Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Road Construction Projects - Start & End Dates

1356

Comments

  • Registered Users Posts: 135 ✭✭ForiegnNational


    clon wrote: »
    Tunnel to open next Tuesday by Cowen 27th July.link to report in Limerick Leader.

    http://www.limerickleader.ie/news/660m-Limerick-Tunnel-to-be.6428549.jp

    Just keeping the thread up to date... Thanks Clon


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    From the article

    "removal of up to 20,000 cars daily" :rolleyes:

    Bull with a capital B. What a terrible estimate


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    I guess Cowen will be arriving by caravan. :D


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    The NRA tweeted today that it will be Monday 26th instead.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    spacetweek wrote: »
    The NRA tweeted today that it will be Monday 26th instead.
    Back to Tuesday 27th!


    Flip, flop, flip, flop!


  • Registered Users, Registered Users 2 Posts: 488 ✭✭fresca


    Shannon Tunnel (Limerick Southern Ring Road Phase 2) opens today after lunch...

    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th

    confirmed Openings...
    M9 Carlow-Knocktopher - Sep

    estimated openings...
    M18 Gort-Crusheen - Sept (???)
    N21 Castleisland - Oct (???)
    M50 Upgrade (J5) - Sept/Oct (???)
    M50 Upgrade (J6)- Sept/Oct (???)
    M7 Castletown-Nenagh - Oct (???)
    M7 Birdhill-Limerick - Unknown (???)

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010 (???)
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)


  • Registered Users Posts: 260 ✭✭Poster King


    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th (not June)

    What about Galway Outer Bypass? Is this project too "up-in-the-air" to include in this list?
    Was there any mention of it in yesterday's Infrastructure announcement?


  • Registered Users, Registered Users 2 Posts: 5,556 ✭✭✭swoofer


    did it not say elsewhere. tunnel opens at 6pm today!!!

    gb--


  • Registered Users, Registered Users 2 Posts: 2,457 ✭✭✭dmeehan


    They have started fencing off the areas CPO'd for the N22 Tralee Bypass yesterday


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th (not June)

    What about Galway Outer Bypass? Is this project too "up-in-the-air" to include in this list?
    Was there any mention of it in yesterday's Infrastructure announcement?

    Galway bypass is suspended, despite what Frank Fahey may lead you to believe. Even if it wasnt, it'll be years before it clears the courts.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 728 ✭✭✭robert muldoon


    Any news yet of definite opening date?


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    dmeehan wrote: »
    They have started fencing off the areas CPO'd for the N22 Tralee Bypass yesterday

    I wish you luck. They completed the CPO and fenced off the line of the N11 Rathnew-Arklow in 2004. Still nothing happening! :cool:


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    They also demolished all the CPOed houses, etc there - bit further than just a fence!


  • Registered Users Posts: 36 neadycodd


    Any news yet of definite opening date?

    Signs of new activity at Powerstown end, new pile of plastic bollards and traffic cones, and a flashing sign warning of major changes to junction from Monday 16th August - must be soon now!


  • Registered Users Posts: 35 b2dadizzle


    It's on the front page of the Kilkenny People that the final stretch of motorway is due to open on the 9th September, almost €20 million under budget.


  • Closed Accounts Posts: 3,808 ✭✭✭Chris P. Bacon


    Well according to RTE the M9 is opening this day 3 weeks http://www.rte.ie/news/2010/0818/m9.html


  • Closed Accounts Posts: 2 mbtshoes


    The same to me.I also think that i should check out Cullahill-Portlaoise to see how that's going. I'd reckon for that, still late 2010, but I haven't been up near the site in a while.


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    mbtshoes wrote: »
    The same to me.I also think that i should check out Cullahill-Portlaoise to see how that's going. I'd reckon for that, still late 2010, but I haven't been up near the site in a while.

    That opened last May.


  • Closed Accounts Posts: 5,234 ✭✭✭thetonynator


    Cant wait for the danesfort - powerstown section of the m9 to open!!!! Dublin in an hour from home!!! :D

    September 9th cant come quick enough . . .


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,216 ✭✭✭cargo


    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th
    M50 Upgrade - Sept 1st

    confirmed Openings...
    M9 Carlow-Knocktopher - Sep 9th

    estimated openings...
    M18 Gort-Crusheen - Sept (???)
    M7 Birdhill-Limerick - Sep/Oct (???)
    N21 Castleisland - Oct (???)
    M7 Castletown-Nenagh - Nov (???)

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010 (???)
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)[/QUOTE]


  • Registered Users, Registered Users 2 Posts: 721 ✭✭✭mk6705


    dmeehan wrote: »
    They have started fencing off the areas CPO'd for the N22 Tralee Bypass yesterday

    There seems to be some archaeological signs up aswell, whether that's happening or not.


  • Registered Users Posts: 26 jacksyhoulahan


    M7 Birdhill-Limerick - September 10th
    Castletown - Nenagh Supposed to be late November


  • Closed Accounts Posts: 3,010 ✭✭✭Tech3


    M7 Birdhill-Limerick - September 10th

    Interesting...... Source?


  • Registered Users, Registered Users 2 Posts: 488 ✭✭fresca


    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th
    M50 Upgrade - Sept 1st
    M9 Carlow-Knocktopher - Sep 9th

    confirmed Openings...
    ...

    estimated openings...
    M18 Gort-Crusheen - Sep (???)
    M7 Birdhill-Limerick - Sep/Oct (???)
    N21 Castleisland - Nov 1 (latest on radio kerry)
    M7 Castletown-Nenagh - Nov (???)

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010 (???)
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)
    Tralee Ring Roads Project - 2011


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    Estimated Openings...
    M18 Gort-Crusheen: October
    M7 Birdhill-Limerick: Late September
    N21 Castleisland: Nov 1 (latest on radio kerry)
    M7 Castletown-Nenagh: Early December
    M17/M18 Gort-Tuam: mid-2013


    Estimated Starts...
    M11 Rathnew/Arklow + Newland's Cross: Early 2011
    M17/18 Gort-Tuam: December 2010/January 2011
    N25 Cork South Ring Flyovers: 2011 (?)


  • Advertisement
  • Registered Users Posts: 26 mcgeebers


    What other road starts, other than the 3 listed here, have been confirmed as starting next year, or is that it given the current funding constraints?


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    Not even those 3 have been confirmed as yet, only the M17/M18 PPP is a cert. Can't see the M11/NX one not going ahead, though.

    Other than those, the N22 Tralee BP, the N5 Longford BP and N3 Belturbet BP are the others that have gone to tender that I can remember, and there are some fairly extensive works on the N70 and N59 being done by their respective councils IIRC (not NRA schemes).


  • Registered Users Posts: 227 ✭✭/V\etalfish


    M7 Birhill to Limerick should be opening on the 28th.

    Link


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    MYOB wrote: »
    there are some fairly extensive works on the N70 and N59 being done by their respective councils IIRC (not NRA schemes).
    Interesting - any more details on those?


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    The Murphystown Parallel Road in Sandyford is under construction and due for completion in the spring (2011). It links the M50 (junction 14) to the Ballyogan Road (northern end).

    I suppose that doesn't count? :rolleyes:


  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Wild Bill wrote: »
    The Murphystown Parallel Road in Sandyford is under construction and due for completion in the spring (2011). It links the M50 (junction 14) to the Ballyogan Road (northern end).

    I suppose that doesn't count? :rolleyes:
    Oh that one, yea - that's part of the Luas project.


  • Registered Users, Registered Users 2 Posts: 21,034 ✭✭✭✭Stark


    Do we have to add every minor local road scheme in the country?


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    Stark wrote: »
    Do we have to add every minor local road scheme in the country?

    I'd prefer if we kept it to N roads and motorways.


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    Stark wrote: »
    Do we have to add every minor local road scheme in the country?

    Eh....no. Just the important ones. :)


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    spacetweek wrote: »
    Interesting - any more details on those?

    http://www.boards.ie/vbulletin/showthread.php?p=66761508 as per Sponge Bob there.


  • Registered Users Posts: 91 ✭✭clon


    Schedule Updates
    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th
    M50 Upgrade - Sept 1st
    M9 Carlow-Knocktopher - Sep 9th
    M7 Birdhill-Limerick - Sept 28th
    confirmed Openings...
    ...

    estimated openings...
    M18 Gort-Crusheen - Nov.
    N21 Castleisland - Nov 1 (latest on radio kerry)
    M7 Castletown-Nenagh - Nov

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010/Jan 2011
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)
    Tralee Ring Roads Project - 2011


  • Registered Users Posts: 15 CDuVe


    Hi, am I correct to say that the above estimation for the opening of the M18 Gort to Crusheen is November 2010?? What is the source for this info? Thanks!!


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    CDuVe wrote: »
    Hi, am I correct to say that the above estimation for the opening of the M18 Gort to Crusheen is November 2010?? What is the source for this info? Thanks!!

    Correct... we have multiple sources, check out the thread here.


  • Closed Accounts Posts: 3,010 ✭✭✭Tech3


    CDuVe wrote: »
    Hi, am I correct to say that the above estimation for the opening of the M18 Gort to Crusheen is November 2010?? What is the source for this info? Thanks!!

    Friday 12th November is the date this will open.


  • Registered Users, Registered Users 2 Posts: 488 ✭✭fresca


    Schedule Updates
    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th
    M50 Upgrade - Sept 1st
    M9 Carlow-Knocktopher - Sep 9th
    M7 Birdhill-Limerick - Sept 28th

    confirmed Openings...

    N21 Castleisland - Oct 22
    M18 Gort-Crusheen - Nov 12

    estimated openings...
    M7 Castletown-Nenagh - Nov

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010/Jan 2011
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)
    Tralee Ring Roads Project - 2011


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 488 ✭✭fresca


    Schedule Updates
    now open...
    M50/M1 - Jan 16th
    M50/J14 - Feb 8th
    M9 Waterford-Danesfort - Mar 22nd
    N78 Athy Link Road - Mar 30
    M7 Nenagh-Birdhill - April 1st
    M7/M8 Portlaoise/Cullahill/Castletown - May 28th
    M3 Clonee-Kells - June 4th
    N7/N18 Shannon Tunnel (LSRR-Phase 2) - July 27th
    M50 Upgrade - Sept 1st
    M9 Carlow-Knocktopher - Sep 9th
    M7 Birdhill-Limerick - Sept 28th
    N21 Castleisland - Oct 22

    confirmed Openings...
    M18 Gort-Crusheen - Nov 12

    estimated openings...
    M7 Castletown-Nenagh - Nov

    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010/Jan 2011
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)
    Tralee Ring Roads Project - 2011


  • Closed Accounts Posts: 1,735 ✭✭✭Irish and Proud


    ...also, M1 Widening (J2-J3) estimated start for Oct 2010.

    If the above comes through, it will mean that a gap in Irish motorway construction may be avoided.

    :)


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    Based on the 5 mile tailback southbound on the M50/M11 I saw this afternoon I'd reckon widening the road from Sandyford (J14) to Bray (South) on the N11 must be a priority.

    (Of course I know that some folk reckon traffic levels aren't a consideration in these matters :))


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Wild Bill wrote: »
    Based on the 5 mile tailback southbound on the M50/M11 I saw this afternoon I'd reckon widening the road from Sandyford (J14) to Bray (South) on the N11 must be a priority.

    (Of course I know that some folk reckon traffic levels aren't a consideration in these matters :))
    Are you serious? I've never seen more than a handful of cars on that stretch.


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    spacetweek wrote: »
    Are you serious? I've never seen more than a handful of cars on that stretch.

    Who isn't being serious?! 80,000 movements/day (or whatever) and you've every only seen a handful?! I travel during the hours from 7am to 8pm; maybe you are on the 4am shift? :D

    The tailbacks in the afternoon from the Bray junctions are notorious; ditto the tailbacks southwards from Kilmac in the mornings. :cool:


  • Registered Users Posts: 260 ✭✭Poster King


    Wild Bill wrote: »
    Based on the 5 mile tailback southbound on the M50/M11 I saw this afternoon I'd reckon widening the road from Sandyford (J14) to Bray (South) on the N11 must be a priority.

    (Of course I know that some folk reckon traffic levels aren't a consideration in these matters :))

    There were two accidents on that route on that Friday afternoon. There was on the northbound carriageway neat Firhouse junction of M50 that caused major tailbacks, thanks to radio reports I avoided it, but my cousin got delayed for two hours. There was a 2nd accident at the same time near Kilmacanogue heading south that caused major tailbacks as far as Cherrywood.


  • Banned (with Prison Access) Posts: 3,129 ✭✭✭Wild Bill


    There were two accidents on that route on that Friday afternoon.

    Yet another one at Kilmac? Hardly (if ever) does a week pass without a serious accident through that junction.

    It is like the "Four Nuns" junction at Herbert Road used to be before they closed the median. But 21 people were killed at that single spot (never mind the injured and maimed) before they finally did anything - back in the early 1990s.

    Then they built a new version two miles south at Kilmac.

    It is bordering on criminal to leave it like it is. At the very least they could move the ****ing bus terminus. :mad:


  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    fresca wrote: »
    estimated starts...
    M11 Rathnew/Arklow (2011?)
    + Newland's Cross (2011?)
    M17/18 Gort-Tuam - Dec 2010/Jan 2011
    M20 Cork-Limerick southern section (???)
    N25 Cork South Ring Flyovers (???)
    N22 Tralee Bypass (???)
    Tralee Ring Roads Project - 2011
    you can add the N3 Belturbet By Pass to that - est. start Mar 2011

    source Cavan County Council Chairman Cllr. Seamus Fitzpatrick from: http://www.anglocelt.ie/news/roundup/articles/2010/10/27/4001075-gannons-cross-junction-realigned-and-made-safer/print

    There's that many millions already spent on land purchase and planning that it is more cost effective to plough on with projects like this than to comtemplate abandonment/ postponment.


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    We can probably expect a confirmed start on the Tralee Bypass shortly, as Healey-Rae has it second on his shopping list to support the budget, he was saying it on the radio today - repeatedly!


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    MYOB wrote: »
    We can probably expect a confirmed start on the Tralee Bypass shortly, as Healey-Rae has it second on his shopping list to support the budget, he was saying it on the radio today - repeatedly!
    yup
    http://breakingnews.ie/ireland/healy-rae-demands-hospital-and-bypass-for-supporting-budget-480421.html

    according to an irish examiner article, land has already been acquired for this project.
    The 100 million plus price tag is probably a good percentage land cost, so its not that much a financial burden from where we stand now to plough on and get the project over and done with.

    as for a new Hospital...... That'd be off topic to comment :rolleyes: