    AngryLips wrote: »
    All that money spent on resignalling the loop line bridge, wasted

    How do you know it wouldn't be worse without it?


  • Closed Accounts Posts: 4,950 ✭✭✭ChikiChiki


    foggy_lad wrote: »
    You can't buy tickets for trains taking the tunnel yet and leap cards are not working either, you can log on at Newbridge but can't log off at Connolly or any station on the dart line.

    All that should have been tested and boxed off as part of operational readiness. But it wasn't. IR are a shambles tbh.


  • Registered Users Posts: 8,925 ✭✭✭GM228


    AngryLips wrote: »
    All that money spent on resignalling the loop line bridge, wasted

    The CCRP is not actually finished, the bridge was never resignalled as part of the CCRP bar one signal which was moved in readiness for more signals in the next phases.


  • Registered Users Posts: 14,816 ✭✭✭✭loyatemu


    GM228 wrote: »
    The CCRP is not actually finished, the bridge was never resignalled as part of the CCRP bar one signal which was moved in readiness for more signals in the next phases.

    isn't the project supposed to allow 18 tph in each direction? can you imagine what a shambles that will be.


  • Registered Users Posts: 431 ✭✭kc56


    The PPT schedule is dictated by the Heuston side where connections to Portlaoise trains are critical to getting reasonable usage levels from Sallins/Newberidge/Kildare and not interfering with IC schedules. That resulted in the service being shoehorned into the DART/Maynooth schedule resulting some 2 and 1 min intervals. It will probably take the next timetable revision to sort this out properly and provided better synchronisation between Connolly/Heuston sides.


  • Advertisement
  • Registered Users Posts: 5,543 ✭✭✭veryangryman


    Other than money...

    Would there be any reason not to build another loopline bridge/track? Or expand the existing one? Seems like a no brainer business case for it


  • Registered Users Posts: 894 ✭✭✭Bray Head


    Surely it is too early to be passing judgement on usage?

    It takes time for awareness to build and for people to make job and home choices which suit the service.

    I would wait a year or so.


  • Registered Users Posts: 8,779 ✭✭✭Carawaystick


    Other than money...

    Would there be any reason not to build another loopline bridge/track? Or expand the existing one? Seems like a no brainer business case for it
    Other than the money, build an underground line from Heuston, under SSG, Pearse and onto the northern line.
    Have 2 separate dart lines, Bray - Maynooth, and Hazelhatch - Balbriggan


    I wonder if anyone thought of this before...


  • Registered Users Posts: 3,045 ✭✭✭Vic_08


    Other than money...

    Would there be any reason not to build another loopline bridge/track? Or expand the existing one? Seems like a no brainer business case for it

    That was the point of the Dart Underground project.

    There is no way another elevated line would be allowed, even if there was a route available which there isn't.

    The only way to "expand" (I assume you mean quad-track) the current line would be to add a second deck, again no way it would pass planning permission . Not to mention the current structures were never built for that and would most likely need to be demolished and re-built, including Pearse station.

    Completely un-viable... and we are back to DU.


  • Registered Users Posts: 28,998 ✭✭✭✭end of the road


    ChikiChiki wrote: »
    All that should have been tested and boxed off as part of operational readiness. But it wasn't. IR are a shambles tbh.

    absolutely. however, don't forget the NTA in this as well, they should have been insuring this was done also. they deserve as much blame if not more seeing as they are funding this and are the regulator. don't let them get off scot free.
    kc56 wrote: »
    The PPT schedule is dictated by the Heuston side where connections to Portlaoise trains are critical to getting reasonable usage levels from Sallins/Newberidge/Kildare and not interfering with IC schedules. That resulted in the service being shoehorned into the DART/Maynooth schedule resulting some 2 and 1 min intervals. It will probably take the next timetable revision to sort this out properly and provided better synchronisation between Connolly/Heuston sides.

    lets hope so. more people use connolly services then IE'S belovid heuston and them having to suffer constant delays isn't acceptable.

    ticking a box on a form does not make you of a religion.



  • Advertisement
  • Registered Users Posts: 10,679 ✭✭✭✭Jamie2k9


    Get used to the problems, yes one or two may require a full schedule change at both stations but when that happens an extra 2 DARTS will be squashed into the schedule.

    Signalling is all well and good but it just slows things down!


  • Registered Users Posts: 5,201 ✭✭✭ongarboy


    Interestingly, the RTPIs at stations this evening are now saying "delays of up to 15 minutes this evening due to congestion" ! If this is related to the additional PPT services, was this not stress tested as part of the timetable revisions?


  • Registered Users Posts: 17,845 ✭✭✭✭Idbatterim


    does anyone think this current scenario is going to increase pressure on DU to be built?


  • Registered Users Posts: 28,998 ✭✭✭✭end of the road


    Idbatterim wrote: »
    does anyone think this current scenario is going to increase pressure on DU to be built?

    i hope so

    ticking a box on a form does not make you of a religion.



  • Registered Users Posts: 4,573 ✭✭✭Infini


    Truth is you got in addition to the rush hour crowds high demand cos of the run up to christmas, additional train movements and trains running slower due to poor track adhesion as today was a rather damp day.

    If anything the real issue is the infrastructure is really being pushed to its limit expecially at connolly. Imagine if the 10 min Darts were added then it'd be chaos then.

    Realistically DU should have been built FG bottled it badly on this the rail infrastrucure is badly needing new investment and Expansion. Roads cant keep up in Dublin driving during rush hour is a nightmare and public transport is struggling too.


  • Registered Users Posts: 431 ✭✭kc56


    This evening the 1758 GCD-Hazelhatch was running 10 mins late at Drumcondra departing at about 1823 due to the general late running of a lot of DART and other Commuter trains. To keep the connection with the 1825 Heuston-Portlaoise, they held the 1825 around Inchicore allowing the both GCD train also the 1830 Galway to pass. The 1825 run about 5mins late after that.

    At least this shows that IE mean to make the connections work, within reason, and make using the PPT trains viable.


  • Registered Users Posts: 14 Mario Daniel


    The people who make the decisions should experience commuting too.

    That is not happening. If it was, things would be very different I think!

    I doubt that our current minister for Transport (or lack of) has often, or ever, travelled on a real commuter train; ie at peak times. Does he really think that sitting in the Driver's cabin for inauguration will make up for his profound disinterest in really improving Public Transport? He is only interested in cutbacks, not in making significant changes to make Irish Rail or Dublin Transport pay its own way, regardless of whether it should provide an efficient service and how it could be run more professionally.
    Shane Ross is yet to propose a comprehensive plan.


  • Registered Users Posts: 1,943 ✭✭✭tabbey


    I doubt that our current minister for Transport (or lack of) has often, or ever, travelled on a real commuter train; ie at peak times.

    The last minister (or TD), I saw on a regular train, was Ciaran Cuffe, and that was at least six years ago.

    I was never a fan of Shane Ross, for a variety of reasons, for example his praise for Irish Nationwide BS and Michael Fingleton, before the reality was revealed.

    However, since entering government, he has been virtually the only cabinet minister to challenge the status quo.
    Furthermore, he promised Willie Penrose in the Dail, that he would go with him to Killucan, to review the station at first hand, with a view to reopening.


  • Moderators, Category Moderators, Music Moderators, Politics Moderators, Society & Culture Moderators Posts: 22,360 CMod ✭✭✭✭Dravokivich


    tabbey wrote: »
    The last minister (or TD), I saw on a regular train, was Ciaran Cuffe, and that was at least six years ago.

    I was never a fan of Shane Ross, for a variety of reasons, for example his praise for Irish Nationwide BS and Michael Fingleton, before the reality was revealed.

    However, since entering government, he has been virtually the only cabinet minister to challenge the status quo.
    Furthermore, he promised Willie Penrose in the Dail, that he would go with him to Killucan, to review the station at first hand, with a view to reopening.

    There isn't much there to review. Anyone who's ever gone by it on the train can tell them that.


  • Registered Users Posts: 14 Mario Daniel


    tabbey wrote: »
    The last minister (or TD), I saw on a regular train, was Ciaran Cuffe, and that was at least six years ago.

    I was never a fan of Shane Ross, for a variety of reasons, for example his praise for Irish Nationwide BS and Michael Fingleton, before the reality was revealed.

    However, since entering government, he has been virtually the only cabinet minister to challenge the status quo.
    Furthermore, he promised Willie Penrose in the Dail, that he would go with him to Killucan, to review the station at first hand, with a view to reopening.

    A lot of soundbites. He knows how to manipulate the media buzz; easy these days since the government seems to be in hibernating mode. We'll seen whether he actually does something apart from cutbacks proposals. If he were to propose a serious examination of transport policy with the advice of "experts" of all walks of life, including real everyday users, I'd be … happily surprised.


  • Advertisement
  • Registered Users Posts: 8,779 ✭✭✭Carawaystick


    tabbey wrote: »
    The last minister (or TD), I saw on a regular train, was Ciaran Cuffe, and that was at least six years ago.

    I was never a fan of Shane Ross, for a variety of reasons, for example his praise for Irish Nationwide BS and Michael Fingleton, before the reality was revealed.

    However, since entering government, he has been virtually the only cabinet minister to challenge the status quo.
    Furthermore, he promised Willie Penrose in the Dail, that he would go with him to Killucan, to review the station at first hand, with a view to reopening.

    Transport's a doddle

    If IÉ are using congestion as an excuse for thme not being able to run their advertised services as advertised, they're running close to misleading business practices. Which is illegal.


  • Moderators, Motoring & Transport Moderators Posts: 11,593 Mod ✭✭✭✭devnull


    If IÉ are using congestion as an excuse for thme not being able to run their advertised services as advertised, they're running close to misleading business practices. Which is illegal.

    It throws into questions what the City Centre Resignalling project was for as well because it was to avoid these kind of issues with a lot more services than we are seeing running at the moment. There was so much money and time spent on this project and the first time we see a small amount of new services thrown at it, already we are seeing excuses like congestion which makes you wonder what all the money was spent on.

    It also raises questions of how IE were able to plan, open consultations and reply to people saying that none of this would happen and there was more than enough capacity to avoid any congestion and develop and plan these services over so many months that they couldn't see any of this happening.

    Either it was badly planned on the resignalling or service introduction side, the infrastructure cannot cope with a fraction of what it was designed to do, IR are simply incapable of operating the infrastructure or the services properly or they simply don't want to run services now like they didn't want to for years when they said it couldn't be opened.

    Either way it's down to IE at the end of the day. I'd love to say I'm surprised by the issues that have occured since the opening of the PPT but I'm not surprised, this is IE we are talking about and given their track record in general over the past 10 years or so, it's about par for the course with them in my book.

    Much as I'd like to see DU built, the prospect of how IE would deliver a project of that size is scary.


  • Registered Users Posts: 28,998 ✭✭✭✭end of the road


    a
    devnull wrote: »
    It throws into questions what the City Centre Resignalling project was for as well because it was to avoid these kind of issues with a lot more services than we are seeing running at the moment. There was so much money and time spent on this project and the first time we see a small amount of new services thrown at it, already we are seeing excuses like congestion which makes you wonder what all the money was spent on.

    It also raises questions of how IE were able to plan, open consultations and reply to people saying that none of this would happen and there was more than enough capacity to avoid any congestion and develop and plan these services over so many months that they couldn't see any of this happening.

    Either it was badly planned on the resignalling or service introduction side, the infrastructure cannot cope with a fraction of what it was designed to do, IR are simply incapable of operating the infrastructure or the services properly or they simply don't want to run services now like they didn't want to for years when they said it couldn't be opened.

    Either way it's down to IE at the end of the day. I'd love to say I'm surprised by the issues that have occured since the opening of the PPT but I'm not surprised, this is IE we are talking about and given their track record in general over the past 10 years or so, it's about par for the course with them in my book.

    Much as I'd like to see DU built, the prospect of how IE would deliver a project of that size is scary.

    no scarier then anyone else tbh. we in ireland don't do things properly full stop. even if no services were publically operated/owned chances are they're would be lax regulation and no overseeing.

    ticking a box on a form does not make you of a religion.



  • Registered Users Posts: 3,045 ✭✭✭Vic_08


    devnull wrote: »
    It throws into questions what the City Centre Resignalling project was for as well because it was to avoid these kind of issues with a lot more services than we are seeing running at the moment. There was so much money and time spent on this project and the first time we see a small amount of new services thrown at it, already we are seeing excuses like congestion which makes you wonder what all the money was spent on..
    GM228 wrote: »
    The CCRP is not actually finished, the bridge was never resignalled as part of the CCRP bar one signal which was moved in readiness for more signals in the next phases.

    .


  • Registered Users Posts: 152 ✭✭derekbro


    GM228 wrote: »
    The CCRP is not actually finished, the bridge was never resignalled as part of the CCRP bar one signal which was moved in readiness for more signals in the next phases.

    Was the 10 minute dart not due to start last April, surely the CCRP needed to be finished before that was to start?


  • Registered Users Posts: 4,573 ✭✭✭Infini


    derekbro wrote: »
    Was the 10 minute dart not due to start last April, surely the CCRP needed to be finished before that was to start?

    Think its only on the south side its done. They still havent done the north side between killester and connolly (hint: the signals north of connolly are mostly the old stock not new ones).

    As for the 10 min service my opinion is its a red herring atm the infrastructure is struggling with just those hazelhatch services being added. Whats needed is triple or quad tracking of connolly to howth jct or clongriffin, removal or permenant closure of the 5 level crossings between lansdowne and booterstown and even building DU which IMO was a collossal screwup by FG.


  • Registered Users Posts: 8,925 ✭✭✭GM228


    derekbro wrote: »
    Was the 10 minute dart not due to start last April, surely the CCRP needed to be finished before that was to start?

    The last phase of the CCRP (3 of 4) was only commissioned 4 months ago nearly a year after the 10 minute DART servive was originally due to start. The CCRP won't be finished until some time in 2018.


  • Registered Users Posts: 8,925 ✭✭✭GM228


    Infini2 wrote: »
    Think its only on the south side its done. They still havent done the north side between killester and connolly (hint: the signals north of connolly are mostly the old stock not new ones).

    Sandymount to Malahide and Howth is the scope of the CCRP, all is done except Connolly to Killester.


  • Closed Accounts Posts: 21,730 ✭✭✭✭Fred Swanson


    This post has been deleted.


  • Advertisement
  • Closed Accounts Posts: 2,511 ✭✭✭Heisenberg1


    There has been 4 extra signals put in between Connolly and Pearse and axle counters with the last phase of the CCRP. The current infrastructure can cope with the extra services but at the moment with low rail adhesion it's causing havoc with the timetable.