Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Proposed New Runway.

  • 07-04-2016 4:14pm
    #1
    Registered Users, Registered Users 2 Posts: 20,688 ✭✭✭✭


    No doubt I'm missing something but from what I hear on the wireless the new runway will cost 320 million and require 12 hundred to build.

    I appreciate land may be expensive but surely it's just a glorified roadway,where's the hundreds of millions going.
    Also 12 hundred to build the thing??


«1

Comments

  • Closed Accounts Posts: 1,488 ✭✭✭mahoganygas


    + car parks
    + hanagrs
    + Gate buildings
    + duty free buildings
    + maintenance buildings
    + car parks
    + Expanded ATC
    + Extra security

    I also wouldn't fancy landing a 500 ton 747 on a 'glorified roadway'.


  • Posts: 0 [Deleted User]


    320m to build, but how much will it make in added revenue?


  • Registered Users, Registered Users 2 Posts: 35,257 ✭✭✭✭Penn


    320m to build, but how much will it make in added revenue?

    More than that.


  • Registered Users, Registered Users 2 Posts: 11,797 ✭✭✭✭BattleCorp


    Do they also have to purchase the land too or do they already have this?


  • Registered Users, Registered Users 2 Posts: 28,715 ✭✭✭✭murpho999


    + car parks
    + hanagrs
    + Gate buildings
    + duty free buildings
    + maintenance buildings
    + car parks
    + Expanded ATC
    + Extra security

    I also wouldn't fancy landing a 500 ton 747 on a 'glorified roadway'.

    Don't agree with this at all. The cost is for a new runway.

    All the new infrastructure you are talking about is already there with the new terminal 2.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 18,721 ✭✭✭✭VinLieger


    In my opinion op doesn't have a clue, but what do I know?


  • Posts: 0 [Deleted User]


    If I run fast enough down the new runway, with my arms flapping, will I eventually take off?


  • Registered Users, Registered Users 2 Posts: 28,404 ✭✭✭✭vicwatson


    BattleCorp wrote: »
    Do they also have to purchase the land too or do they already have this?

    They already have it I assume as they have planning permission since 2007 (though not all the concessions they want), they wont build it unless they get what they want - likes of operating hours outside of 7am - 11pm, only 65 flights per day on it etc

    I thought planning only lasted 5 years but apparently they have 10 year planning?


  • Registered Users, Registered Users 2 Posts: 19,731 ✭✭✭✭Muahahaha


    I presume they have the land, they own an awful lot outside the perimeter AFAIK.

    €320m does sound an awful lot. Motorways here cost around €8m per km and I'd imagine the runway needs to be 3km in length with a 3km taxiway alongside it. Maybe 10km in total all up? I know motorways are not directly comparable but surely the physical runway could be built for €100m and then perhaps double that for all the lighting, new radars, etc

    I haven't read anything that says the €320m figure includes new terminals or a new air traffic control. All they mention is the €320m new runway. The articles on it aren't very clear of what exactly the €320m will get


  • Registered Users, Registered Users 2 Posts: 41,220 ✭✭✭✭Annasopra


    kneemos wrote: »
    No doubt I'm missing something but from what I hear on the wireless the new runway will cost 320 million and require 12 hundred to build.

    I appreciate land may be expensive but surely it's just a glorified roadway,where's the hundreds of millions going.
    Also 12 hundred to build the thing??

    12 hundred what?

    It was so much easier to blame it on Them. It was bleakly depressing to think that They were Us. If it was Them, then nothing was anyone's fault. If it was us, what did that make Me? After all, I'm one of Us. I must be. I've certainly never thought of myself as one of Them. No one ever thinks of themselves as one of Them. We're always one of Us. It's Them that do the bad things.

    Terry Pratchet



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 28,404 ✭✭✭✭vicwatson


    12 hundred what?

    Yen


  • Registered Users, Registered Users 2 Posts: 41,220 ✭✭✭✭Annasopra


    vicwatson wrote: »
    Yen

    The first post doesn't make sense 320 million cost and 12 hundred x

    It was so much easier to blame it on Them. It was bleakly depressing to think that They were Us. If it was Them, then nothing was anyone's fault. If it was us, what did that make Me? After all, I'm one of Us. I must be. I've certainly never thought of myself as one of Them. No one ever thinks of themselves as one of Them. We're always one of Us. It's Them that do the bad things.

    Terry Pratchet



  • Registered Users, Registered Users 2 Posts: 11,690 ✭✭✭✭Skylinehead


    12 hundred what?
    People I think.

    Hardly euros :pac:


  • Registered Users, Registered Users 2 Posts: 28,404 ✭✭✭✭vicwatson


    On the Matt Cooper show now, that CEO of Dublin Airport sounds like a right, (s)nob


  • Registered Users, Registered Users 2 Posts: 10,398 ✭✭✭✭Birneybau


    Where's that question thread again?


  • Registered Users, Registered Users 2 Posts: 28,404 ✭✭✭✭vicwatson


    The first post doesn't make sense 320 million cost and 12 hundred x

    Jobs;)


  • Registered Users, Registered Users 2 Posts: 20,688 ✭✭✭✭kneemos


    The first post doesn't make sense 320 million cost and 12 hundred x


    Humans.


  • Registered Users, Registered Users 2 Posts: 20,688 ✭✭✭✭kneemos


    There must be some ancillary stuff included,no way it would take 12 hundred to build a runway


  • Closed Accounts Posts: 3,950 ✭✭✭Mesrine65


    Jaysus the traveller lads will tarmacadam the lot for a fraction of the cost :D


  • Registered Users, Registered Users 2 Posts: 5,455 ✭✭✭maudgonner


    Mesrine65 wrote: »
    Jaysus the traveller lads will tarmacadam the lot for a fraction of the cost :D

    And sort out a hape of new gates for the departure area.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,681 ✭✭✭frozenfrozen


    they'd be iron gates.. which went missing from the house down the road the previous week


  • Moderators, Education Moderators, Sports Moderators Posts: 11,234 Mod ✭✭✭✭artanevilla


    Runways are built to a much higher standard than road. There's lots of radio equipment to be added in for landing guidance etc.

    Surveying needs to be exact as well, you can't be off by a couple of inches when it comes to aircraft.

    Lights, drainage, certification etc....


  • Banned (with Prison Access) Posts: 84 ✭✭Goat Paddock


    Just read through this please and then you can question the costs:

    http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC-150-5370-10G-updated-201507.pdf


  • Registered Users, Registered Users 2 Posts: 20,688 ✭✭✭✭kneemos


    Just read through this please and then you can question the costs:

    http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC-150-5370-10G-updated-201507.pdf



    All 662 pages?
    I know they need stuff to build it,just wondering how it costs 320 million.


  • Registered Users, Registered Users 2 Posts: 1,330 ✭✭✭readytosnap


    Yosser cud do dat.


  • Moderators, Education Moderators, Music Moderators Posts: 10,686 Mod ✭✭✭✭melekalikimaka


    kneemos wrote: »
    All 662 pages?
    I know they need stuff to build it,just wondering how it costs 320 million.

    you asked a question, he gave you the answer. Read and thou shall be enlightened


  • Registered Users, Registered Users 2 Posts: 11,810 ✭✭✭✭For Forks Sake


    kneemos wrote: »
    All 662 pages?
    I know they need stuff to build it,just wondering how it costs 320 million.

    Bargain compared to the estimated £19 billion (no, that's not a typo) that it'll cost to build the new runway in Heathrow

    http://www.bbc.com/news/uk-19570653


  • Closed Accounts Posts: 1,077 ✭✭✭Oasis1974


    Runways are built to a much higher standard than road. There's lots of radio equipment to be added in for landing guidance etc.

    Surveying needs to be exact as well, you can't be off by a couple of inches when it comes to aircraft.

    Lights, drainage, certification etc....
    Would never have known that....No potholes likely then?


  • Registered Users, Registered Users 2 Posts: 4,292 ✭✭✭bigroad


    600million for terminal 2
    320million for a new runway.
    A big shed and a wide road 3km in length with extra hardcore total bill 920 million.
    That's the DAA skys the limit,why because they can.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 20,688 ✭✭✭✭kneemos


    Bargain compared to the estimated £19 billion (no, that's not a typo) that it'll cost to build the new runway in Heathrow

    http://www.bbc.com/news/uk-19570653


    The construction will provide 60,000 jobs.

    There's obviously more going on with these things than just a runway.


  • Registered Users, Registered Users 2 Posts: 29,293 ✭✭✭✭Mint Sauce


    kneemos wrote: »
    No doubt I'm missing something but from what I hear on the wireless the new runway will cost 320 million and require 12 hundred to build.

    I appreciate land may be expensive but surely it's just a glorified roadway,where's the hundreds of millions going.
    Also 12 hundred to build the thing??


    Not that I know much about runway construction, but even on the best roads in the country, I wouldn't fancy being in an Airbus or Boeing landing on one. Even before you add all the communication and lighting, I would say its foundations,would be a little different to that of the M50.

    Am actually slightly surprised at it my self, Heathrow cant even get a second runway despite handling way more landing and takeoffs, and passenger numbers, and Gatwick the same manages fine on just one.

    Maybe if the DAA gave some of the money towards getting a new rail link to the Airport, that might be money better well spent.


  • Closed Accounts Posts: 1,077 ✭✭✭Oasis1974


    Mint Sauce wrote: »
    Not that I know much about runway construction, but even on the best roads in the country, I wouldn't fancy being in an Airbus or Boeing landing on one. Even before you add all the communication and lighting, I would say its foundations,would be a little different to that of the M50.

    Am actually slightly surprised at it my self, Heathrow cant even get a second runway despite handling way more landing and takeoffs, and passenger numbers, and Gatwick the same manages fine on just one.

    Maybe if the DAA gave some of the money towards getting a new rail link to the Airport, that might be money better well spent.
    Think you mean a third runway for Heathrow and both these airports are close to operating capacity.


  • Registered Users, Registered Users 2 Posts: 733 ✭✭✭tigerboon


    The runway itself will be about 60m wide so that's the same as 9km of dual carriageway. Deeper foundations, concrete base maybe, deeper asphalt as well as a higher spec asphalt. There are hundreds of ground lights which are more than just bulbs. To operate these lights a high spec computer system is needed as well as a hell of a lot of ducting and cabling. There could be a couple of hundred km (yes km) of cable needed. This lighting system all needs to be backed up in case of failure. The drainage system needs to be able to take the run off from a huge area of runway. Signage boards are also needed. To be able to use the whole thing a network of taxiways, with all of the above features, is also needed. Add to all this the public consultation, design etc.


  • Closed Accounts Posts: 1,915 ✭✭✭The flying mouse


    Don't know why people just can't get the boat...back in my day.....


  • Registered Users, Registered Users 2 Posts: 4,292 ✭✭✭bigroad


    Just let Mic O Leary build his own airport and save us all a load of cash.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 41,220 ✭✭✭✭Annasopra


    kneemos wrote: »
    There must be some ancillary stuff included,no way it would take 12 hundred to build a runway

    12 hundred what?

    It was so much easier to blame it on Them. It was bleakly depressing to think that They were Us. If it was Them, then nothing was anyone's fault. If it was us, what did that make Me? After all, I'm one of Us. I must be. I've certainly never thought of myself as one of Them. No one ever thinks of themselves as one of Them. We're always one of Us. It's Them that do the bad things.

    Terry Pratchet



  • Closed Accounts Posts: 1,915 ✭✭✭The flying mouse


    12 hundred what?

    OP meant to say one thousand two hundred ;)


  • Registered Users, Registered Users 2 Posts: 1,504 ✭✭✭NiallBoo


    12 hundred what?

    Just a guess, but is it new permanent jobs created because of the expansion?

    (Airport people, not temporary construction jobs)


  • Closed Accounts Posts: 24,465 ✭✭✭✭darkpagandeath


    Clarification, This is just for a new runway yes as the infrastructure was already upgraded ?


  • Registered Users, Registered Users 2 Posts: 11,810 ✭✭✭✭For Forks Sake


    kneemos wrote: »
    The construction will provide 60,000 jobs.

    There's obviously more going on with these things than just a runway.

    Main difference being (afaik) that Heathrow are going to have to buy a lot of land/housing whereas Dublin already own the land to the north of the airport where the new runway is going.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 21,530 ✭✭✭✭Alun


    tigerboon wrote: »
    There are hundreds of ground lights which are more than just bulbs. To operate these lights a high spec computer system is needed as well as a hell of a lot of ducting and cabling. There could be a couple of hundred km (yes km) of cable needed. This lighting system all needs to be backed up in case of failure.
    I briefly worked on an upgrade of the computer system for Schiphol's lighting system some time back in the 80's or 90's I think it was. As with most things in this world, once you get into the nitty gritty of it, they're a lot more complex than the average man on the street would believe.


  • Registered Users, Registered Users 2 Posts: 11,580 ✭✭✭✭salmocab


    Alun wrote: »
    I briefly worked on an upgrade of the computer system for Schiphol's lighting system some time back in the 80's or 90's I think it was. As with most things in this world, once you get into the nitty gritty of it, they're a lot more complex than the average man on the street would believe.

    There could be call for new ESB sub station too, the lighting systems would be massive and between generator back ups and I presume a UPS along with a computer system to run it electrical systems will cost in the millions to supply and install alone.

    Also comparing it to a road way is crazy the m50 has at worst things weighing a few ton driving across it and a runway has things weighing hundreds of tons bouncing down out of the sky onto it


  • Registered Users, Registered Users 2 Posts: 35,257 ✭✭✭✭Penn


    vicwatson wrote: »
    They already have it I assume as they have planning permission since 2007 (though not all the concessions they want), they wont build it unless they get what they want - likes of operating hours outside of 7am - 11pm, only 65 flights per day on it etc

    I thought planning only lasted 5 years but apparently they have 10 year planning?

    Before the 5 years are up you can apply for an extension of duration of planning permission for up to another 5 years.


  • Registered Users, Registered Users 2 Posts: 43,037 ✭✭✭✭SEPT 23 1989


    I sure there is some sort of endangered snail or slug that will lead to massive cost overruns and time delays


  • Registered Users, Registered Users 2 Posts: 75 ✭✭webwayz


    New runway, why not build the tunnel/cut and fill for the metro line and station while you're at it.
    Dublin needs a new runway no doubt if it is to grow and expand, better to build it, and keep the green belt in north Dublin, and not build in the flight path.


  • Registered Users, Registered Users 2 Posts: 6,488 ✭✭✭Archeron


    12 hundred what?

    Battle ready war elephants.


  • Registered Users, Registered Users 2 Posts: 683 ✭✭✭gumbo1


    murpho999 wrote: »
    All the new infrastructure you are talking about is already there with the new terminal 2.

    No it's not. The proposed runway is on the opposite side of the airfield. It would mean massive refurbishment of the existing tarmac that's there and a lot of the taxiways would need to be made bigger to accommodate the larger aircraft!


  • Registered Users, Registered Users 2 Posts: 41,220 ✭✭✭✭Annasopra


    Archeron wrote: »
    Battle ready war elephants.

    Deadly

    It was so much easier to blame it on Them. It was bleakly depressing to think that They were Us. If it was Them, then nothing was anyone's fault. If it was us, what did that make Me? After all, I'm one of Us. I must be. I've certainly never thought of myself as one of Them. No one ever thinks of themselves as one of Them. We're always one of Us. It's Them that do the bad things.

    Terry Pratchet



  • Banned (with Prison Access) Posts: 84 ✭✭Goat Paddock


    I sure there is some sort of endangered snail or slug that will lead to massive cost overruns and time delays

    Snails and slugs have just as much rights to be here as us, how would you feel if your neighbourhood was demolished to make way for a snail trail. The analogy is clear.


  • Posts: 17,378 ✭✭✭✭ [Deleted User]


    If the EU were still building our infrastructure, I doubt anyone would care.


  • Advertisement
Advertisement