M11/N30 - Gorey to Enniscorthy [open to traffic]

1333436383976

Comments

  • Registered Users, Registered Users 2 Posts: 678 ✭✭✭jmkennedyie


    kneemos wrote: »
    They're purely to preserve the little critters presumably? Like those bat caves they built everywhere.
    No. Let river flow during flooding. See above.


  • Registered Users, Registered Users 2 Posts: 394 ✭✭MichealD


    m17 wrote: »
    Bridge under construction at the urrin river 06/10/17IMAG6700_zpsvtx8f81p.jpg2IMAG6701_zpswktphh18.jpg

    @M17 Great photos. Super coverage of M17 project. Have to moved to the south east now?!


  • Moderators, Science, Health & Environment Moderators Posts: 5,487 Mod ✭✭✭✭spacetweek


    MichealD wrote: »
    @M17 Great photos. Super coverage of M17 project. Have to moved to the south east now?!

    That is some bridge. What's the idea there, will the river flow through where the cameraman was?


  • Moderators, Social & Fun Moderators, Paid Member Posts: 13,911 Mod ✭✭✭✭JupiterKid


    MichealD wrote: »
    @M17 Great photos. Super coverage of M17 project. Have to moved to the south east now?!


    I really hope so. We are crying out for really good drone footage of the M11 project.:D


  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    Concrete been poured over the railway line at camolin 08/09/17IMAG6046_zpsf0mwmcwa.jpg


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    Lough garrynisk to scurlocksbush overpass 22/09/17IMAG6077_zps1hxsk8z5.jpg


  • Registered Users, Registered Users 2 Posts: 667 ✭✭✭BelfastVanMan


    m17 wrote: »
    Lough garrynisk to scurlocksbush overpass 22/09/17IMAG6077_zps1hxsk8z5.jpg
    Is this part of the N30?


  • Banned (with Prison Access) Posts: 1,142 ✭✭✭Middle Man


    Is this part of the N30?
    Or is it a new canal! :D


  • Registered Users, Registered Users 2 Posts: 378 ✭✭Reuben1210


    Is this part of the N30?

    No, it's along the M11 corridor!


  • Registered Users, Registered Users 2 Posts: 667 ✭✭✭BelfastVanMan


    Reuben1210 wrote: »
    Is this part of the N30?

    No, it's along the M11 corridor!

    Ah right, thanks. :-)


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 33,709 ✭✭✭✭Cantona's Collars


    They must be going to dig out most of the hill at the Milehouse interchange,drove that way yesterday and where the new road is going is a long way down under the existing road.


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    Overpass at the gap cross is open. I'll get a pic later.


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    The New Gap Cross overpass.:D


  • Registered Users, Registered Users 2 Posts: 394 ✭✭MichealD


    Is the The Gap cross overpass the first completed structure of the M11 project? I passed through The Harrow on Sunday and see the deck on the overpass well advanced. The bridge on the Marshallstown road must be close to completed?


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    MichealD wrote: »
    Is the The Gap cross overpass the first completed structure of the M11 project? I passed through The Harrow on Sunday and see the deck on the overpass well advanced. The bridge on the Marshallstown road must be close to completed?

    Yes I think it’s the first structure open to traffic. I took pictures in both directions standing on it but boards won’t let me upload them because they’re larger the the paltry 4 mb allowed. The overpass on the Monart road has been delayed due to safety issues, there’s a hold up of another 4 weeks on the Marshalstown structure because a mistake was made, they’re falling way behind with the structures. Work in Corbally has slowed to a crawl as the soil is very poor quality it bears more resemblance to sand than soil it looks like they’re going to have to go back to the drawing board on that section. Bam tried pulling a fast one in Cooladine by closing the road thus imposing an 8 km detour on the residents even though they said they wouldn’t close the road during initial consultations. Following some heated discussion Bam backed down and are going to put a light controlled twist in the road like they’ve done in Scoby (which is what they should have done everywhere) the lengthy road closures are ridiculous at this stage.


  • Moderators, Science, Health & Environment Moderators Posts: 5,487 Mod ✭✭✭✭spacetweek


    jca wrote: »
    The New Gap Cross overpass.:D

    Thanks. Can you get a pic of the mainline from the overpass?


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    spacetweek wrote: »
    Thanks. Can you get a pic of the mainline from the overpass?

    I have two, one in each direction but they're too large to upload here. I'll try to link to them from Google drive etc.

    Looking towards Dublin https://drive.google.com/file/d/15F83VzSbSp4emQPS6IDoD8zkqewOsXL4RQ/view?usp=sharing

    Looking towards Wexford, https://drive.google.com/file/d/1nexhwCrt5Vx_j_KqbehpG9Mo84XHj_Hltw/view?usp=sharing


  • Moderators, Science, Health & Environment Moderators Posts: 5,487 Mod ✭✭✭✭spacetweek


    Thanks! In future I suppose you could just reduce the size/res of the photos to get them under the upload limit.


  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    spacetweek wrote: »
    Thanks! In future I suppose you could just reduce the size/res of the photos to get them under the upload limit.

    All he as to do is get himself photobucket and there will be no messing with pics


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    m17 wrote: »
    All he as to do is get himself photobucket and there will be no messing with pics

    Is that what you use to embed your photos?


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    jca wrote: »
    Is that what you use to embed your photos?
    yes it is,your pics will be like this the gap cross looking towards dublin 26/10/17IMAG7001_zpsijimrxwt.jpg
    looking towards wexfordIMAG7003_zpsfxxvt2cc.jpgjust send me a pm if you have any questions all the best with it really looking forward to seeing how this project turns out


  • Registered Users, Registered Users 2 Posts: 33,709 ✭✭✭✭Cantona's Collars


    The steel beams are still not lifted into situ at Solsboro,there seems to be about a month delay or more on doing it.


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    The steel beams are still not lifted into situ at Solsboro,there seems to be about a month delay or more on doing it.

    Seemingly they've been rejected by one of the engineers the bolts have been over-torqued and he wants them replaced (all 18,000 of them:eek:). He isn't happy with the paint on them either he says it's too thick and it needs to be sandblasted off. There's a stand off as the beam manufacturers want to do the fixes on site and the engineer doesn't want that.


  • Registered Users, Registered Users 2 Posts: 21,493 ✭✭✭✭kneemos


    Another new bridge just before the end of the motorway.


  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    kneemos wrote: »
    Another new bridge just before the end of the motorway.

    Any chance of a few pics of the mainline


  • Registered Users, Registered Users 2 Posts: 21,493 ✭✭✭✭kneemos


    m17 wrote: »
    Any chance of a few pics of the mainline


    There is surely,if I'm passing I'll get some. Good few kilometres visible to the north actually,not much to see to the south.


  • Registered Users, Registered Users 2 Posts: 2,671 ✭✭✭exaisle


    jca wrote: »
    Seemingly they've been rejected by one of the engineers the bolts have been over-torqued and he wants them replaced (all 18,000 of them:eek:). He isn't happy with the paint on them either he says it's too thick and it needs to be sandblasted off. There's a stand off as the beam manufacturers want to do the fixes on site and the engineer doesn't want that.

    I get the impression that somebody has p1ssed somebody off.....although if the job's not right, he's absolutely correct in making them redo it...pity engineers weren't as diligent in Priory Hall....


  • Closed Accounts Posts: 8,539 ✭✭✭jca


    kneemos wrote: »
    Another new bridge just before the end of the motorway.

    Is that scourloughs Bush? I see the glenteige road has been closed until December..... 2018!!


  • Registered Users, Registered Users 2 Posts: 21,493 ✭✭✭✭kneemos


    jca wrote: »
    Is that scourloughs Bush? I see the glenteige road has been closed until December..... 2018!!


    Noticed that. There's an overpass going in,dunno why it's closed for over a year though.