Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Minor schemes & realignments

2456717

Comments

  • Registered Users, Registered Users 2 Posts: 1,216 ✭✭✭cargo


    roadmaster wrote: »
    Some very minor works about km south of clonmellon on the N52 looks like WCC are doing some road widening works

    Whereabouts on the road are they working? Are they widening the surface / straightening a bend or just opening up the sightlines through a bend?

    Always good to see a bit of work on this route.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    They’re working over I'd say a 200 meter stretch going south about 1km outside clonmellon. They have removed all the hedge and are building up an embankment but with the type of material that I see them rolling I can't be certain if it is for a lane as it didn't look like great fill. Maybe they plan to put in a barrier, I never even realised there was a big drop until the hedge was gone. WCC have their own men and plant on site by the looks of things


  • Registered Users, Registered Users 2 Posts: 714 ✭✭✭ricimaki


    IMPROVEMENT works at one of the most “dangerous” and “busiest” junctions in County Limerick have been accelerated by councillors in the Cappamore-Kilmallock municipal district.

    They backed the latest stage in the process to construct a €2 million roundabout at Beary’s Cross on the N24. It connects the R513 Limerick to Mitchelstown Road with the Limerick to Tipperary Road.

    Tim Fitzgerald, of the Mid-West National Road Design Office, and consulting engineers - Kilgallen & Partners, gave local councillors a presentation on submissions received after it went on public consultation. It will be a four leg roundabout, north and south on the N24, the link to Mitchelstown and Murroe-Boher GAA club’s pitch.
    Source.

    Here's an image of the roundabout design:
    GN4_DAT_9031724.jpg--the_improvements_works_at_beary_s_cross_are_designed_to_make_the_very_busy_junction_safer_and_ease_backlogs.jpg


  • Registered Users, Registered Users 2 Posts: 290 ✭✭Pete2k


    Looks as if the N60 Oran realignment is finally getting underway.


  • Registered Users Posts: 18 Freddypaccman


    According to the Cavan County Council website the N55 realignment will be complete by October 2018. there is a reduced speed limit on the road now and there will be traffic lights from tomorrow (Monday) just south of Ballinagh for 4 weeks which I think is for the scheme.


  • Registered Users Posts: 18 Freddypaccman




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Tender award for N56 Coolboy-Kilmacrennan in December. Should start soon after: https://www.donegalnow.com/news/pat-cope-welcomed-progress-made-n56-road-projects/196673

    Tender award for N70 Kilderry Bends shortly: http://www.radiokerry.ie/e10-million-improvement-scheme-announced-castlemaine-killorglin/


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    Has anyone seen the roadworks WCC is carrying out on the N52 south of clonmellon?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Sorensen Civil Engineering Ltd appointed as contractor for N70 Kilderry Bends in Co. Kerry.

    https://www.irishexaminer.com/ireland/10m-works-to-rectify-dangerous-bends-on-kerry-road-464415.html

    3.5km offline realignment. €10m. 2019 opening


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Minor scheme funding for 2018:

    Route number | County | Scheme | Allocation | Stage | Part of major?
    02 | Monaghan | Monaghan-Emyvale Phase 3 | 6,000,000 | 2018 start
    03 | Cavan | Virginia to Maghera | 150,000 | Planning
    16 | Leitrim | Drummahan | 500,000 | Planning
    16 | Leitrim | Munakill realignment | 100,000 | Planning
    16 | Sligo | Lugnatober | 170,000 | Planning
    17 | Galway | Milltown to Gortnagunnad | 150,000 | Planning
    19 | Clare | Shannon Airport Access | 25,000 | Planning
    22 | Kerry | Lewis Road junction | 25,000 | Planning
    24 | Kilkenny | Tower Road overbridge | 100,000 | Planning
    24 | Kilkenny | Carrick Road improvement | 210,000 | Planning
    24 | Tipperary | Ballydrehid Bends | 150,000 | Planning
    26 | Mayo | Cloongullane Bridge | 700,000 | Planning
    51 | Meath | Dunmoe Phase II | 600,000 | ?
    52 | Meath | Grange to Clontail | 250,000 | Planning
    52 | Westmeath | Cloghan-Billistown | 1,470,000 | Construction
    52 | Westmeath | Cloghan-Billistown Phase 2 | 250,000 | Planning
    53 | Louth | Barronstown to Hackballscross | 120,000 | Planning
    53 | Louth | Hackballscross to Rassan | 250,000 | Planning
    53 | Louth | Barronstown to Newtownbalregan | 150,000 | Planning
    54 | Monaghan | Tullybryan | 3,000,000 | Planning
    55 | Cavan | Corduff to South of Killydoon - Sec A | 4,000,000 | Construction
    55 | Cavan | Corduff to South of Killydoon - Sec B | 1,750,000 | Planning
    56 | Donegal | Boyoughter to Kilkenny | 250,000 | Opened 2017 | Dungloe-Glenties
    56 | Donegal | Coolboy to Kilmacrennan | 5,000,000 | 2018 start
    56 | Donegal | Drumbeigh-Inver | 250,000 | Planning | Mountcharles-Inver
    56 | Donegal | Kilkenny-Letterilly | 6,000,000 | Construction | Dungloe-Glenties
    56 | Donegal | Kiltoy realignment | 600,000 | Opened 2017
    56 | Donegal | Letterilly to Kilraine Jn (R262) | 250,000 | Planning (next phase) | Dungloe-Glenties
    56 | Donegal | Mountcharles-Drumbeigh | 4,500,000 | 2018 start | Mountcharles-Inver
    59 | Galway | Maam Cross to Bunnakill | 1,000,000 | Planning | Oughterard-Clifden
    59 | Mayo | Kilmeena | 2,500,000 | 2018 start | Westport-Mulranny
    59 | Mayo | Newport-Derrada | 100,000 | Planning | Westport-Mulranny
    59 | Galway | Letterfrack West | 200,000 | Planning
    59 | Sligo | Corhawnagh-Lugnadeffa | 120,000 | Planning
    60 | Mayo | Heathlawn | 500,000 | Planning
    60 | Mayo | Lagnamuck | 550,000 | 2019 start
    60 | Mayo | Manulla Cross | 50,000
    60 | Roscommon | Oran | 650,000 | Planning
    61 | Roscommon | Ballymurray-Knockcroghery | 250,000 | Planning
    61 | Roscommon | Clashaganny-Tulsk | 250,000 | Planning
    61 | Roscommon | Coolteige | 4,300,000 | 2018 start
    63 | Galway | Abbeyknockmoy-Annagh Hill (M17) | 4,000,000 | Construction | Gort-Tuam
    63 | Galway | Liss to Abbey | 50,000 | Planning
    65 | Tipperary | Carrigahorig bends | 50,000 | Planning
    67 | Galway | Ballinderreen to Kinvara Phase 2 | 1,300,000 | Planning
    67 | Clare | Blake's Corner - Ennistimon | 100,000 | Planning
    70 | Kerry | Blackwater Bridge to Sneem | 100,000 | Planning
    70 | Kerry | Coolroe to Glenbehy | 100,000 | Planning
    70 | Kerry | Kilderry Bends | 500,000 | 2018 start
    72 | Kerry | Stagmount Bends | 100,000 | Planning
    73 | Cork | Annakisha South | 5,000 | Planning
    73 | Cork | Clogher's Cross to Waterdyke | 100,000 | Planning
    74 | Tipperary | Ballyhusty | 100,000 | Planning
    76 | Kilkenny | Tennypark-Brownstown | 450,000 | Construction
    77 | Kilkenny | Ballyragget-Ballynaslee | 110,000 | Planning
    80 | Laois | Maidenhead | 2,500,000 | Construction
    81 | Wicklow | Knockroe | 2,500,000 | 2018 start
    81 | Wicklow | Irishtown | 10,000 | Planning
    81 | Wicklow | Hangmans Bend | 10,000 | Planning
    81 | Wicklow | Tuckmill | 10,000 | Planning
    81 | Wicklow | Whitestown Lower | 10,000 | Planning
    85 | Clare | Kilnamona realignment | 25,000 | Planning
    86 | Kerry | Ballynasare/Ballygarret | 200,000 | Construction | Tralee-Dingle
    86 | Kerry | Lispole to Mountoven | 500,000 | Planning | Tralee-Dingle


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Registered Users, Registered Users 2 Posts: 19,474 ✭✭✭✭road_high


    N77 Kilkenny Ballyragget-Ballynaslee 110,000 Planning

    First I've ever heard of this scheme? This wouldn't be the worst section of the N77 Portlaoise-Kilkenny road, it's the part passing the Glanbia factory.
    I'd have thought the sections between Kilkenny and Ballyragget far worse and in need of a major upgrade first?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    road_high wrote: »
    N77 Kilkenny Ballyragget-Ballynaslee 110,000 Planning

    First I've ever heard of this scheme? This wouldn't be the worst section of the N77 Portlaoise-Kilkenny road, it's the part passing the Glanbia factory.
    I'd have thought the sections between Kilkenny and Ballyragget far worse and in need of a major upgrade first?
    This is a new scheme and only starting off now. I'm guessing it'll connect the N77 Ballynaslee realignment and Ballyragget itself.


  • Registered Users, Registered Users 2 Posts: 19,474 ✭✭✭✭road_high


    marno21 wrote: »
    This is a new scheme and only starting off now. I'm guessing it'll connect the N77 Ballynaslee realignment and Ballyragget itself.

    Indeed. There is scope for improvement (pavement and widening). That must be the logic, connect the new scheme with the rest.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    N70 Kilderry bends contract award:

    https://irl.eu-supply.com/ctm/Supplier/PublicTenders/ViewNotice/199512

    Expect to see diggers in the next few months.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 19,474 ✭✭✭✭road_high


    marno21 wrote: »
    This is a new scheme and only starting off now. I'm guessing it'll connect the N77 Ballynaslee realignment and Ballyragget itself.

    I think this is just a signs/lines and resurfacing scheme which makes sense.


  • Registered Users, Registered Users 2 Posts: 5,201 ✭✭✭ongarboy


    Check out this article: "Funding allocated for development of Listowel Bypass and Tralee Northern Relief Road" on the Radio Kerry app
    https://5uo3.app.link/XitF1LXcLJ

    Good news for Kerry roads!


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Registered Users, Registered Users 2 Posts: 13,802 ✭✭✭✭joujoujou
    Unregistered Users


    And knowing Wills, will likely be finished ahead of schedule. :)


  • Registered Users, Registered Users 2 Posts: 279 ✭✭discodaveirl


    joujoujou wrote: »
    And knowing Wills, will likely be finished ahead of schedule. :)

    Have they much on at the moment... There a great crew to do work..


  • Advertisement
  • Registered Users Posts: 2,023 ✭✭✭Donegal Storm


    N56 Letterkenny to Kilmacrennan looks to be progressing well, no works on the main carriageway yet but seems to be a lot of offline sections with vegetation clearance and topsoil stripping ongoing


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    N56 Letterkenny to Kilmacrennan looks to be progressing well, no works on the main carriageway yet but seems to be a lot of offline sections with vegetation clearance and topsoil stripping ongoing

    That's good news, when did that start? Must have been pretty recently.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    spacetweek wrote: »
    That's good news, when did that start? Must have been pretty recently.

    Tender was awarded just before Christmas so I'd imagine start of January


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    According to CIS Ireland, N61 Coolteige (Phase 1) started today.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Tender for N56 Coolboy-Kilmacrennan awarded to BAM Civil

    https://irl.eu-supply.com/ctm/Supplier/PublicTenders/ViewNotice/201202


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    Did I read the tender correctly that points awarded for the tender was just the lowest bid?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    marno21 wrote: »
    N70 Kilderry bends contract award:

    https://irl.eu-supply.com/ctm/Supplier/PublicTenders/ViewNotice/199512

    Expect to see diggers in the next few months.
    Quite a lot of work underway on this now with very visible earthworks at the Milltown end of the scheme, and also at the Killorglin side near the Golf Club road turn off.

    Scheme is entirely offline so not very visible to motorists for a while yet and no disruption until they start on the tie ins.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Main contractor awarded for N56 Coolboy to Kilmacrennan, outside Letterkenny. Up to now site prep and topsoil strip were taking place so this looks like the start of main works.


  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Drove both N63 Abbeyknockmoy and N61 Coolteige today. AKM looking well, mostly done and a welcome improvement. Have to say that most of the N63 to Roscommon is sh*te altogether and many changes are needed.

    Couldn't see much of N61 as it's offline. Only construction signs at the northern end.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    spacetweek wrote: »
    Main contractor awarded for N56 Coolboy to Kilmacrennan, outside Letterkenny. Up to now site prep and topsoil strip were taking place so this looks like the start of main works.

    Yep awarded to BAM as per post #78.
    spacetweek wrote: »
    Drove both N63 Abbeyknockmoy and N61 Coolteige today. AKM looking well, mostly done and a welcome improvement. Have to say that most of the N63 to Roscommon is sh*te altogether and many changes are needed.

    Couldn't see much of N61 as it's offline. Only construction signs at the northern end.

    Totally agree on the N63 (in fact we were talking about this on SSC at the weekend). Next up on the N63 is a few km east of Abbeyknockmoy which will take out the bridge over the River Abbert which is a joke.


  • Registered Users Posts: 156 ✭✭Dev1234


    marno21 wrote: »
    Yep awarded to BAM as per post #78.



    Totally agree on the N63 (in fact we were talking about this on SSC at the weekend). Next up on the N63 is a few km east of Abbeyknockmoy which will take out the bridge over the River Abbert which is a joke.

    Hi Marno21,

    Any idea of when the next Abbeyknockmoy works will start? I'd heard about the plans locally but wasn't sure if they were legit.

    Thanks


  • Registered Users Posts: 2,023 ✭✭✭Donegal Storm


    I was up around Letterkenny a couple of months ago and there looked to be topsoil stripping and clearance work already underway, how is the tender only being awarded now? Are the main works under a different contract?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Dev1234 wrote: »
    Hi Marno21,

    Any idea of when the next Abbeyknockmoy works will start? I'd heard about the plans locally but wasn't sure if they were legit.

    Thanks
    Scheme is at preliminary design stage, so will only be at route selection and design state in 2018. I'd imagine 2021 will be the earliest for a start on the scheme.

    Painfully slow, but the Minister has confirmed that he has no interest in proceeding with these schemes even though they are part of the 2013-2020 Road Safety Strategy and are being heavily pushed by the RSA, TII, and the local authorities involved. NINE schemes will start in 2018, there are 62 active at present and at least 40 others being pursued by local authorities with no funding.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    I was up around Letterkenny a couple of months ago and there looked to be topsoil stripping and clearance work already underway, how is the tender only being awarded now? Are the main works under a different contract?

    Yes they are.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Sligo County Council progressing with a realignment of the N59 just west of Ballisodare

    https://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=128413&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/publictenders


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Reported on CIS Ireland:


    11th May 2018: Gibson Brothers (Ireland) Limited, Co. Louth have been appointed for the N2 Corracrin to Emyvale Road Realignment.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21




  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    marno21 wrote: »

    Seems like you could easily reinstate them after widening.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Update on Minor Works in Cork

    N73 Clogher Cross/Waterdyke: 100k for 2018 for CPO, consultants to be appointed to complete design
    N73 Annakisha: 5k for 2018. CPO published November 2017, Oral Hearing date awaited from ABP.
    N71 Newmills: Feasibility and project appraisal to be completed
    N72 Carrig to Ballygriffin: At route selection stage.


  • Registered Users Posts: 3,847 ✭✭✭roadmaster




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    N73 Annakisha realignment has entered the CPO stage as per Corkman today. Construction expected to begin in 2019

    N80 Maidenhead near Arles in Co. Laois is to start in October, tender due in June: https://laois-nationalist.ie/2018/06/14/contract-to-straighten-dangerous-bends-at-arles-will-be-awarded-in-october/


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    marno21 wrote: »
    N73 Annakisha realignment has entered the CPO stage as per Corkman today. Construction expected to begin in 2019

    N80 Maidenhead near Arles in Co. Laois is to start in October, tender due in June: https://laois-nationalist.ie/2018/06/14/contract-to-straighten-dangerous-bends-at-arles-will-be-awarded-in-october/
    Article on N73 realignment: https://www.independent.ie/regionals/corkman/news/cpos-agreed-for-n73-realignment-scheme-37007246.html


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    N60 Lagnamuck scheme has gone to tender. This wasn't in the 2018 agenda so extra funding must have been allocated

    https://irl.eu-supply.com/app/rfq/publicpurchase.asp?PID=130581


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Tender issued for 1.5km of widening of the R498 near J25 on the M7.

    https://irl.eu-supply.com/app/rfq/publicpurchase.asp?PID=131609


  • Registered Users Posts: 3,847 ✭✭✭roadmaster


    Resurfacing working between Delvin and Clonmellon last week and i think this week


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Kerry County Council proceeding with a realignment of the N70 SE of Caherdaniel, totalling 1.2km

    http://www.kerrycoco.ie/part-v111-brackaharagh-road-project/


  • Registered Users Posts: 156 ✭✭Dev1234


    Hi all,

    Does anyone have an update on the N63 works outside Abbeyknockmoy?

    Works looked like they stopped there for a while and there isn't much progress on a weekly basis.

    Is there a finish date that they are working to?

    Thanks


  • Registered Users Posts: 4,321 ✭✭✭m17


    Dev1234 wrote: »
    Hi all,

    Does anyone have an update on the N63 works outside Abbeyknockmoy?

    Works looked like they stopped there for a while and there isn't much progress on a weekly basis.

    Is there a finish date that they are working to?

    Thanks
    IMAG3249_zpsxm9xce9t.jpg
    Works where to be finished on the end of may and it was pushed back to the 29/06/18 now it looks like it will be the end of July before works are completely finished