Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Fine Geals 10 year plan includes talk of infrastrucure

2»

Comments

  • Banned (with Prison Access) Posts: 1,121 ✭✭✭ClovenHoof


    The Dublin metro would have to be a 24 hour service considering the airport being busy 24 hours a day with passengers and employees. Have a rail transport service from Sandyford to Swords right though the city centre at all times will be a game changer for the city.


  • Registered Users, Registered Users 2 Posts: 19,688 ✭✭✭✭Muahahaha


    ClovenHoof wrote:
    The Dublin metro would have to be a 24 hour service considering the airport being busy 24 hours a day with passengers and employees. Have a rail transport service from Sandyford to Swords right though the city centre at all times will be a game changer for the city.

    It'll be a long time before the Metro gets to Sandyford.

    Dart Underground is the real game changer though, more so than the Metro to the airport imo.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    I think extending the Dart to Balbriggan is a daft idea, and I wish it would be called out for what it is, much like how the 78 million saving for short platforms on the "new Metro North" would be.

    There's no turnback facilities or sidings etc there, much like how it is for Malahide now except worse. The service will only get worse for everyone further north with increased congestion on the line. It's not a very comfortable journey on trains without toilets all the way from Balbriggan either, assuming it's all-stopping also.


  • Moderators, Science, Health & Environment Moderators Posts: 19,862 Mod ✭✭✭✭Sam Russell


    Mod: Post deleted as off topic rant.



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Muahahaha wrote: »
    Dart Underground is the real game changer though, more so than the Metro to the airport imo.

    I've seen one or two people say this but I've never understood why?

    Obviously DU is very important, but I don't see it being more important then Dublin Metro.

    DU doesn't bring rail to anywhere that doesn't already have rail. It just potentially improve services for areas that already have rail. Of course great for folks on those lines, but not really a major change.

    Dublin Metro on the other hand looks to be far more important imo.

    First of all it brings rail to Dublin Airport and connects it speedily to the city. Being a small island on the edge of Europe with a mostly service based economy with lots of international companies here, makes Dublin Airport the single most important piece of infrastructure we have. So connecting DA to the city by Metro is not only a priority for Dublin, but a national priority (along with the second runway) IMO.

    Then you have Swords, the 5th largest urban area in Ireland, yet the only one without rail, all while being a commuter town of Dublin. Madness! They plan on building 40,000 new homes in Sowrds once DM is built, which directly ties in with the other current national priority of solving the housing crises

    Then you have upgrading the Green line to Metro which should allow 10' of thousands more apartments in South Dublin. Again helping with the housing crisis.

    And finally you have the fact that North Dublin inside the M50 is actually the most densely populated area of Ireland, yet has no rail.

    I really don't see how just bringing DART to some areas that already have rail is going to be more important then all of the above.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    I think DU is a game changer as it vastly improves the service across.a wide part of Dublin, makes the train service much more relevant to the SW where there is the most potential for new housing and business development in Dublin, and links the city centre areas with the highest workplace and economic activity, with the lines that have huge potential to carry more passengers also. Metro North doesn't do anything for the city centre, but it is a huge improvement for Swords and D9. DU joins up areas of huge economic activity with a wider network. And with something better than 60 metre platforms.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    lucernarian, so a bunch of train stations that already have commuter rail get upgraded to DART. Great for them, but I really don't see how that is more beneficial then everything Dublin Metro offers.

    I don't see how the SW of Dublin has anymore potential for new housing then Swords, North Dublin and South of Dublin do! Massive plans for thousands of new apartments in these areas. Not much currently planned for the SW

    Don't get me wrong, DU is very important, but I've never seen a convincing argument why DU offers more then DM.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Also I don't know how you can say that it won't do anything for the city centre!

    The main city centre axis is South to North, this will allow people quickly and easily get from Stephens Green Area to OConnell St and Henry street area. Also the city centre will benefit massively from being able to get quickly too and from the airport.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Whilst DART Expansion and Metro North are both Dublin centric schemes, they are very different and have very different benefits for different areas. Neither is more important than the other, because they offer massive benefits to different areas. Both are absolute top priority schemes.

    DART Expansion will provide increased capacity on the DART lines, and also provide one thing we don't have, a heavy rail network in Dublin. Having a network as opposed to a series of unconnected lines is massive.

    Metro brings rail access to places that don't have it, and provides high quality rapid transit to a corridor that should've had it years ago. My main issue with the Metro is when you take it into account with everything along it, I can see it reaching capacity quite quickly.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    bk wrote: »
    lucernarian, so a bunch of train stations that already have commuter rail get upgraded to DART. Great for them, but I really don't see how that is more beneficial then everything Dublin Metro offers.

    I don't see how the SW of Dublin has anymore potential for new housing then Swords, North Dublin and South of Dublin do! Massive plans for thousands of new apartments in these areas. Not much currently planned for the SW

    Don't get me wrong, DU is very important, but I've never seen a convincing argument why DU offers more then DM.
    I'm sorry that you don't find anything convincing in what I wrote. Looking at the amount of available land between Ballymun and the airport (intended for office/business use currently), plus the amount of land available between the airport and Swords (even less here), there's just not the amount of land available all the way from Kishoge, the potential of Adamstown, and further out all the way to Sallins.

    Unfortunately for Metro North, it benefits the established parts of Swords more than on the western side like where the bus routes go closer towards. Shuttle bus setups could help with this but there aren't lots of convincing examples where local shuttles plus modal shift work.

    I would appreciate if you didn't trim the other parts of my message though, even if you don't agree with points.
    Edit: the Luas BXD was supposed to provide just the sort of mobility on rails from SSG to Parnell Square, so it's ironic to talk about "unserved areas" now getting served by rail.


  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    There's significantly more development land available in West Dublin than along the North Fringe. The airport safety zones prohibit much development along an East West axis running through the airport and when the second parallel runway opens it'll make this area much wider.

    Adamstown and Clonburris alone have huge potential to house masses of people adjacent to a 4 track railway.

    To my mind DU remains the linchpin with MN fulfilling an essential role.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    I'm sorry that you don't find anything convincing in what I wrote. Looking at the amount of available land between Ballymun and the airport (intended for office/business use currently), plus the amount of land available between the airport and Swords (even less here), there's just not the amount of land available all the way from Kishoge, the potential of Adamstown, and further out all the way to Sallins.

    And those proposed offices/business are just as important if not more important. We badly need more office space to capture as much of the Brexit business as possible.

    That is why I say Metro North is nationally more important. DU is important locally for Dublin, but MN is nationally important. Linking the airport to Dublin and building thousands of more offices near the Airport really are national priorities.

    Honestly no matter how many times I look over the proposed DU plans, I just don't see why a lot of the development along the lines can't already be done without the tunnel. The stations are already there, the commuter trains are already there. After all Adamstown has been a big failure, it doesn't really show that their is actually much demand along this axis, at least not for the moment.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    bk wrote: »
    And those proposed offices/business are just as important if not more important. We badly need more office space to capture as much of the Brexit business as possible.

    That is why I say Metro North is nationally more important. DU is important locally for Dublin, but MN is nationally important. Linking the airport to Dublin and building thousands of more offices near the Airport really are national priorities.

    Honestly no matter how many times I look over the proposed DU plans, I just don't see why a lot of the development along the lines can't already be done without the tunnel. The stations are already there, the commuter trains are already there. After all Adamstown has been a big failure, it doesn't really show that their is actually much demand along this axis, at least not for the moment.
    This shouldn't be a complicated sell though - Adamstown is essentially underdeveloped and not near the train station. It is not a "big failure". People aren't so fond of bring dumped at Heuston station right now. There is basically no impediment to significant planned development, both residential and business-related. I see where you're coming from, but not enough to say that Metro North, especially the stupid Aecom-designed variant, is clearly more important than DU.


  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    The current Kildare route offering is simply too poor to draw any valid conclusions about what usage patterns would be like if DU existed and DARTs were able to take you every 10 minutes off peak into and out of the CBD.

    We still don't have integrated fares, so the change at Heuston incurs a penalty which discourages interchange straight away.

    Frequency is far too low to attract turn up and go passengers.

    Frequency is far too low to allow bus feeder routes to sweat the asset that exists.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    murphaph wrote: »
    We still don't have integrated fares, so the change at Heuston incurs a penalty which discourages interchange straight away.

    Agree 100%, ridiculous. We really should have an amsterdam style system, pay per km travelled, irrespective of bus/tram/metro.

    But that should be fixable, at least as a first step at a fraction of the cost of DU. Also add a free Luas trip to intercity trips as you are at it.
    murphaph wrote: »
    Frequency is far too low to attract turn up and go passengers.

    Frequency is far too low to allow bus feeder routes to sweat the asset that exists.

    Though you could increase frequency by converting it to DART operations, even without the tunnel, as a cheap alternative, to see if it leads to increased demand.

    Part of the problem, is that we aren't all that certain people actually want and are willing to moving out to West Dublin. We know for certain that people are very enthusiastic about living in South Dublin, given the success of the Green Luas line and upgrading it to Metro will give it the capacity to handle a lot more people living there. Likewise Swords has been a success and has very firm plans for 40,000 extra homes. And the DAA has big, firm plans for offices near the Airport.

    West Dublin on the other hand seems a bit of a mess. Not much in the way of firm plans. Most people their seem to just want to live in the typical three bed semi with a car out front and drive. Adamstown has failed as a more some what high density apartment type commuter town.

    West Dublin seems to be where people who really want a house but can't afford one in the city now go. I'm not sure the demand for apartments out their is really their yet.

    I think that the focus over the next 10 years will be more the South-North axis, building lots of apartments in South of Dublin, around Swords and really probably redeveloping Dublin Port as apartments. Basically densification to areas close to the city.

    Once that is tapped out, then the focus will need to turn to West Dublin. But I don't think we really are their yet.


  • Advertisement
  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    bk wrote: »
    Agree 100%, ridiculous. We really should have an amsterdam style system, pay per km travelled, irrespective of bus/tram/metro.

    But that should be fixable, at least as a first step at a fraction of the cost of DU. Also add a free Luas trip to intercity trips as you are at it.



    Though you could increase frequency by converting it to DART operations, even without the tunnel, as a cheap alternative, to see if it leads to increased demand.

    Part of the problem, is that we aren't all that certain people actually want and are willing to moving out to West Dublin. We know for certain that people are very enthusiastic about living in South Dublin, given the success of the Green Luas line and upgrading it to Metro will give it the capacity to handle a lot more people living there. Likewise Swords has been a success and has very firm plans for 40,000 extra homes. And the DAA has big, firm plans for offices near the Airport.

    West Dublin on the other hand seems a bit of a mess. Not much in the way of firm plans. Most people their seem to just want to live in the typical three bed semi with a car out front and drive. Adamstown has failed as a more some what high density apartment type commuter town.

    West Dublin seems to be where people who really want a house but can't afford one in the city now go. I'm not sure the demand for apartments out their is really their yet.

    I think that the focus over the next 10 years will be more the South-North axis, building lots of apartments in South of Dublin, around Swords and really probably redeveloping Dublin Port as apartments. Basically densification to areas close to the city.

    Once that is tapped out, then the focus will need to turn to West Dublin. But I don't think we really are their yet.
    West Dublin would be more successful if you had a rail line that took people where they wanted to go and didn't dump them outside the city centre only for them to hop on a crushed full tram.

    If you were able to get off in the city centre without hassle it would be used a lot more.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    marno21 wrote: »
    West Dublin would be more successful if you had a rail line that took people where they wanted to go and didn't dump them outside the city centre only for them to hop on a crushed full tram.

    If you were able to get off in the city centre without hassle it would be used a lot more.

    Of course, you are absolutely correct, but at what cost?

    DU was going to cost 4 billion, twice as much as Metro North. Would it have actually brought in the same increase in passengers as Dublin Metro will?

    And another thing to consider. For that 4 Billion, you could build the North - South Dublin Metro, but also an East - West Metro line, from say deep in Dublin Port, out towards Lucan. That seems to give you a lot more bang for your buck IMO. You could then still DARTify the lines.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    bk wrote: »
    Of course, you are absolutely correct, but at what cost?

    DU was going to cost 4 billion, twice as much as Metro North. Would it have actually brought in the same increase in passengers as Dublin Metro will?

    And another thing to consider. For that 4 Billion, you could build the North - South Dublin Metro, but also an East - West Metro line, from say deep in Dublin Port, out towards Lucan. That seems to give you a lot more bang for your buck IMO. You could then still DARTify the lines.

    What's the cost difference between DART Underground and an east west Metro?

    The 4bn also includes line electrification. To maynooth, hazelhatch and drogheda


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    marno21 wrote: »
    What's the cost difference between DART Underground and an east west Metro?

    The 4bn also includes line electrification. To maynooth, hazelhatch and drogheda

    I think the electrification element is only about 300 million out of that 4 billion.

    The two big differences would be dual bore tunnel versus single bore and much longer underground station boxes (due to longer trains), plus all the extra complexities and signalling of heavy rail.

    Now they are talking about making DU single bore, though you would still have the issue of much longer station boxes, etc. Also if you water DU down enough, it ends up not being much more then a Metro anyway.

    Based on the original plans, Metro North was to cost 2.4 Billion, 16km long, 10km underground.

    DU was to cost €4 Billion for just 7.6km of tunnel.

    Dublin Port to Lucan is about 16km too, so you would roughly be looking at the same cost as Metro North.


  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    marno21 wrote: »
    What's the cost difference between DART Underground and an east west Metro?

    The 4bn also includes line electrification. To maynooth, hazelhatch and drogheda
    And level crossing closures and the rolling stock for the extended DART network!

    I cannot accept that we should build a parallel metro to an existing 4 track railway that is currently underutilised because it stops short of where people need to go.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    bk wrote: »
    I think the electrification element is only about 300 million out of that 4 billion.

    The two big differences would be dual bore tunnel versus single bore and much longer underground station boxes (due to longer trains), plus all the extra complexities and signalling of heavy rail.

    Now they are talking about making DU single bore, though you would still have the issue of much longer station boxes, etc. Also if you water DU down enough, it ends up not being much more then a Metro anyway.

    Based on the original plans, Metro North was to cost 2.4 Billion, 16km long, 10km underground.

    DU was to cost €4 Billion for just 7.6km of tunnel.

    Dublin Port to Lucan is about 16km too, so you would roughly be looking at the same cost as Metro North.
    The savings from making 5 underground stations on Metro North, plus the 8-10 stations above ground, 60 metres instead of 90 metres, was 78 million.

    If we assume that 70 million of the savings was from the shorter underground platforms, that's something like 500k per metre of platform for a twin bore underground setup, for a smaller loading gague than Dart. 300 metres of underground platform for Metro North vs 800 metres of dart underground platform. 250 million euro extra cost. And 5 X 160 metre platforms would cost more than 4 X 200 metre platforms.

    It's rather crude, but I can't imagine the platform lengths are a significant part of DU, any more than they were for Metro North.

    But this bit:
    DU was to cost €4 Billion for just 7.6km of tunnel.
    This is completely inaccurate. It's not even just a slip of the finger, it's a complete distortion of facts and reality. I don't know who you're trying to convince, here of all places, with spurious commentary like that.


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    But this bit:

    This is completely inaccurate. It's not even just a slip of the finger, it's a complete distortion of facts and reality. I don't know who you're trying to convince, here of all places, with spurious commentary like that.

    No distortion! Building a full, dual bore, heavy rail tunnel is simply much more expensive then a standard Metro.

    I've no problem with DU as such, as the point is to integrate with the rest of the heavy rail network, so the increased cost is justified.

    But MN doesn't need to directly integrate with the heavy rail network ,it needs to integrate with the Luas network, so the idea of spending lots of extra money to make it heavy rail simply has no justification.


  • Registered Users, Registered Users 2 Posts: 19,688 ✭✭✭✭Muahahaha


    bk wrote: »
    I've seen one or two people say this but I've never understood why?

    Obviously DU is very important, but I don't see it being more important then Dublin Metro.

    DU doesn't bring rail to anywhere that doesn't already have rail. It just potentially improve services for areas that already have rail. Of course great for folks on those lines, but not really a major change.

    Dublin Metro on the other hand looks to be far more important imo.

    First of all it brings rail to Dublin Airport and connects it speedily to the city. Being a small island on the edge of Europe with a mostly service based economy with lots of international companies here, makes Dublin Airport the single most important piece of infrastructure we have. So connecting DA to the city by Metro is not only a priority for Dublin, but a national priority (along with the second runway) IMO.

    Then you have Swords, the 5th largest urban area in Ireland, yet the only one without rail, all while being a commuter town of Dublin. Madness! They plan on building 40,000 new homes in Sowrds once DM is built, which directly ties in with the other current national priority of solving the housing crises

    Then you have upgrading the Green line to Metro which should allow 10' of thousands more apartments in South Dublin. Again helping with the housing crisis.

    And finally you have the fact that North Dublin inside the M50 is actually the most densely populated area of Ireland, yet has no rail.

    I really don't see how just bringing DART to some areas that already have rail is going to be more important then all of the above.

    I dont disagree that Metro North is important but I would place a higher value on Dart Underground because of the overall network effect it will deliver for heavy rail. Not only will it connect the two main train stations but it will also be running an east to west spine along the south of the city from SSG to Inchicore. By connecting Connolly & Hueston via Dart it will then open up tons of possibilities for new routes. Once the Maynooth line and north of Malahide is electrified it suddenly becomes possible to run tons of extra routes through the city centre going north, south or west. Right now all we have is north to south but Dart Underground would finally make a network out of heavy rail in Dublin.

    With Metro North I see the benefits mainly being for people who live along the line rather than Dublin Airport itself. I realise the airport is one of the few in Europe without a rail connection but I would also hazard a guess that it is one of the closest to the city centre anywhere in Europe. When Metro North is built I cannot forsee any major advantages in journey times via the metro vs. by Aircoach and other buses through the tunnels. It is still going to take 25-35 minutes no matter what. The main benefit will be for people living in Swords who already have two good options in the M1 and port tunnel for getting into town.

    Whereas with Dart underground far more people will benefit. Both MN and DU are important proects, I just see DU as the one that will deliver more utility to more people whereas MN wont really improve journey times by much relative to the services and infrastructure that is already there.

    All that said if I had my way Id build both at the same time, starting yesterday :)


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    Muahahaha wrote: »
    With Metro North I see the benefits mainly being for people who live along the line rather than Dublin Airport itself. I realise the airport is one of the few in Europe without a rail connection but I would also hazard a guess that it is one of the closest to the city centre anywhere in Europe. When Metro North is built I cannot forsee any major advantages in journey times via the metro vs. by Aircoach and other buses through the tunnels. It is still going to take 25-35 minutes no matter what. The main benefit will be for people living in Swords who already have two good options in the M1 and port tunnel for getting into town.

    25 minutes.

    But you can say that for pretty much almost all types of rail. Buses given ideal circumstances can be the same or faster then Luas/Metro/DART/Intercity Rail. To be honest if you are going to make this agrument, then you might as well close down every rail line in Ireland!

    The problem is the "ideal conditions" bit. Try taking the Aircoach at peak times and you will see how long it can take.

    The 90 can often by much faster then the Luas, yet people squeeze onto the Luas. Why? because the advantage of rail is consistency and reliability.

    Because the Metro to the airport will take 25 minutes no matter what time of the day. While Aircoach can take 25 minutes to 60 minutes.

    And remember, the new plan for Dublin Metro will be to extend it to South of Dublin. For people along the Green line, the time to the airport will be vastly faster then taking Aircoach through the center of the city, pretty much any time of the day.

    And the story is the same for folks coming from Swords into the city. Sometimes the Swords Express is nice and fast, other times it will hit traffic and be horribly slow. Now add 40,000 extra people living in Swords and lots of infill development currently sprouting up all over North of Dublin and just watch what happens to those bus journey times!


  • Registered Users, Registered Users 2 Posts: 17,853 ✭✭✭✭Idbatterim


    And the story is the same for folks coming from Swords into the city. Sometimes the Swords Express is nice and fast, other times it will hit traffic and be horribly slow. Now add 40,000 extra people living in Swords and lots of infill development currently sprouting up all over North of Dublin and just watch what happens to those bus journey times!

    getting down the quays is an absolute joke. The public transport bridge over the liffey at SJRQ could hopefully make a big difference!


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    bk wrote: »
    No distortion! Building a full, dual bore, heavy rail tunnel is simply much more expensive then a standard Metro.

    I've no problem with DU as such, as the point is to integrate with the rest of the heavy rail network, so the increased cost is justified.

    But MN doesn't need to directly integrate with the heavy rail network ,it needs to integrate with the Luas network, so the idea of spending lots of extra money to make it heavy rail simply has no justification.
    What was it then? A joke? A random opinion? It seems you have a huge (and arguably irrational) problem with it when you glibly summed up as
    DU was to cost €4 Billion for just 7.6km of tunnel.
    7.6km of tunnel indeed... I mean, have you actually read the proposal docs or the Railway Order, the extensive prior surveying and reports or indeed took part in consultations beforehand?


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    7.6km of tunnel indeed... I mean, have you actually read the proposal docs or the Railway Order, the extensive prior surveying and reports or indeed took part in consultations beforehand?

    Yes I have!

    I'm honestly not sure what point you are making here! DU was going to be much more expensive then MN due to it's heavy rail nature and that is fine, it is what it is. But it's higher cost will also mean it is harder to get the go ahead from government.


  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    You have to bite the bullet. We have a disjointed but existing heavy rail network. It needs linking up to fully exploit its potential.

    We all know the real reason DU is stalled is because government is worried about IE controlling it.

    The solution is not to build a parallel metro, it's to grab Irish Rail by the scruff of the neck and reform/privatise day to day operations. The IE unions have held our infrastructure to ransom long enough.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Time for some proper investment in the second city.

    Galway now has no national primary artery entering the city that's not motorway standard for 25km (bar the obvious N6 Bothar na dTreabh but that's not a radial route). The investment in Cork needs to happen now after years and years of neglect


  • Moderators, Computer Games Moderators, Recreation & Hobbies Moderators Posts: 10,395 Mod ✭✭✭✭CatInABox


    bk wrote: »
    Yes I have!

    I'm honestly not sure what point you are making here! DU was going to be much more expensive then MN due to it's heavy rail nature and that is fine, it is what it is. But it's higher cost will also mean it is harder to get the go ahead from government.

    Honestly, by the time that DU is built, the price will be a fair bit lower, as they're currently building (or talking about building) projects that were once considered part of the overall project, but are now just separate projects. The Merrion Gates project is the prime example of this, but even the talk in Leo's plan there of further electrification is a further example.

    I'd guess that all these projects will be completed first, the grade separation of the lines, the electrification of those lines, services up and running, before the interconnector is proposed again. It'll be an easier sell to politicians as well, as it'll be cheaper, and the results will be instantly clearer, i.e. "We've already got the dart lines, let's connect them up now, etc"


  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    CatInABox wrote: »
    I'd guess that all these projects will be completed first, the grade separation of the lines, the electrification of those lines, services up and running, before the interconnector is proposed again. It'll be an easier sell to politicians as well, as it'll be cheaper, and the results will be instantly clearer, i.e. "We've already got the dart lines, let's connect them up now, etc"

    Yes, I agree completely, it will make the tunnel much easier to swallow.

    If you think about it, it is a bit like how they built the intercity motorway network. Had anyone said up front that it would all cost 8 billion, it would never have gotten off the ground. But instead they broke it down into lots of smaller projects and phases that were easier to sneak under the radar.

    Also by then Dublin Metro should be built and I expect a big success, which should also make the idea of another tunnel much easier. Just like Luas Cross City was accepted once the two original Luas lines proved themselves.


  • Registered Users Posts: 1,034 ✭✭✭riddlinrussell


    In terms of the metro and its tunnel is there some way to save money by 'storing' the TBM for it at a handy spot to get to work on the Dart Underground? I assume you'd want to have the DU route fully planned by then but is it reasonable to plan it that way? Then you'd surely save at least the cost of one of the machines, instead of saying 'Yeah we had one of those but we just buried it in a little side tunnel and we cant get it back, have to buy two more then!'


  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 22,984 Mod ✭✭✭✭bk


    In terms of the metro and its tunnel is there some way to save money by 'storing' the TBM for it at a handy spot to get to work on the Dart Underground? I assume you'd want to have the DU route fully planned by then but is it reasonable to plan it that way? Then you'd surely save at least the cost of one of the machines, instead of saying 'Yeah we had one of those but we just buried it in a little side tunnel and we cant get it back, have to buy two more then!'

    TBM's are very expensive piece of equipment. They aren't left there after the tunnel is built, they are removed and shipped to the next project (around the world). Also require major maintenance between jobs.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    bk wrote: »
    Yes I have!

    I'm honestly not sure what point you are making here! DU was going to be much more expensive then MN due to it's heavy rail nature and that is fine, it is what it is. But it's higher cost will also mean it is harder to get the go ahead from government.
    My point there was: the 4 billion cost is for FAR, FAR more than a twin-bore heavy rail tunnel of 7km. Well over a billion is towards the work described here, that electrifies the Dublin commuter network and gets rid of most level crossings. I appreciate your contributions in general, but you're way off the mark with the facts surrounding Dart future plans.

    Electrification to Maynooth and tackling level crossings and figuring out quad-tracking to Inchicore would go a very long way to helping the scheme, and helping sustainable commuting to Dublin in the meantime. Though I wouldn't electrify the northern line any further until triple-tracking can be achieved from Connolly to Clongriffin first.


  • Registered Users, Registered Users 2 Posts: 17,853 ✭✭✭✭Idbatterim


    My point there was: the 4 billion cost is for FAR, FAR more than a twin-bore heavy rail tunnel of 7km. Well over a billion is towards the work described here, that electrifies the Dublin commuter network and gets rid of most level crossings.
    the issue with level crossings is trains have to slow down approaching them I assume?


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,459 Mod ✭✭✭✭marno21


    Idbatterim wrote: »
    the issue with level crossings is trains have to slow down approaching them I assume?

    And level crossings reduce the number of trains per hour using that particular length of track


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    Idbatterim wrote: »
    the issue with level crossings is trains have to slow down approaching them I assume?
    I suspect there are different reasons given depending on who you ask, but they offer significant safety improvements, (often) speed improvements for both road users and trains, one less part of the rail network to break down, less congestion and delays for all road users including pedestrians, lower maintenance costs for the railway (typically) and the combination of all this improves reliability and therefore timeliness.

    Edit: I understood Irish Rail could close level crossings as they saw fit to allow whatever schedule they ran, but if they were constrained in how often they closed, then that is another huge advantage for crossing removal.


  • Registered Users, Registered Users 2 Posts: 19,031 ✭✭✭✭murphaph


    marno21 wrote: »
    And level crossings reduce the number of trains per hour using that particular length of track
    This is the reason. At a certain number of trains per hour the gates are just going to be permanently closed as there's a safety margin to observe.


  • Moderators, Science, Health & Environment Moderators Posts: 19,862 Mod ✭✭✭✭Sam Russell


    murphaph wrote: »
    This is the reason. At a certain number of trains per hour the gates are just going to be permanently closed as there's a safety margin to observe.

    At Sydney Parade the gates close 2 minutes before a south bound train and 3 minutes before a north bound train - and longer for diesels. So a 10 minute frequency could result in the gates closed fr up to 50% of the time - but at least 30% of the time. A 5 minute service would mean the gates may not open at all.

    There is no possibility of building an overpass or tunnel without huge cpo activity.

    The planned Merrion Gates project might render the Sydney Parade gates hardly needed, but the other gates in Sandymount and Landsdowne would have a similar problem.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 17,918 ✭✭✭✭LXFlyer


    Idbatterim wrote: »
    the issue with level crossings is trains have to slow down approaching them I assume?

    That's far from the main reason on a suburban railway.

    The main reason is the more trains you add to a schedule, the longer the gates will be closed to traffic - there is a limit to how long they can be shut.

    Where the gates are at a station they have to close when the train is approaching the station and is at the platform lest the train overshoots - that adds extra time.


  • Registered Users, Registered Users 2 Posts: 7,695 ✭✭✭Chivito550


    bk wrote: »
    Yes, I agree completely, it will make the tunnel much easier to swallow.

    If you think about it, it is a bit like how they built the intercity motorway network. Had anyone said up front that it would all cost 8 billion, it would never have gotten off the ground. But instead they broke it down into lots of smaller projects and phases that were easier to sneak under the radar.

    Also by then Dublin Metro should be built and I expect a big success, which should also make the idea of another tunnel much easier. Just like Luas Cross City was accepted once the two original Luas lines proved themselves.

    It's a poor reflection on us as people if this is how important infrastructure needs to be sold to us.


  • Banned (with Prison Access) Posts: 1,121 ✭✭✭ClovenHoof


    Muahahaha wrote: »
    It'll be a long time before the Metro gets to Sandyford.

    Dart Underground is the real game changer though, more so than the Metro to the airport imo.

    The metro does not only go to the airport. The green line is already metro ready.

    No way will CIE provide a decent sevice on DART Underground. Where are the ten min darts now ffs...


  • Registered Users, Registered Users 2 Posts: 13,946 ✭✭✭✭Zebra3


    http://m.independent.ie/business/budget/tax-cuts-are-number-one-priority-in-budget-say-fg-branches-36183314.html

    Small bit towards the end there of FG members wanting MN, and a couple of other projects.


  • Registered Users, Registered Users 2 Posts: 19,688 ✭✭✭✭Muahahaha


    LXFlyer wrote: »
    That's far from the main reason on a suburban railway.

    The main reason is the more trains you add to a schedule, the longer the gates will be closed to traffic - there is a limit to how long they can be shut.

    Where the gates are at a station they have to close when the train is approaching the station and is at the platform lest the train overshoots - that adds extra time.

    Just wondering is there a standard time that the gates need to be closed at level crossings? Recently I went over the Coolmine one and was waiting eight minutes in total for one train. It is an automated crossing so it seemed ridiculous for the gates being closed that long, I would have thought 2-3 minutes max. Any ideas what kind of technology is used, is it a case that the train triggers the gates when it is 1km away or does it need human oversight?


  • Registered Users, Registered Users 2 Posts: 17,918 ✭✭✭✭LXFlyer


    If it was an outbound train, the gates have to close well before the train arrives in the station, in case the train overshoots the platform. They need to be closed before the train enters the signalling section immediately before the level crossing - the Maynooth line hasn't been resignalled and the sections may be longer than elsewhere - hence the long wait.

    The crossings are controlled by a signaller using CCTV.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 19,688 ✭✭✭✭Muahahaha


    Thats interesting. What can make a train overshoot a platform, is it driver error or can the wheels slip on wet days? Is it less likely to happen on trains that are electrified or is the risk the same? Either way it certainly makes a good case for level crossings to be grade separated where possible.


  • Registered Users, Registered Users 2 Posts: 17,918 ✭✭✭✭LXFlyer


    Muahahaha wrote: »
    Thats interesting. What can make a train overshoot a platform, is it driver error or can the wheels slip on wet days? Is it less likely to happen on trains that are electrified or is the risk the same? Either way it certainly makes a good case for level crossings to be grade separated where possible.
    Either of the above reasons would apply.


    The railway works on the basis of safety first - hence you take protective action.


    No difference between degree of risk between diesel and electric trains.


  • Banned (with Prison Access) Posts: 1,142 ✭✭✭Middle Man


    FG Plan - there's a missing element that is essential:

    Combating NIMBYism!

    Today, Dublin's North Runway is being challenged in the High Court over the extended planning permission granted by Fingal Co. Co.

    The Field II
    Coming to an airport near you!


  • Registered Users, Registered Users 2 Posts: 1,310 ✭✭✭patrickbrophy18


    Middle Man wrote: »
    FG Plan - there's a missing element that is essential:

    Combating NIMBYism!

    Today, Dublin's North Runway is being challenged in the High Court over the extended planning permission granted by Fingal Co. Co.

    The Field II
    Coming to an airport near you!

    This is really typical in this country. It's an international airport with one of the busiest routes in Europe, Dublin to London. While poor waste management is unacceptable, it shouldn't be used as a basis for stalling what I would consider an infrastructure improvement with national importance. Don't get me wrong. The developers should make good of their waste management misgivings. However, it shouldn't cost Ireland's main Airport an extra runway given how busy it already is.


Advertisement