Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Energy infrastructure

18283858788112

Comments

  • Registered Users Posts: 3,847 ✭✭✭roadmaster




  • Registered Users, Registered Users 2 Posts: 975 ✭✭✭medoc


    Its fate was sealed when it didn’t get planning permission to burn biomass. There is no peat to burn. It’s only a matter of time now as to when it’s demolished and what’s done with the site afterwards. ESB have plans for batteries on site. Lumcloon Energ already have a battery installation on site and have plans in process for a Synchronous Condenser and additional battery installation. The 60 years of electricity generation on site are at an end.



  • Posts: 0 [Deleted User]


    A good review of the state of cardon dioxide removal tech for those interested in the topic




  • Registered Users, Registered Users 2 Posts: 975 ✭✭✭medoc



    Go ahead given for the demolition of West Offaly Powerstation in Shannonbridge.


    https://www.offalyindependent.ie/2023/01/19/decision-on-power-station-demolition-announced/



  • Posts: 0 [Deleted User]


    2 new gas power plants will be "hydrogen ready", whatever that means




  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,720 ✭✭✭serfboard


    Probably no harm to have a few more peakers given the threat to the supply, caused in part by giving planning permission to data centres and then realising that they use a lot of power.

    If the plants are ready by end '24 (start '25) then if they're necessary for five years that takes us up to 2030, by which time the renewable supply will hopefully meet the vast majority, or all of our needs.

    Where they're going to get the gas from though, is another issue ...



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    "Where they're going to get the gas from though, is another issue ..."

    The issues with Russian gas seem to be well on the way to being resolved. A few days ago the price of gas in Europe hit it's lowest in 16 months, so normalized back to the price well before the war (but still relatively high compared to the past 5 years).

    Gas storage levels in Europe are at record high levels, almost still 90% full despite being half way through Winter!

    Flows of LNG heading to Europe look be extremely healthy. LNG export facilities have expanded and Germany already opened it's first LNG import facility, the next 3 are well on the way for opening this year, the Dutch greatly increased their LNG import capacity and Norway greatly increased their piped gas exports.

    Also new gas fields being discovered and developed near Cyprus, Egypt and Norway/North Sea.

    Basically the market has done a remarkable job in quickly reconfiguring itself. Still a bit expensive, but doesn't look like there any issues with supply.



  • Registered Users, Registered Users 2 Posts: 3,802 ✭✭✭Apogee


    The 1.3GW Emerald Offshore Project off Kinsale, from which Shell previously withdrew, is progressing to public consulation:

    Apart from the Bord Gáis plants mentioned earlier in thread, the only other notable recent infrastructure news was a planning application for a 293MW gas powerplant in Limerick




  • Posts: 0 [Deleted User]


    I expect to see more on the other 6 offshore wind farms going out for consultation soon

    They all seem to be moving through the application/development process at a similar pace



  • Posts: 0 [Deleted User]


    10 billion euro investment in the grid by ESB Networks up to 2030 to get the grid ready for 80% renewable generation by then




  • Advertisement
  • Posts: 0 [Deleted User]


    More details on the ESB Networks announcement


    ESB Networks will be recruiting a significant number of people over the next five years to drive delivery of the Strategy. The Strategy will also mean further developing global supply chain and contractor partner relationships.  

    The Networks for Net Zero Strategy will: 

    • Enable 9 gigawatts (GW) of onshore wind, 8 GW of solar, and at least 5 GW of offshore wind. 
    • Deliver capability to manage up to 30% of all electricity demand flexibly. 
    • Deliver a smart distribution network through ESB Networks’ National Networks, Local Connections programme.  
    • Connect renewable generation to enable up to 80% of decarbonised electricity. 
    • Support Government commitments under the Housing for All programme by connecting more than 300,000 new homes by 2030.

    Full pdf on the strategy with further details below (150 page)

    https://www.esbnetworks.ie/docs/default-source/publications/networks-for-net-zero-strategy-document.pdf

    20 page summary PDF

    https://www.esbnetworks.ie/docs/default-source/publications/networks-for-net-zero-strategy-summary.pdf



  • Posts: 0 [Deleted User]


    Another solar farm on the way, this time being co-located with a BESS




  • Registered Users, Registered Users 2 Posts: 480 ✭✭getoutadodge




  • Registered Users, Registered Users 2 Posts: 1,292 ✭✭✭MightyMunster




  • Registered Users, Registered Users 2 Posts: 7,114 ✭✭✭timmyntc


    where do we make the savings?

    surely the investment to get away from oil & gas needs to come first?



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Savings will come over the next decades versus burning oil and gas instead and related carbon taxes. Also likely to actually make money from it by exporting excess renewalable energy. It is building infrastructure that we can profit from.



  • Registered Users, Registered Users 2 Posts: 7,114 ✭✭✭timmyntc


    Yes but who pays for it now!

    Its all well and good saying the investment will pay for itself, every good investment pays for itself - but who puts up the capital up front?

    Also the investment in question is ESB networks in grid level infrastructure, not power generation, so there isnt a direct profit to be made either IIRC. So there is a question of who actually funds it? Are ESBN awash with cash to fund it themselves or is this a state subvention?



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    It will be paid for my raising capital or to put it another way, by raising debt. Like any business you take out debt/loan to invest in your business.

    BTW this isn’t all to support renewables. This isn’t an unusual figure, the ESB spent 10 billion over the last decade too, just maintaining and growing the existing network. They need to continue to grow the network to support a planned 300,000 extra homes over the next 10 years, etc.

    While they are talking about renewables, in reality this is mostly just what it costs to maintain the electricity network over 10 years.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    I’m sure all the info is in the ESB’s AGM reports if you are that interested. While the ESB is mostly a semi state company, it operates just like any other commercial business. It takes out loans to invest in it business and it makes a profit (or loss) every year.



  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    Rubbish - energy bills have rocketed in every country that has gone that route



  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Energy bills have rocketed up because of the war on Ukraine and the resulting high cost of gas. Our energy bills would have been even higher had it not been for the renewables we use, as otherwise we would have had to use more gas, obviously.

    Gas drives the margin pricing. This is even true of France where electricity prices reached record highs this past year and have had to be capped and highly subsidised by the French government.



  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    Thats nonsense - price inflation has been far higher on wind energy grids like here and Germany then the likes of France or the Czech Republic. Preciesely because wind needs so much back up from fossil.



  • Registered Users, Registered Users 2 Posts: 8,063 ✭✭✭BKtje


    Wouldn't this be more in line with how much Gas Germany uses while France has a lot of Nuclear so less price inflation? The Czech republic is also mainly powered by two nuclear power plants with coal as backup. The cost of ongoing Nuclear energy is fairly stable (once built) I would have thought.



  • Posts: 0 [Deleted User]


    Important to take into account the fact that the French government has put a cap on the price of energy and are covering the cost of market increases so the price being paid by consumers is not the actual price.

    How long the govt can sustain that is unknown.

    The Czech government are also doing the same thing



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Great thing that we can look at factual data. French electricity is currently higher then Germany and much higher then the likes of both UK and Spain:

    Eur/MWh

    UK Electricity 135.94

    Germany Electricity 168.76

    France Electricity 180.00

    Spain Electricity 67.40

    Italy Electricity 175.38

    Keep in mind that Nuclear only supplies base load power. Even in France, Gas is used for peaking power and as a result sets the margin price for all electricity generation, including the Nuclear. As a result it has been impacted by the same high gas prices as every other European country.



  • Registered Users Posts: 971 ✭✭✭bob mcbob


    Agreed and the problem even with the UK wholesale prices are they are tied to the marginal cost of gas where the costs of renewables is much much lower.

    There is a proposal to decouple retail bills from this high marginal cost which would save up to £18Billion annually

    The reality of the energy market is that it doesn’t allow customers to fully benefit from the cheapest form of electricity – domestically produced low-carbon generation. Despite gas only generating around 40% of our electricity, it largely sets power prices. Rapidly increasing international gas prices have led to rapid increases in energy bills. The situation is clearly unsustainable. It causes unintended consequences in the market and doesn’t allow consumers to reap the rewards of cheap, clean generation.  

    BEIS is looking to address this through a comprehensive long-term programme (The Review of the Electricity Market Arrangements - REMA) which considers more fundamental changes to the market. The reforms envisaged by BEIS in its ongoing REMA consultation could enable an almost complete decoupling of gas from retail electricity prices. The two big questions that arise from a reform of this scale are how quickly this could be achieved, and what this would mean for investment?


    Also the attached shows the actual CfD (wholesale cost of electricity) for the renewable installations in the UK - some are at one third of the current wholesale costs.




  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    The Irish government has spent a massive amount of money subsidising folks energy bills on the back of the greed of companies like SSE who claim to be providing "100%" wind energy. Another 200 euros is coming down the line for that according to media reports this week



  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    They are spot prices that have little relevance to retail prices as they vary massively interday and also fail to account for wind powers back up costs and added network costs. Hence the escalation in standing charges here too. You seem to have conveintly forgotten that the last 2 budgets here included significant credits to households to cover escalating energy bills here with another 200 euro now in the pipeline. So basically taxpayers money is thrown at this black hole too!!

    The link below shows the real costs with Germany and Denmark leading the back with the latter having some of fastest bill increases last year(so much for all their windpower!!)

    https://ec.europa.eu/eurostat/web/products-eurostat-news/-/ddn-20221031-1



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    "The Irish government has spent a massive amount of money subsidising folks energy bills on the back of the greed of companies like SSE who claim to be providing "100%" wind energy. Another 200 euros is coming down the line for that according to media reports this week"

    And France has capped electricity prices, which means the government is directly paying the French electricity industry €16 Billion for the cap.

    This is part of a €45 Billion scheme to support homes and business!

    Never-mind the 100's of Billions that the French have subsidised their Nuclear industry over the years, including government bailouts and nationalisation of EDF and other failing Nuclear companies. EDF is in debt to the tune of €40bn!



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    Germany has spent 500billion euros supporting wind energy since 2012 - and r still demolishing villages to mine coal. I suppose this is your idea of progress...



  • Registered Users, Registered Users 2 Posts: 20,110 ✭✭✭✭cnocbui


    Well as of this precise instant, France has 67% of it's energy being nuclear sourced while here in Ireland, 58% of our electricity is being generated by burning gas, vs France's 12% from gas. Since France's nuclear fraction never falls below 60%, that I have seen, I'd say they are in a better position to make such a thing work that we would be.



  • Registered Users, Registered Users 2 Posts: 20,110 ✭✭✭✭cnocbui


    I just took my wallet out of my right pocket and put in my left. Strangely, I felt no financial pain whatsoever.



  • Posts: 0 [Deleted User]


    By that logic we should be working faster to get more gas out of our generation mix

    Although, as long as any gas remains in the mix, we are still going to be hit with the marginal pricing issue whereby the last source producing dictates the price.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Exactly we can be at 80% renewables in just 10 years.

    It would take us at the very least 20 years to build even one Nuclear power planet and even then one reactor would only give us 10% of our power.

    “Well as of this precise instant, France has 67% of it's energy being nuclear sourced while here in Ireland, 58% of our electricity is being generated by burning gas, vs France's 12% from gas.”

    The fact that France uses so little gas, yet currently has some of the most expensive electricity in Europe clearly demonstrates two things.

    1) The impact of marginal pricing and the fact that it is driven by gas at the moment.

    2) Just how expensive Nuclear power is too. Horribly expensive to build Nuclear power plants, horribly expensive to maintain and repair them and horribly expensive to decommission them and handle the waste for decades to come. There really isn’t anything cheap about Nuclear power.

    Don’t get me wrong, I’m not against Nuclear power at all, I truly hope France can sort it’s issues and get their industry back in shape. But the nuclear industry is in really bad shape at the moment, it really isn’t looking good at all.



  • Registered Users Posts: 971 ✭✭✭bob mcbob


    This is an interesting from the Guardian which shows how the electricity market operates in the UK and how gas fits into this market. It clearly shows why changes are needed to get around the marginal pricing issue - especially when some operators are charging £6000 per MWh to fire up their plants.




  • Advertisement
  • Registered Users, Registered Users 2 Posts: 10,725 ✭✭✭✭tom1ie


    Heres a question I’ve being wondering:

    we are hopefully going to get to 80% renewables by 2030 (highly doubtful if you ask me but anyway), which means fossil fuels (gas) will only be required 20% of the time- so over the year that’s approx 72 days- so what happens to the gas generators for the rest of the year regarding payment to the operators of the gas power station? They will have maintenance costs etc but they’ll have no way to pay for that as they can’t generate electricity- only when renewables aren’t generating- which would be 290 odd days of the year right?

    Or have I got that arseways?



  • Registered Users, Registered Users 2 Posts: 20,110 ✭✭✭✭cnocbui


    In Australia, base load coal fired power stations operators are announcing decade early closures, and it's putting governments in a spot. While they love what initially looks like cheap renewables that are zero CO2, they don't seem to like that there is no zero baseload generation to replace them with, and at least a few seem aware that replacing stable and reliable base load with variable sources might not be a great idea.

    I think I have seen a notion for subsidising these operators to keep their plants open, by the same people who were responsinle for creating the conditions that lead to their operators wanting to decommission them early.



  • Registered Users, Registered Users 2 Posts: 10,725 ✭✭✭✭tom1ie


    If the gas generators are subsidised for the 80% of time they are not generating are we not just paying for electricity generation twice- just to say we have an 80% renewable electricity generation system?

    If so that’s crazy!



  • Moderators, Recreation & Hobbies Moderators, Science, Health & Environment Moderators, Technology & Internet Moderators Posts: 92,471 Mod ✭✭✭✭Capt'n Midnight


    On April 1st 2022 12:45 French nuclear production dropped to 47%. https://www.rte-france.com/en/eco2mix/power-generation-energy-source#

    Fossil fuel was 14%. Renewables 40%. However there was also 7GW of imports representing 11% of what was locally produced. This meant French nuclear was only producing 42% of the electricity on the grid at that time and since a lot of the imports would have been German solar it's quite probable that renewables were producing more power than nuclear on the French grid at that time.


    French nuclear had a 52.9% capacity factor last year. Having over 50 reactors is no guaranteed of reliability.

    France, like the UK , US, Sweden and Canada and 20 other countries, hasn't started and completed a nuclear power plant in the last 30 years. We need a solution in 7 years.



  • Moderators, Recreation & Hobbies Moderators, Science, Health & Environment Moderators, Technology & Internet Moderators Posts: 92,471 Mod ✭✭✭✭Capt'n Midnight


    Fast responding plants already get extra payments to be ready to provide more power. It's nothing new. There'll just be more of it.


    Up to 400 workers at Moneypoint could through burn 2 million tonnes of coal a year. Fuel costs more than wages. Even cheap fuel like coal.


    Baseload is on the way out anyway as we'll soon be able to handle up to 95% of power from non-synchronous generators. That just leaves 5% guaranteed demand, and that could be handled by things like hydro, waste to energy and biomass etc.

    In 2024 we will have some gas stations that can go from off to full power in 6 minutes. So they don't need to be on for entire days, just on demand.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 10,725 ✭✭✭✭tom1ie


    So your saying we already pay an inflated price to keep gas plants in reserve so that we can generate electricity from renewables?



  • Registered Users Posts: 1,228 ✭✭✭gjim


    Modern gas (both open-cycle and CCGT) power plants have low operational costs (don't require many workers, require little maintenance) and low capital costs (the main components are "mass" produced) so the cost of producing electricity by this method is largely driven by the cost of fuel.

    This is in contrast to large steam-turbine coal and nuclear facilities where cap-ex is a major component and where varying the output is expensive, slow and dirty so such plants quickly become uneconomic if not operating 24/7.

    For example, the average capacity factor for an open-cycle gas peaker in the USA is about 12% according to the EIA (even less than the 20% you suggest) - these plants have held this (demand following) niche for years and have been making money doing so even while idling 85% of the time - long before the recent phenomenal growth of renewables.



  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    80% target figures are a meaningless concept when one is taking about a variable source of energy dependent on weather conditions, especcially in a climate as variable as ours. Your notion that France has expensive power compared to us is laughable given the EU retail power prices in the link I posted



  • Registered Users, Registered Users 2 Posts: 10,725 ✭✭✭✭tom1ie


    Yes I understand that- however we clearly have to pay the gas generators when we they are NOT generating otherwise why would they stay in the market?

    So in effect we are paying twice for every renewable GWH generated- once for the renewable source and once for the gas source to keep it in the market for when we need it 20% of the time (by 2030).

    Unless gas generators are happy to take a reduced rate for when they don’t generate which I wouldn’t understand from their business case?



  • Moderators, Science, Health & Environment Moderators Posts: 19,862 Mod ✭✭✭✭Sam Russell


    Well, that is not so.

    If I own a bus I can run a bus service like Dublin Bus where the bus is out all the hours there are passengers. Or I can run a school bus service that does two trips a day - morning and afternoon. The bus in the latter case might work 3 hours per day.

    The capital cost is one charge for the gas plant while it is working or not. The fuel cost only kicks in when it is generating. The business model is based on a certain percentage of operation, and is balanced by a fixed charge for its availability on standby. The prediction of wind production is quite good, so there is plenty of notice for the gas plant to start up.

    Now, my electricity bill has a fixed charge for the connection, and a usage charge. That is the way it is. There is no double charge.



  • Registered Users Posts: 1,228 ✭✭✭gjim


    This has nothing to do with renewables - it's called the capacity market and it has always been around. If your plant has the facility to rapidly respond to demand, then you can bid in this market. The bids are to provide spare capacity (i.e. power availability MW) and promise to make it available to the grid on demand. You're effectively being paid to keep capacity idling/in reserve as a fall back for meeting demand. Thus the bids are in (derated) MW and not energy units - like MWh - which confused the hell out of most of the journalists who reported on the last auction.

    Every grid, regardless of its generation mix requires and has always required spare capacity in this form.



  • Moderators, Recreation & Hobbies Moderators, Science, Health & Environment Moderators, Technology & Internet Moderators Posts: 92,471 Mod ✭✭✭✭Capt'n Midnight


    Since 2010 coal fired electricity in the USA has declined 52%.

    Due to the Inflation Reduction Act (IRA), which includes a 10% tax credit for projects located in nearby communities in coal areas , the Dry Fork facility in Wyoming is now the only coal power plant that's still cheaper than either solar or wind.


    Baseload is on the way out "operating at high output when plentiful clean energy resources operate at zero marginal cost is a waste of fuel"



  • Registered Users, Registered Users 2 Posts: 9,760 ✭✭✭Birdnuts


    Fracked gas has been the game changer in the US in terms of coal use



  • Moderators, Recreation & Hobbies Moderators, Science, Health & Environment Moderators, Technology & Internet Moderators Posts: 92,471 Mod ✭✭✭✭Capt'n Midnight


    Yes it was.

    And it killed off poorly performing nuclear plants too.

    But emissions have to be reduced so natural gas will be a transitional fuel used for peaking when renewables aren't available until such time as other generators , storage (including energy to fuel) , demand reduction take over it's role.


    Natural gas has half the CO2 as coal for the same heat. But on top of that CCGT plant is nearly twice as efficient with that heat as older coal plant. So there's a lot less CO2 emissions from it than coal, and gas is quicker to ramp up and down so less fuel burnt for standby too. It's a lesser evil, for now.



  • Registered Users, Registered Users 2 Posts: 10,725 ✭✭✭✭tom1ie


    Sorry I’m still confused- how are we not paying twice?

    We pay renewables generator for generating.

    We pay gas generator for generating.

    We pay gas generator for getting ready to generate according to wind forecast. (So we are paying gas plus renewables here)

    Are you saying we won’t pay gas generators to be ready for the 80% of the time we won’t need them in 2030?



  • Advertisement