg

    dscn0056.jpg


    All credit to Roadbridge @ www.n4realignment.ie

    This is scheduled for a Q4 2021 opening. Seems a long way off (even with the required online upgrade at the northern end) for a basic 14km 2+2 scheme with no major structures.


  • Registered Users Posts: 2,023 ✭✭✭Donegal Storm


    Nice, haven't been down the N4 in a while and wasn't aware it was so advanced, good progress being made


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Earthworks drone footage from early July.



  • Registered Users Posts: 19,394 ✭✭✭✭road_high


    Delighted to see this death trap go. What standard road will it be? DC standard but same as motorway? Or lesser?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    road_high wrote: »
    Delighted to see this death trap go. What standard road will it be? DC standard but same as motorway? Or lesser?

    Type 2 Dual Carriageway aka 2+2. Two lanes each way with no hard shoulder.


  • Registered Users Posts: 19,394 ✭✭✭✭road_high


    marno21 wrote: »
    Type 2 Dual Carriageway aka 2+2. Two lanes each way with no hard shoulder.

    Pity they didn’t just Motorway it to hell- think the traffic figures are pretty high anyway here


  • Registered Users Posts: 2,023 ✭✭✭Donegal Storm


    The 2+2 section around Roosky is perfectly adequate (apart from annoying roundabouts) and usually half empty, motorway would be nice but even basic 2+2 should future proof it for the foreseeable


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    road_high wrote: »
    Pity they didn’t just Motorway it to hell- think the traffic figures are pretty high anyway here

    AADT at the southern terminus is 7k. 2+2 is absolutely plenty. 2+2 has a capacity of ~20k remember


  • Registered Users Posts: 4,126 ✭✭✭shanec1928


    marno21 wrote: »

    All credit to Roadbridge @ www.n4realignment.ie

    This is scheduled for a Q4 2021 opening. Seems a long way off (even with the required online upgrade at the northern end) for a basic 14km 2+2 scheme with no major structures.
    What are the chances of it been done early. They seem to be making ferocious progress. Still flat out 18.30 tonight.


  • Registered Users Posts: 19,394 ✭✭✭✭road_high


    marno21 wrote: »
    AADT at the southern terminus is 7k. 2+2 is absolutely plenty. 2+2 has a capacity of ~20k remember

    Didnt realise the traffic levels were that low. Assumed it was higher. Love a bit of blue signage where possible!


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    road_high wrote: »
    Didnt realise the traffic levels were that low. Assumed it was higher. Love a bit of blue signage where possible!

    Indeed, there is a sharp drop off south of Castlebaldwin until Carrick where it begins to pick up again towards Dublin.

    Looking like the only chance of motorway grade road on the N4 will be Mullingar-Longford, and that's yet to be finalised.


  • Registered Users Posts: 19,394 ✭✭✭✭road_high


    Motorway definitely needed to beyond Longford and probably Carrick but already some upgrades between Newtown and Carrick done which couldn’t be incorporated


  • Advertisement
  • Registered Users Posts: 4,676 ✭✭✭serfboard


    marno21 wrote: »
    Indeed, there is a sharp drop off south of Castlebaldwin until Carrick where it begins to pick up again towards Dublin.
    Not that much though. The AADT between Carrick and Longford is only 7.7K.


  • Registered Users Posts: 19,394 ✭✭✭✭road_high


    serfboard wrote: »
    Not that much though. The AADT between Carrick and Longford is only 7.7K.

    Any data around Carrick? Data seems a bit spartan around the N4


  • Registered Users Posts: 4,676 ✭✭✭serfboard


    road_high wrote: »
    Any data around Carrick? Data seems a bit spartan around the N4
    Indeed. The only counters that you’ll see on the TII site (https://www.tii.ie/roads-tolling/operations-and-maintenance/traffic-count-data/) are the aforementioned ones just south of Castlebaldwin (7K), and between Carrick and Longford (7.7K), although in fairness, they are probably all that’s needed for long-distance planning on this stretch of the N4.


  • Registered Users Posts: 2,023 ✭✭✭Donegal Storm


    From my own experience on the N4 traffic only really gets noticeably heavy once the N5 merges in Longford, from Colooney to Longford is fairly quiet. There're plenty more pressing schemes that should be prioritised over dualing the rest of Longford - Colooney (Carrick bypass aside)


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    N4 newsletter Q2 2019 (April-August):

    https://www.n4realignment.ie/newsletters/q2-newsletter/


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    N4 earthworks July 2019:

    all_2019_07_22_sligo_progress_0945.jpg

    all_2019_07_22_sligo_progress_1057.jpg

    ch6plus000-look-back-chain-on-cut.jpg

    ch6plus150-look-up-chain-on-cut.jpg

    all_2019_07_22_sligo_progress_1374.jpg

    dji_0039.jpg


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Earthworks August 2019 part 1:

    dscn1833.jpg

    dscn1894.jpg

    dscn2043.jpg

    rock-borrow-pit-ch8plus850-5.jpg

    dscn1840.jpg

    dscn1897.jpg


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Earthworks August 2019 part 2

    dscn2048.jpg

    rock-borrow-pit-ch8plus850-7.jpg

    dscn1892.jpg

    dscn2019.jpg

    dscn2363.jpg


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Earthworks September 2019 part 1

    all_2019_09_29_rb_sligo_1136.jpg

    ch10plus000-10plus200-cl2c-fill.jpg

    ch10plus300-excav-cl2c-from-cut-9-4.jpg

    dscn3281.jpg

    dscn3331.jpg

    all_2019_09_29_rb_sligo_1705.jpg


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,355 Mod ✭✭✭✭marno21


    Earthworks September 2019 part 2

    ch10plus300-excav-cl2c-from-cut-9-1.jpg

    ch10plus300-excav-cl2c-from-cut-9-5.jpg

    dscn3302.jpg

    dscn3422.jpg

    ch10plus000-10plus200-cl2c-fill-2.jpg

    ch10plus300-excav-cl2c-from-cut-9-2.jpg