Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

N8/N25/N40 - Dunkettle Interchange [open to traffic]

18284868788

Comments

  • Registered Users, Registered Users 2 Posts: 4,224 ✭✭✭chooseusername


    What about Sat-Navs? last time I was through there it was both lanes for M8.

    Maybe someone going North through tunnel would ask sat-nav for Fermoy and see what it says now.

    Not everyone going through there is familiar with the layout, and it's easy to assume the N40 to M8 is a 2 lane through road with the N25 as an exit from the left lane.



  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion


    roadconstruction@ccc-site.com



  • Registered Users, Registered Users 2 Posts: 4,591 ✭✭✭AugustusMinimus


    Google maps states that any lane can be used to access the M8 slip. Crazy stuff.



  • Registered Users, Registered Users 2 Posts: 2,290 ✭✭✭KrisW1001


    Yeah, but Google Maps has always been pretty crap as a navigation app. It's usually the last to get updated any time a road opens.

    If the signage was correct, this would be okay, but it's not, so it makes the problem worse.

    The most important instruction is "Use right lane for Dublin". I think a two panel "All other routes | Dublin" gantry would be the clearest and safest option. Everyone else has a chance to move lanes, but Dublin traffic is kind of screwed if it emerges from the tunnel in the left lane.



  • Registered Users, Registered Users 2 Posts: 712 ✭✭✭cork_south


    Another crash at Bloomfield yesterday.

    I wonder are these planned works for the M28 or for possible improvements at Bloomfield.

    Surveying Works # Location: - N28/N40 Bloomfield Interchange / Dates: - Sunday 14/04/2024 for 1 Week (Night-time Works) / Note: - Traffic Management in effect



  • Registered Users, Registered Users 2 Posts: 6,115 ✭✭✭Chris_5339762


    Its just pure bad driving there thesedays. People forcing the merge, people tailgating in the overtaking lane. Result: crashes.



  • Registered Users, Registered Users 2 Posts: 712 ✭✭✭cork_south


    And people merging from multiple different merge points.

    As discussed already here forcing mergers to merge correctly at the end of the merging lane would help avoid a lot of the tailbacks to the tunnel, and of course help avoid a lot of these crashes.

    Hopefully something is done soon.



  • Registered Users, Registered Users 2 Posts: 2,066 ✭✭✭niloc1951


    How the merge atvRathcoole on the N7 is done, it ain't rocket science

    N7

    https://maps.app.goo.gl/pbNuXhERCkNCtLNw8



  • Registered Users, Registered Users 2 Posts: 4,224 ✭✭✭chooseusername


    How does that particular merge force mergers to merge correctly? Sorry I'm not a rocket scientist.



  • Registered Users, Registered Users 2 Posts: 2,278 ✭✭✭Fabio


    I think it might help by forcing people to continue on the merge lane due to the barrier separating the lanes. There's still a long merge opportunity without the barrier. I'm not sure there's the same amount of room at the Bloomfield Interchange but it might help.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 6,115 ✭✭✭Chris_5339762


    They did have merge barriers of some sort at Bloomfield several years ago, but each and every one was crashed into.



  • Registered Users, Registered Users 2 Posts: 2,066 ✭✭✭niloc1951


    The issue at Bloomfield is there are 2 lanes from the N28 running parallel to and unseperated from the N40 with chaotic merging onto the N40 from both.

    The 2 N28 lanes should be merged into one while separated from the N40 by a barrier, like on the N7 near Rathcoole. It is only after the emerging of the two N28 lanes should the resulting single lane be able to merge with the N40.

    Only having one lane merging, a la N7, should reduce the present chaos which is resulting in the current high rate of crashes in the area.



  • Registered Users, Registered Users 2 Posts: 4,224 ✭✭✭chooseusername


    Yes, I wasn't expecting this at the end of the slip road.

    This sign doesn't help the situation either

    There's plenty room to divide the lanes on the slip road with bollards and merge each lane onto the N40, 200 or 300 mtrs apart.

    That N7 slip road is a poor comparison, it's one lane only from the roundabout, and the bollards are probably more to do with the construction business and two private houses entering and exiting the slip road



  • Registered Users, Registered Users 2 Posts: 2,066 ✭✭✭niloc1951


    Two separate merging lanes a couple of hundred metres apart is still one too many, considering the volume of traffic on the N40. Is it not better to merge the two on the N28 into one and have just one merge onto the N40.

    I do know it’s only one lane the whole way from the roundabout at Rathcoole, I was only mentioning that location as an example to demonstrate how it is done in a better way than simply plastic bollards which don't survive for long.



  • Registered Users, Registered Users 2 Posts: 6,115 ✭✭✭Chris_5339762


    This is what used to happen at Bloomfield - and indeed the markings on the road said so. Trouble is, all of the barriers were demolished by cars.

    There should be no mad merging from two lanes here at all, but the trouble is, the 2-1 merge on the sliproad happens on a bend, so you get an optical illusion of the lane ending. What should happen is no merging until after the bend when the mainline is straight.



  • Registered Users, Registered Users 2 Posts: 712 ✭✭✭cork_south




  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion




  • Registered Users, Registered Users 2 Posts: 4,224 ✭✭✭chooseusername


    Back in 2007 I'd say it got a bit interesting.

    There is a school of thought that says to make roads safe, make them feel dangerous. Maybe they were ahead of their time back in 2007!

    https://www.theatlantic.com/health/archive/2015/02/to-make-roads-safe-make-them-feel-dangerous/386336/



  • Registered Users, Registered Users 2 Posts: 712 ✭✭✭cork_south


    Another crash at Bloomfield this morning.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion




  • Registered Users, Registered Users 2 Posts: 6,115 ✭✭✭Chris_5339762


    Not Bloomfield this morning…. four cars (one a taxi and one ironically a motorway service vehicle) had the usual tailgating pileup when the first one started to brake suddenly.

    But it was where the second westbound Douglas onramp meets the N40, so not the usual spot at all.

    There was nearly a second identical crash along the N25 this morning as tailgating cars all braked due to a lorry pulling out to overtake a tractor. Much skidding.

    The more I see of these accidents its tailgating. Nothing more than that.Tailgating, aggression, silly merging causing tailgating cars to brake.



  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion


    Traffic on the N28 on ramp at Maryborough Hill, coming up and down the hill, which I have never seen/haven’t seen in a long time. A big problem was the second people got to the end of the ramp and onto the merge lane, they were trying to merge. No one (except me) would go to the end of the lane and seamlessly merge in. It led to a standstill as cars were braking trying to squeeze in at the start of the lane. As discussed, same happens at the merge of N28 (specifically the right hand lane) and N40. Everytime I go to the end of the lane and I get in easily without having to stop



  • Registered Users, Registered Users 2 Posts: 6,115 ✭✭✭Chris_5339762


    The only trouble with the latter (and its common at Mahon eastbound in particular) is that people come to the end of the merge and just barge in, without let nor care as to who might be in the way.



  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion


    Oh definitely, I should have made it clear I still do it safely, and yield to traffic on the mainline. I always dread driving past the J10 on ramp eastbound, same with the N27 at its junction with Mick Barry Road



  • Registered Users, Registered Users 2 Posts: 1,504 ✭✭✭chalkitdown1


    Had my first experience coming from Carrigtwohill towards the tunnel yesterday. Thank god I mostly work from home, is all I can say. It's probably been discussed to death here, but those 3 lanes merging into 1 right before the tunnel is a certifiable nightmare. Spent 20 minutes alone there on a 100m stretch and then the rest of the trip was fine.

    The worst part is there's probably no way to avoid it apart from widening the tunnel, which obviously isn't gonna happen.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 155 ✭✭Corkladddd!!


    Not sure what time you were at but there was an accident between Mahon and Bloomfield after 6 that slowed everything down, wonder is the mile or so between Mahon / Bloomfield / Douglas Flyover statistically the most accident prone area in the country? Certainly feels like it!



  • Registered Users, Registered Users 2 Posts: 1,504 ✭✭✭chalkitdown1


    It was about 5.15.

    As far as I could tell, it was just the 3 lanes merging that was causing the delay. As soon as I got past that and it was single-file closer to the tunnel, traffic was completely free-flowing. Only a handful of cars up the Mahon off-ramp etc.



  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion


    Did anyone email the Road Construction team about the signage in the scheme? And if so, did anyone get a response?



  • Registered Users, Registered Users 2 Posts: 2,001 ✭✭✭cantalach


    No. Main reason is that I'm waiting until I have a photo of all of the bad signage, and I haven't had a chance yet to photograph the signs on the N25W. But I will!



  • Registered Users, Registered Users 2 Posts: 2,066 ✭✭✭niloc1951


    I've just spent a few minutes watching the N40 North of Tunnel camera feed.

    As could be expected, at 9.15pm on a Saturday evening quite a bit of the traffic is heading for the M8. During the few minutes watching I counted six cars making the last minute dive from lane 1 across lane 2, to get to the M8.

    While us locals have sussed that only lane 2 facilitates safe access to the M8 the sh1te direction signs seem to be definitely catching out the visitors.

    Post edited by niloc1951 on


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 690 ✭✭✭DylanQuestion


    What do they actually do in the tunnel when it’s closed? I feel it has been closed almost every weeknight for ages



  • Registered Users, Registered Users 2 Posts: 6,566 ✭✭✭kub


    If you drive through the tunnel on any dry day, watch out for damp patches at the deepest part of it.

    It is water ingress and they are trying to keep treating it, as timeis going by it is becoming more intense.

    There is a long term plan to replace the tunnel with a bridge.



  • Registered Users, Registered Users 2 Posts: 18,385 ✭✭✭✭namloc1980




  • Registered Users, Registered Users 2 Posts: 6,566 ✭✭✭kub




  • Registered Users, Registered Users 2 Posts: 18,385 ✭✭✭✭namloc1980


    Wouldn't believe a word of it. It's not mentioned in any plan anywhere that I know of, and we've just spent €200m+ on a new interchange there that is designed around the tunnel and is not compatible with a bridge.



  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    Only new bridge planned is the Tivoli to Marina one. "Gateway Bridge".

    Tunnel is staying.

    Hopefully the council see sense and make the gateway bridge sustainable transport only, but right now it's footpath, bike, bus, general traffic on each side, and that wide street configuration continues down centre park road.



  • Registered Users, Registered Users 2 Posts: 6,566 ✭✭✭kub


    You must not have seen the words " long term plan "



  • Registered Users, Registered Users 2 Posts: 18,385 ✭✭✭✭namloc1980


    I did and I asked where is this plan? I've never seen it in any strategic plans. CMATS makes no mention of it. Where is it mentioned?



  • Registered Users, Registered Users 2 Posts: 18,385 ✭✭✭✭namloc1980


    A public transport and pedestrian bridge is supposed to form part of the Luas across from Kent station to the south docks but I'd say there's more chance of pigs flying than those projects going ahead any time in the next few decades.



  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    Crossed wires, I'm talking about further downstream. From approx. Tivoli skew bridge directly to Center Park road, at around a 45 degree angle to the river. The one you're describing there hasn't been considered for car traffic thankfully.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    The Luas bridge will probably remain dead or dormant for a long time, as the councillors apparently kept asking the NTA and Luas teams to factor cars in the Luas plans, and the NTA and Luas teams did the sensible thing and walked away from the Cork Luas project.

    That leaves the Eastern Gateway Bridge, which the Council is adamant that they are progressing and the Bus Connects teams are factoring it into their route designs. HOWEVER, word has it that a new part 8 is landing at Tivoli skew bridge in the next week or so…which may or may not reference the Eastern Gateway Bridge - we will see!

    Frankly, I hope the Eastern Gateway Bridge is delayed as long as possible, until the Council has the right political environment to make it sustainable transport only. As someone who generally approaches the city from the East, I can tell you I'd drive that bridge almost every time to get into the city faster, and with all bus routes now through the train station (great!), it'd primarily facilitate unsustainable getting right into the city centre. Frankly I'd rather no bridge rather than what they're proposing (that's speaking as someone who would benefit from it!). What they need is sustainable downstream crossings: another car bridge in/at the city seems like a retrograde step: we don't particularly want cars in the city centre, so why would we go to such lengths to facilitate them? Let them use the tunnel or one of the other bridges - it'll be no slower than public transport!



  • Registered Users, Registered Users 2 Posts: 2,066 ✭✭✭niloc1951


    Wherever they put the downstream bridge I hope it is built in a way to facilitate leisure traffic on the river to reach the city.

    Berthing facilities in the city for boutique cruise ships, yachts and othertypes of boating activity would greatly enhance attractiveness of the public realm environment of the redeveloped old port.



  • Registered Users, Registered Users 2 Posts: 6,566 ✭✭✭kub


    It is a shame that one cannot even mention something said in a conversation now without links to it online.

    Neverlone being ridiculed for it.

    I have no doubt the tunnel like most infrastructures as it, has an expected life span

    A poster mentioned earlier the tunnel appears to be closing more often, I have to apologise to you all, you have become so annoyed by my sheer arrogance to mention something I was told during a conversation by someone in the know.



  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    What you've mentioned is fairly significant and flies in the face of all long-term strategies and publications so that makes it extremely interesting to people reading. I don't think you're being ridiculed, rather you're being quizzed for detail because it's so significant!



  • Registered Users, Registered Users 2 Posts: 2,290 ✭✭✭KrisW1001


    "Extraordinary claims require extraordinary evidence"



  • Moderators, Sports Moderators Posts: 12,715 Mod ✭✭✭✭Cookiemunster


    Yes infrastructure has a lifespan. It's usually around a century. The JLT has been open 25 years. It may be over capacity, but it's nowhere near end of life.



  • Registered Users, Registered Users 2 Posts: 9,493 ✭✭✭Shedite27


    I think it depends what you mena by "city centre". To me that means keeping cars out of the central island, and this bridge would do that. People travelling from Mayfield to Turners Cross for example, this takes cars around the central island and city hall area.



  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    It's possible we're at cross-purposes. You're perhaps thinking about the current city centre environment but in the long term Centre Park road is planned to be heavily residential and offices and the plan is to put a tram through the middle of it. It is planned for Centre Park Road to be very much city centre. That's what the new bridge is intended to facilitate.

    So plugging a new arterial road through that environment could be bad:

    1. It would make the residential neighbourhood itself less desirable (noise, pollution, views, etc)
    2. It would make walking and cycling less attractive
    3. It would undermine the new tram system

    The car traffic should be able to access the city, but crossing the city the way you describe should ideally be the job of either sustainable transport or the arterial road network (which isn't yet fully finished, of course!). Mayfield cars can access Turner's cross via N8/N40/N27 rather than crossing the city. It's currently faster that "external" arterial way, so why would we put in a new bridge, changing that, improving the exact drive we're trying to discourage?

    I'm in favour of a bridge, just don't think allowing cars on it will work out well. And I'm reasonably confident that people won't YET accept a new bridge without cars.

    But basically if we're serious about putting in high density residential and offices at Centre Park road, then that's not very compatible with putting an arterial road through there. I understand why it's being proposed (a dual carriageway into the city centre is what we've always done since the 60's) but it's not a good step for the future. Flood the area with foot, bike, bus, tram, infrastructure instead. And hopefully get the results we keep saying we aspire to.



  • Registered Users, Registered Users 2 Posts: 9,493 ✭✭✭Shedite27


    Sounds fantastic but not sure how practical it is in a low density city. You'd need every apartment and office to be developed without car parking to not require car access to the area. I'd love to see it, but can't see it happening, and without new access roads it's just going to flood the current access roads



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 3,462 ✭✭✭hans aus dtschl


    The whole general plan for that area is high density. I'm not sure how many times I'm going to need to write that: they're hoping for a population of >25k and >20k jobs in the area. The main words they keep using in relation to it are "sustainable" and "urban centre".

    Also, I fully agree that the city has not got a high enough density now, that is something that all of the people planning aspire to change.

    I think you're basically proving my point that any new Eastern Gateway Bridge will be inundated with people wanting it to allow car access if they do it in the near future. What an Eastern Gateway Bridge is absolutely NOT intended to facilitate will be cross-city car journeys, but these would be the primary "winners" if it were built.



Advertisement