Cost of slatted tank per bay?

  • 11-04-2013 05:27PM
    #1
    Registered Users, Registered Users 2 Posts: 349 ✭✭


    I am building a 4 bay slatted tank within an existing building. Any idea of cost per bay these days? Accommodation for 14 cubicles with a moving barrier. Using existing walls & roof. So just interested in the tank cost?


«134

Comments

  • Closed Accounts Posts: 179 ✭✭Massey10


    dungfly wrote: »
    I am building a 4 bay slatted tank within an existing building. Any idea of cost per bay these days? Accommodation for 14 cubicles with a moving barrier. Using existing walls & roof. So just interested in the tank cost?
    i put in 67'x12x9 last year about 13k plus vat plus digging.


  • Closed Accounts Posts: 1,363 ✭✭✭Juniorhurler


    73 x 12'6 x 8 going in here at the moment. Will cost 13k as well with slats on. That included digging and the man is not vat registered so a bit of vat to come back on materials from that.


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    will be shot but .... I converted a long hayshed years ago. 4" block on flat and plastered it

    laid approx 200 blocks each night after work and got a proper plasterer to plaster it

    cheap job at the time, was just after getting the place and was skint ... hasn't leaked and its up about 15 years at this stage


  • Closed Accounts Posts: 2,485 ✭✭✭sh1tstirrer


    will be shot but .... I converted a long hayshed years ago. 4" block on flat and plastered it

    laid approx 200 blocks each night after work and got a proper plasterer to plaster it

    cheap job at the time, was just after getting the place and was skint ... hasn't leaked and its up about 15 years at this stage
    how deep is the tank? If it is over 5 foot deep it was built with one block on edge and one block flat. That way you have a 12" wide wall.


  • Registered Users, Registered Users 2 Posts: 3,082 ✭✭✭td5man


    dungfly wrote: »
    I am building a 4 bay slatted tank within an existing building. Any idea of cost per bay these days? Accommodation for 14 cubicles with a moving barrier. Using existing walls & roof. So just interested in the tank cost?

    AFAIK €250-300 a foot tank and slats not sure if that includes vat


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    how deep is the tank? If it is over 5 foot deep it was built with one block on edge and one block flat. That way you have a 12" wide wall.

    8ft .... have 3 high on edge , then i cased a 10" wide, 12" high reinforced wall on top of that, finished off with blocks on flat. It was a long baby so I split the tank
    in the middle .... maybe overkill, It was a lot of work at the time ...

    The thing to watch with converting existing sheds is that the slats
    can end up starting out a lot from the back walls, not a problem if you make them into the creep area. One mistake i made was leaving the creep too flat.
    Am going fixing that this year though as getting to old for this forking :)


  • Registered Users, Registered Users 2 Posts: 6,326 ✭✭✭Farmer Pudsey


    will be shot but .... I converted a long hayshed years ago. 4" block on flat and plastered it

    laid approx 200 blocks each night after work and got a proper plasterer to plaster it

    cheap job at the time, was just after getting the place and was skint ... hasn't leaked and its up about 15 years at this stage

    I have heard of more than one tank build with block that has had no issue's. Believe it or not in most cases it is water leaking that is an issue rather than slurry going out. If there is no water coming in then the slurry will seal the sides of the tank in a few years. This is what happens in England and Scotland where they build Lagoons without liners abeit in a much dryer climate.

    If water leaks in it the leakage point will get larger over time ergo more water and over time slurry will get out. However if the other way around slurry will actually seal the hole and the side of the walls.

    The main reason for the agri specs is to prevent structural faults in tank. Often if a tank is in a dry are where weight bearing against walls will be minimal the actual structural strenght of a tank would not need to be of the agri specifications. However if not laying the blocks yourself there is little or no savings between Block or mass concerete. That is why on sidewall very few farmers use Block unless they can lay them themselves.


  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    The other side of it is that I have seen a block tank leak. It was an overground 6ft tank and the farmer put a pit of silage up against the tank wall. The whole pit of silage was contaminated with slurry effluent which seeped through the wall. He had to get a digger to empty the tank. That was 10 years ago. The tank is still being used, it's still seeping a little bit, but it runs off into another tank lower than it. It hasn't sealed itself yet - how long should it take?
    I have heard of more than one tank build with block that has had no issue's. Believe it or not in most cases it is water leaking that is an issue rather than slurry going out. If there is no water coming in then the slurry will seal the sides of the tank in a few years. This is what happens in England and Scotland where they build Lagoons without liners abeit in a much dryer climate.

    If water leaks in it the leakage point will get larger over time ergo more water and over time slurry will get out. However if the other way around slurry will actually seal the hole and the side of the walls.

    The main reason for the agri specs is to prevent structural faults in tank. Often if a tank is in a dry are where weight bearing against walls will be minimal the actual structural strenght of a tank would not need to be of the agri specifications. However if not laying the blocks yourself there is little or no savings between Block or mass concerete. That is why on sidewall very few farmers use Block unless they can lay them themselves.


  • Closed Accounts Posts: 2,485 ✭✭✭sh1tstirrer


    reilig wrote: »
    The other side of it is that I have seen a block tank leak. It was an overground 6ft tank and the farmer put a pit of silage up against the tank wall. The whole pit of silage was contaminated with slurry effluent which seeped through the wall. He had to get a digger to empty the tank. That was 10 years ago. The tank is still being used, it's still seeping a little bit, but it runs off into another tank lower than it. It hasn't sealed itself yet - how long should it take?
    An overground block tank, that's asking for trouble. There will be no reinforcing unlilke the underground tank.


  • Registered Users, Registered Users 2 Posts: 6,326 ✭✭✭Farmer Pudsey


    reilig wrote: »
    The other side of it is that I have seen a block tank leak. It was an overground 6ft tank and the farmer put a pit of silage up against the tank wall. The whole pit of silage was contaminated with slurry effluent which seeped through the wall. He had to get a digger to empty the tank. That was 10 years ago. The tank is still being used, it's still seeping a little bit, but it runs off into another tank lower than it. It hasn't sealed itself yet - how long should it take?

    I wonder was it the silage or rain water that broke the barrier from outside. Also as over ground it would be suspectible to frost damage. Under fround this would not be an issue. I be slow allowing silage effluent into them also.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,731 ✭✭✭lakill Farm


    8ft .... have 3 high on edge , then i cased a 10" wide, 12" high reinforced wall on top of that, finished off with blocks on flat. It was a long baby so I split the tank
    in the middle .... maybe overkill, It was a lot of work at the time ...

    The thing to watch with converting existing sheds is that the slats
    can end up starting out a lot from the back walls, not a problem if you make them into the creep area. One mistake i made was leaving the creep too flat.
    Am going fixing that this year though as getting to old for this forking :)


    Explain that to me again :rolleyes: please. :D

    what way are the blocks?


  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    I wonder was it the silage or rain water that broke the barrier from outside. Also as over ground it would be suspectible to frost damage. Under fround this would not be an issue. I be slow allowing silage effluent into them also.

    Slurry effluent, not silage effluent.

    Frost would penetrate the top rows of a block tank underground also. It is possible that the effluent from the silage pit penetrated from outside. It's even more possible that the builder skimped on the mortar, failed to waterproof the plaster, or didn't apply enough coats or thick enough of coats of plaster - This could happen with any block tank and highlights the importance of quality control.


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    |____
    |____|
    |____|__
    |____| |
    |____|_|
    | |____|
    |_|____|
    |____| |
    |____|_|


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    looked better in real life i promise :)


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    reilig wrote: »
    Slurry effluent, not silage effluent.

    Frost would penetrate the top rows of a block tank underground also. It is possible that the effluent from the silage pit penetrated from outside. It's even more possible that the builder skimped on the mortar, failed to waterproof the plaster, or didn't apply enough coats or thick enough of coats of plaster - This could happen with any block tank and highlights the importance of quality control.

    frost dosen't penetrate .... water expands when below -1

    how do you water proof plaster???????


  • Closed Accounts Posts: 4,552 ✭✭✭pakalasa


    From S. 123 Departments spec on re-inforced tanks.

    1.1 Blockwork Tanks and Channels

    Tanks, and channels,not more than 1.2m in depth, may be constructed with 225mm solid concreteblocks. Any such block wall longer than10m shall incorporate [at max. 10m intervals] a 450 x 450mm pillar extended onthe outer face of the wall. Walls shallbe plastered both sides to a thickness of 12mm. [3:1 washed sand/cement withplasticiser incorporated]. No tank orchannel in contact with silage effluent shall be constructed of blockwork. All blockwork tanks and channels shall becoated on the inside with a proprietary acid resistant bitumastic coating.


  • Registered Users, Registered Users 2 Posts: 6,326 ✭✭✭Farmer Pudsey


    reilig wrote: »
    Slurry effluent, not silage effluent.

    Frost would penetrate the top rows of a block tank underground also. It is possible that the effluent from the silage pit penetrated from outside. It's even more possible that the builder skimped on the mortar, failed to waterproof the plaster, or didn't apply enough coats or thick enough of coats of plaster - This could happen with any block tank and highlights the importance of quality control.

    The silage was up against the wall of the tank. speck for silage walls is quite high for two issue one is silage effluent in the silage itself which could stick to wall and damage plaster and morter, second he could have damaged joints while compacting silage.

    Only in years where we hot very hard frost 2009/10 and 2010/2011 would we have an issue with it penetrating below ground. Even then slats are above tank and there is usually a concrete apron in front over tank and usually a lie back on the shed. An overground block tank is a total different kettle of fish. It is also suspectible to rain damage and would be always damp because of this


  • Registered Users, Registered Users 2 Posts: 349 ✭✭dungfly


    Any ideas regards a moving barrier and slat mats in a barn conversion?


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer




  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    frost dosen't penetrate .... water expands when below -1

    how do you water proof plaster???????

    Yes, and if the water freezes, it expands and causes cracks and the frost is said to have penetrated.

    Plaster can be water proofed by adding a waterproofer or plasticiser to the mix when mixing the mortar.


  • Advertisement
  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    The silage was up against the wall of the tank. speck for silage walls is quite high for two issue one is silage effluent in the silage itself which could stick to wall and damage plaster and morter, second he could have damaged joints while compacting silage.

    Only in years where we hot very hard frost 2009/10 and 2010/2011 would we have an issue with it penetrating below ground. Even then slats are above tank and there is usually a concrete apron in front over tank and usually a lie back on the shed. An overground block tank is a total different kettle of fish. It is also suspectible to rain damage and would be always damp because of this

    I'm not saying that it wasn't the silage. He doesn't think it was as he always ran a cover between the walls and the silage, but the slurry pushed through the cover and contaminated the pit. In simple terms, he would have had a much more reliable job and a longer life job if he had poured his tank.

    It's that simple. Savings made by building a block tank over a poured tank are negated by the risk and longevity of the tank. It's certainly something that no engineer would recommend!


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    Plasticizer makes plaster more workable and easier to render .... it does not have any water proofing characteristics


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    reilig wrote: »
    I'm not saying that it wasn't the silage. He doesn't think it was as he always ran a cover between the walls and the silage, but the slurry pushed through the cover and contaminated the pit. In simple terms, he would have had a much more reliable job and a longer life job if he had poured his tank.

    It's that simple. Savings made by building a block tank over a poured tank are negated by the risk and longevity of the tank. It's certainly something that no engineer would recommend!

    An engineers objective is to cover his own @ss 100% .... not to save you money.


  • Registered Users, Registered Users 2 Posts: 155 ✭✭weekendfarmer


    To some up in case lads are converting sheds.

    Listen to people like pakalasa who quotes and referenec Departments specs


  • Closed Accounts Posts: 179 ✭✭Massey10


    |____
    |____|
    |____|__
    |____| |
    |____|_|
    | |____|
    |_|____|
    |____| |
    |____|_|
    Why not a foundation block 12" wide . Ive seen them used in a good few tanks.


  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    To some up in case lads are converting sheds.

    Listen to people like pakalasa who quotes and referenec Departments specs

    Water proofer for mortar

    http://www.watco.ie/sbr-waterproof-additive.html
    SBR Waterproof Additive
    Improves the adhesion, strength, water resistance and durability of cement mortars

    Plasticiser as opposed to Plasticizer

    One of the most popular brands in the country Durabond. Here's the data sheet:

    http://www.mcl.ie/datasheets/waterproofer_plasticiser.htm

    The first lines say:
    Durabond Waterproofer and Plasticiser is a concentrated admixture for cement mixes to reduce water permeability and entrain air. It can be used in concrete, renders and mortar to reduce the passage of moisture and suction. It is especially useful in rendering and dry dashing where it is important to prevent too much suction in backing coats.

    I would appreciate it if you would change your post which says that I do not know what I'm talking about. In fact you even quoted me wrong when you tried to quote me.


  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    An engineers objective is to cover his own @ss 100% .... not to save you money.

    So you think that the Department Specs are not approved by an engineer?

    An engineer's objective is to design or approve a structure which has been proven to witstand any forces placed on it. Block tanks have not been proven to do this, therefore an engineer won't approve it.

    You could save money by having a clay lined tank which may or may not cause pollution.


  • Registered Users, Registered Users 2 Posts: 6,326 ✭✭✭Farmer Pudsey


    There are waterproofers for Plaster. These are not plasticisers. There are also water proofers that you apply with a brush. However these are designed to allow water to run off side of wall. Very few prevent dampness where water is in contact all the time with plaster. This would be the case if he lined the plaster with plastic before putting silage aginst it. If silage was bad due to slurry it is unlikly that it came through plastic. He may have used an old silage cover in which case water going down between wall and plastic would also be an issue.

    In the case of an overhead tank you would have to plaster inside and outside. Again like laying blocks unless you do it your self it would negate cost comparrison between mass concrete and block wall. You would also need to put on at least one sctrach and maybe two scratch coats and then a plaster finish coat and ideally sponge all. The finiancal saving of an overhead block tank would be minimal as opposed to an underground one and a lot more risky due to weather damage.

    The savings are if you can do the labour self. My own choice woul always be a mass concrete wall as I would not have the time or skill level to lay blocks.


  • Closed Accounts Posts: 7,401 ✭✭✭reilig


    I have some experience with paint on PVA waterproofers, but they wouldn't have industrial strength. The idea of a plasticiser or waterproofer mixed with mortar is to prevent the mortar/plaster from soaking water into it. It makes plaster easy to work with by not allowing the moisture in the plaster to be soaked into dry block work - This stops it from drying too soon and makes it easier to work with, as well as allowing you to work with it for longer. It reduces the permiability of the plaster or mortar when it is first laid or when it is dry and therefore acts as a waterproofer preventing for example, the blocks on a house wall from soaking rain through the outside plaster of a house. It ultimately helps to negate dampness in houses as well as frost damage to the plaster on houses and would have a similar impact if it was used in the mortar used to build blocks in a tank or in the plaster used to plaster the blocks or a tank.

    Wall was plastered inside and out. Plastic on the sides was new.
    In speaking to him over the weekend, his opinion was that the dry silage put into the pit when it happened absorbed the moisture from the tank through the blocks, plaster and all. It was possible that the plastic lining got torn during the making of the pit. Weather was not a factor in the damage as all of the area was roofed.

    I would be of the same opinion to yourself towards the block tanks. When you count the time it would take to build the thousands of blocks required, a poured wall could work out even cheaper.
    There are waterproofers for Plaster. These are not plasticisers. There are also water proofers that you apply with a brush. However these are designed to allow water to run off side of wall. Very few prevent dampness where water is in contact all the time with plaster. This would be the case if he lined the plaster with plastic before putting silage aginst it. If silage was bad due to slurry it is unlikly that it came through plastic. He may have used an old silage cover in which case water going down between wall and plastic would also be an issue.

    In the case of an overhead tank you would have to plaster inside and outside. Again like laying blocks unless you do it your self it would negate cost comparrison between mass concrete and block wall. You would also need to put on at least one sctrach and maybe two scratch coats and then a plaster finish coat and ideally sponge all. The finiancal saving of an overhead block tank would be minimal as opposed to an underground one and a lot more risky due to weather damage.

    The savings are if you can do the labour self. My own choice woul always be a mass concrete wall as I would not have the time or skill level to lay blocks.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 6,326 ✭✭✭Farmer Pudsey


    reilig wrote: »
    So you think that the Department Specs are not approved by an engineer?

    An engineer's objective is to design or approve a structure which has been proven to witstand any forces placed on it. Block tanks have not been proven to do this, therefore an engineer won't approve it.

    You could save money by having a clay lined tank which may or may not cause pollution.

    An engineer objective in specing anything is not to lose his professional indemnity insurance for his work. I was once told that if he has two claims that he cannot get insurance again and has to work under supervision i.e. he cannot work as a sole trader.

    So when he specs anything he calculateswhat strenght it needs to be. When he has arrived at this spec he adds 50% to it and then double the whole [EMAIL="f@@King"]f@@King[/EMAIL] thing to be sure to be sure.:D:D

    On dept of agri specs a lot is to do with the dept trying to allow for what happens on the ground such as contractors adding water etc