Advertisement
Help Keep Boards Alive. Support us by going ad free today. See here: https://subscriptions.boards.ie/.
If we do not hit our goal we will be forced to close the site.

Current status: https://keepboardsalive.com/

Annual subs are best for most impact. If you are still undecided on going Ad Free - you can also donate using the Paypal Donate option. All contribution helps. Thank you.
https://www.boards.ie/group/1878-subscribers-forum

Private Group for paid up members of Boards.ie. Join the club.
Hi all, please see this major site announcement: https://www.boards.ie/discussion/2058427594/boards-ie-2026

Galway Commuter Rail: Galway-Athenry

12346»

Comments

  • Registered Users, Registered Users 2 Posts: 14,782 ✭✭✭✭Geuze


    Thanks.

    So it may not look like this:

    Passing_loop.png


  • Registered Users, Registered Users 2, Paid Member Posts: 2,978 ✭✭✭KrisW1001


    Sounds like it’s more like this:

    image.png


  • Registered Users, Registered Users 2, Paid Member Posts: 19,312 ✭✭✭✭LXFlyer


    Only one set of points would be there where the siding is - not a reverse set out of the siding.

    Loops are signalled bi-directionally so no need for the second set of points.

    It’s common at virtually every passing loop along the single track lines.

    It allows for a train to be stored offline (be it a per way train or a failure).



  • Registered Users, Registered Users 2 Posts: 14,782 ✭✭✭✭Geuze


    Okay, thanks.

    I have seen a cul-de-sac siding in Athenry alongside the car park, that is only accessible from the Limerick branch, and I was wondering about that.

    Maybe it has a similar purpose.



  • Registered Users, Registered Users 2 Posts: 14,782 ✭✭✭✭Geuze


    This seems to imply that a train could start from Oranmore in the morning, as in be parked there overnight in the siding, driver walks into station, revs her up, and the train starts from there?



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 14,782 ✭✭✭✭Geuze


    The passing loop got planning permission today.



  • Registered Users, Registered Users 2 Posts: 1,695 ✭✭✭p_haugh


    By the looks of it, just the bog standard conditions attached as well so that's good to see.



  • Moderators, Science, Health & Environment Moderators Posts: 5,547 Mod ✭✭✭✭spacetweek


    Am I right in saying it took just over 5 months?



  • Registered Users, Registered Users 2 Posts: 2,651 ✭✭✭cooperguy




  • Registered Users, Registered Users 2 Posts: 1,529 ✭✭✭bikeman1


    There is one other important signalling aspect for these headhunts / sidings at the end of a loop.

    With signalling you have a “overlap”, this means that in the event of a train passing the signal at danger, it goes into the section of the train coming the other way. Having a siding, means the overlap goes into that siding.

    This means that you can bring a train in faster than when it is not there and bring the one coming the other way closer to the station / crossing point. All in all it improves efficiency.

    Similar ( but different) scenarios happen at various locations on the network.



  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,547 Mod ✭✭✭✭spacetweek


    Is that underpass wide enough for 2 tracks?



  • Registered Users, Registered Users 2, Paid Member Posts: 2,978 ✭✭✭KrisW1001


    Yes. The project includes 1 km of dual track at the station, in addition to the second platform to the north of the original track.

    Summary here: Iarnród Éireann Projects and Investments



  • Registered Users, Registered Users 2 Posts: 3,824 ✭✭✭hans aus dtschl


    And if yes, maybe it would have made sense not to centre the existing track over the underpass. Still, very impressive job.



  • Registered Users, Registered Users 2, Paid Member Posts: 2,978 ✭✭✭KrisW1001


    It’s not centred, although it does run slightly further north than it should.

    I suspect there’s a chicken-and-egg situation here: the track has to be doubled, but building the underpass should be done first, to reduce the amount of track that needs to be re-laid later in the project. But, the way the existing track approaches the station means it doesn’t neatly line up on its “proper” side of the bridge. Of course, you could fix that by re-aligning the track, but that means closing the line for longer as you’re lifting more track, and it’s also likely that doing this would require work that won’t be done until the doubling part of the project is started. But: the track doubling task must follow the underpass being put in place.

    So, to break the cycle, you put the underpass in place with the track as-is, then come back and re-align it as part of the doubling.



  • Moderators, Science, Health & Environment Moderators Posts: 5,547 Mod ✭✭✭✭spacetweek


    Are we really waiting over two years for planning permission for the passing loop to be granted?



  • Registered Users, Registered Users 2 Posts: 831 ✭✭✭loco_scolo


    Plans were first announced in February 2019. Completion is now expected in the summer of 2027. So 8.5years.

    Over EIGHT years for a passing loop and second platform, at a station surrounded by green fields. Not a single home constructed around this station since it opened 12 years ago.

    This should be a case study of everything that is wrong in this country right now. It's actually embarrassing.



  • Registered Users, Registered Users 2 Posts: 4,519 ✭✭✭goingnowhere


    What interesting is how fast Irish Rail got moving once approved.

    The issue isn't really planning, its the byzantine nature of approvals with the DoT, NTA etc, for some reason everything happens serially not in parallel



  • Registered Users, Registered Users 2 Posts: 14,782 ✭✭✭✭Geuze


    The long delays were before the planning application and approval.

    2019 = Passing loop first mentioned, by my records

    2020 Sep = this thread starts

    2024 Sep = actual planning application to two LA for 820m passing loop

    2025 Feb = PP granted by two LA

    2025 Oct = underpass built

    2026 = construction due to start on main project



  • Moderators, Science, Health & Environment Moderators Posts: 5,547 Mod ✭✭✭✭spacetweek


    Sorry everyone, Sep 2024 is only 1 year ago not 2. Also I didn't know permission had been granted in Feb 2025.