Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Floor insulation question

  • 28-07-2021 9:35am
    #1
    Registered Users Posts: 552 ✭✭✭


    My builders are about to pour my concrete floor slab for an extension. The radon barrier is in, insulation fitted, and the plumber is running pipes. We've had torrential rain and the insulation is literally floating. They've put concrete blocks to stop it lifting up.

    My understanding is that the concrete will just shove everything down evenly, displacing the water and that it'll be grand. I'd have preferred if the concrete was poured when everything was bone dry last week. Does anyone know whether it makes a lot of difference? I'd be interested to hear what more experienced construction people than me have to say. Thanks.



Comments

  • Registered Users, Registered Users 2 Posts: 31 docst


    Eh... Are you pouring the finished floor? I take it that's theres no underfloor heating involved.



  • Registered Users Posts: 552 ✭✭✭pawdee


    There's no underfloor heating involved. Just a concrete slab onto which I'll be putting timber flooring. In the meantime I hired a submersible pump and pumped out all the water.



  • Registered Users, Registered Users 2 Posts: 2,126 ✭✭✭Explosive_Cornflake


    It'll be fine, the concrete will push the water out. Happens in probably 95% of pours. You should have steel mesh on top of the insulation though, and any services would normally be tied onto the mesh and these will floating during the pour.



  • Registered Users Posts: 552 ✭✭✭pawdee


    The heating pipes are just clipped to the insulation but there's no mesh reinforcement. I better ask the builder about that. Thanks for the advice.