Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Fingal / North Dublin Transport Study

  • 08-12-2014 4:25pm
    #1
    Registered Users, Registered Users 2 Posts: 571 ✭✭✭


    http://www.nationaltransport.ie/news/minister-donohoe-national-transport-authority-announce-shortlist-of-project-options-to-address-future-transport-needs-in-fingalnorth-dublin/

    As part of a review of future transport needs in Fingal/North Dublin, the Minister for Transport, Tourism and Sport, Paschal Donohoe TD, today (Monday) announced a short-list of six project options to serve one of the fastest-growing regions in the country, encompassing Swords and Dublin Airport.
    The six proposed options are:
    • Two heavy rail options:
      • A DART link from Clongriffin to the airport and Swords (Option HR2);
      • A DART link from the Maynooth Railway Line to the airport and Swords via a tunnel under Glasnevin (Option HR8);
    • Two Luas/metro options:
      • A Luas line from Cabra to the airport and Swords via a tunnel under Glasnevin (Option LR3);
      • A metro proposal from St. Stephen’s Green to the Airport and Swords (Option LR7);
    • One Bus Rapid Transit (BRT) Option:
      • A combination of a number of proposed Bus Rapid Transit services (Option BRT 5); and
    • One Combination Option:
      • A combination of a DART link from Clongriffin to the airport and a Luas line from Cabra to Swords (Option C1).
    Population and employment growth in Fingal/North Dublin will stimulate increased travel across the region over the medium term that cannot be catered for by car. Extra public transport capacity will be required, supplemented by cycling and walking for shorter journeys.
    Earlier in 2014, following a public procurement process, the National Transport Authority appointed Aecom, a firm specialising in transport engineering, to identify optimum medium term / long term public transport solutions in the Fingal / North Dublin area. As part of the initial stage of the review, a total of 25 public transport scheme options were identified and proposed for initial evaluation, including:
    • 10 Heavy Rail options;
    • 8 Light Rail options;
    • 5 BRT options; and
    • 2 options combining different transport modes.
    All of those 25 proposals were reviewed and assessed, including consideration of technical feasibility, cost and environmental issues, following which the six shortlisted schemes have been proposed for further design development and more detailed evaluation. This next stage will include:
    • Technical development of the options, both engineering design and operational parameters;
    • More detailed costing and environmental assessment;
    • Transport modelling to assess likely usage; and
    • Cost benefit analysis.
    Full details of the 25 options and the six shortlisted options are published today on www.nationaltransport.ie, and members of the public are invited to review the material and submit their views and opinions before the consultation closes at 5:00pm on Monday, January 19th 2015.


«13456718

Comments

  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    • A Luas line from Cabra to the airport and Swords via a tunnel under Glasnevin (Option LR3)

    Let me get this straight.. we're prepared to tunnel through low density suburbs but not the actual city centre?

    I...

    Picard_Facepalm_small.png


  • Registered Users, Registered Users 2 Posts: 2,456 ✭✭✭Icepick




  • Registered Users, Registered Users 2 Posts: 19,049 ✭✭✭✭murphaph


    No guts just to build metro north as proposed. Fudge fudge fudge instead.


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    [*]Two heavy rail options:
    • A DART link from the Maynooth Railway Line to the airport and Swords via a tunnel under Glasnevin (Option HR8);

    Now this is a transport solution.

    We're going to have to start coughing up some hard cash to tackle transport in this city in a meaningful way. Getting beyond a joke now with all these micky mouse proposals.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    BRT seems to already be the favoured option. This country....sigh.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 2,456 ✭✭✭Icepick


    Let me get this straight.. we're prepared to tunnel through low density suburbs but not the actual city centre?
    It's Luas connecting to the cross city at-grade line currently under construction.


  • Registered Users, Registered Users 2 Posts: 9,846 ✭✭✭cgcsb


    Ehh we've covered this circa 2007 under the metro North EIS in which alternative arrangements were proposed and ruled out as unworkable, or with low merit.

    Groundhog Day.


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    Ren2k7 wrote: »
    BRT seems to already be the favoured option. This country....sigh.

    Cheap seems to be the favoured option you mean.

    Just throwing money at rubbish "to be seen to be doing something", instead of saving a few years capital spend for a meaningful project.

    Ugh I hate Irish politics.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    D.L.R. wrote: »
    Now this is a transport solution.

    We're going to have to start coughing up some hard cash to tackle transport in this city in a meaningful way. Getting beyond a joke now with all these micky mouse proposals.

    DU and MN would do just that, provide a level public transportation that would propel Dublin into the 21st century. And on top of all that they have an advantage over all the other proposals, they are read to go TODAY.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    D.L.R. wrote: »
    Cheap seems to be the favoured option you mean.

    Just throwing money at rubbish "to be seen to be doing something", instead of saving a few years capital spend for a meaningful project.

    Ugh I hate Irish politics.

    Cheap? Certainly, and likely a factor in how they came up with a near perfect rating for the insane BRT proposal.

    S5JWIEQ.png

    yaYPwP3.png


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    Icepick wrote: »
    It's Luas connecting to the cross city at-grade line currently under construction.

    Its a waste of an expensive tunnel to end up stuck in city centre traffic.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    Metro North is dead, long live Optimised Metro North.
    LR7 is an optimised version of the original Metro North proposal that has been developed by the
    RPA. It proposes providing a similar service at significantly reduced costs. It produces the same
    preliminary appraisal results as Metro North but at a significantly reduced cost and therefore
    presents significant benefit.

    So a cheaper MN. How did they get it cheaper? Oh right: Fewer stations, at grade through Ballymun and other parts, shorter length of stations reduced rolling stock. Bravo.


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    Ren2k7 wrote: »
    Cheap? Certainly, and likely a factor in how they came up with a near perfect rating for the insane BRT proposal.

    S5JWIEQ.png

    yaYPwP3.png

    Passenger Volume/Capacity isn't even a consideration, and apparently BRT journey times are on par with Metro North :pac:


  • Registered Users, Registered Users 2 Posts: 2,456 ✭✭✭Icepick


    D.L.R. wrote: »
    Passenger Volume/Capacity isn't even a consideration, and apparently BRT journey times are on par with Metro North :pac:
    2 Estimated Journey Time Swords Centre (Pavilions) - Dublin City Centre (STG):
    Optimised Metro North - 27 min
    BRT Docklands to Swords via Tunnel - 27 min

    Will BRT fly over junctions?


  • Registered Users, Registered Users 2 Posts: 19,049 ✭✭✭✭murphaph


    Icepick wrote: »
    Will BRT fly over junctions?
    Under them, in a motorway tunnel with no surface access so cannot serve the areas it passes under. There's some merit in using the tunnel as a remedial measure, but long term it has to be metro of course. Faffing around with buses in tunnels and trains that avoid settlements to allow them to be built cheap (and serve nobody) is really just annoying at this stage. I wonder how high the stack would be if you piled up all the reports on transport in Dublin?!


  • Registered Users, Registered Users 2 Posts: 2,963 ✭✭✭Van.Bosch


    Is this a wind up? Did they not state numerous times that BRT would not provide sufficient capacity, yet here it is again.

    If MN is off the agenda just come out and say it...


  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    this is beyond a joke, we can afford amongst other things a world class welfare budget? but not a decent transport system for our capital city? How can we have our say on this? The rail infrastructure here in particular (Dublin), is equivalent to our water infrastructure!

    A BRT for an airport that can handle 35 million passengers?! the quickest growing major airport in europe this year AFAIK...


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    Van.Bosch wrote: »
    Is this a wind up? Did they not state numerous times that BRT would not provide sufficient capacity, yet here it is again.

    If MN is off the agenda just come out and say it...

    In its appraisal report to the NTA it was said of Metro North:
    The following characteristics of Metro North should be taken into account during scheme
    appraisal:
    - The scheme satisfies the project objectives and, having already been developed to detailed
    design, is technically feasible;
    - The proposed route serves a very dense catchment area and many of the major trip
    generators within the study area;
    - The service has a very high capacity potential which would need to be examined against
    estimated demand through detailed modelling;
    - The service offers excellent journey times owing to the level of frequency and segregation
    proposed;
    - The proposed Metro North alignment has formed the basis for spatial plans within the study
    area for some time, therefore it integrates excellently with future planning proposals;
    - The scheme has already been through the required statutory planning processes and was
    granted planning approval to be developed; and
    - The cost of the scheme is high relative to all other schemes being assessed.

    It's also the fastest service compared to DART, Luas and BRT.

    Basically it ticks all the boxes. And that explains why it's the most expensive option, it does things right and doesn't try and get something on the cheap, like the other options try and do.

    High quality services cost money, this is a fact the government really needs to take note of instead of attempting to pass of inferior BRT or Luas projects to the public. Do the thing right NOW, and it will deliver many times its costs back to the state, not to mention being future proofed for decades.


  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    even if we have to wait longer for metro north, we have had the sham of a transport system for decades, why the rush now? Either do it properly or leave it until it can be done properly IMO!

    I drove from airport into town today, 1 hour into city centre, the flight from Leeds to here was 35 minutes in the air! The notion of the luas to the airport is also a joke...


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    "Optimised Metro North" interests me.

    It does away with Parnell and O'Connell Bridge stations, instead placing a station at Upper O'Connell Street.

    This leaves too big a gap between SSG and Upper O'Connell IMO.

    But it does create the opportunity to do this:

    331130.jpg

    Of course this undermines the whole idea of a less costly Metro North :rolleyes:


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    368 million is the cost of the luas cross city! was there even a need for it if they had simply gotten the finger out and built metro north?


  • Registered Users, Registered Users 2 Posts: 75 ✭✭roddney


    In all fareness the last 4 boxes in table for report are environmental impact stuff which is of low value. The table is misleading in that no weightings are given to criteria.

    Ignore last 4 criteria and things are more even.

    More interesting is statement in report that Dart Underground is a given.


  • Registered Users, Registered Users 2 Posts: 2,694 ✭✭✭BMJD


    And so the govt begin the sweet whispering into the ears of the voters of North Dublin. They will drag this out long enough so that they won't have to actually commit to anything ahead of the next election.


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    roddney wrote: »
    More interesting is statement in report that Dart Underground is a given.

    What page?


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    D.L.R. wrote: »
    What page?

    It's used as a baseline for their "do minimum" assessment of Dublin public transport going out to 2030.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    I love how they came up with the name "Optimised" Metro North. Sound much better than the Austerity Metro, which I'm sure Paul Murphy or RBB are itching to use.


  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    I love how they came up with the name "Optimised" Metro North. Sound much better than the Austerity Metro, which I'm sure Paul Murphy or RBB are itching to use.
    I am sure he would decry even a BRT as excessive and a waste of resources which would be far better contributing towards world class welfare rates than leaving a decent transport legacy...


  • Registered Users, Registered Users 2 Posts: 9,846 ✭✭✭cgcsb


    The whole document seemed to be orientated towards an 'optimised metro' which actually doesn't sound too bad at first then you get to the part where platforms would be reduced to 60m instead of 90m to save 70m. Fast forward 20 years and due to crush loading at peak times, perhaps someone has been killed at this point, 700mil is spent extending platforms.


  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    The whole document seemed to be orientated towards an 'optimised metro' which actually doesn't sound too bad at first then you get to the part where platforms would be reduced to 60m instead of 90m to save 70m. Fast forward 20 years and due to crush loading at peak times, perhaps someone has been killed at this point, 700mil is spent extending platforms.
    exactly, in the scheme of things, 70 million is nothing, isnt the entire cost of the project put at 2,500,000,000?! The 200,000 saving mentioned, from running it above ground in ballymun etc, that is a significant enough saving. The rolling stock, at least if they get the platform lengths right from the start, they can always purchase more rolling stock if and when needed at a later stage...


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 8,229 ✭✭✭LeinsterDub


    Ren2k7 wrote: »
    Metro North is dead, long live Optimised Metro North.



    So a cheaper MN. How did they get it cheaper? Oh right: Fewer stations, at grade through Ballymun and other parts, shorter length of stations reduced rolling stock. Bravo.

    I for one can't wait for the in service upgrade 5 years into its life like the luas.


  • Registered Users, Registered Users 2 Posts: 8,229 ✭✭✭LeinsterDub


    Isn't it madness to say the boom growth projection figures were too optimistic but not recession figures aren't too conservative. Now I've not read the report yet just the rte story.

    http://m.rte.ie/news/2014/1208/665495-dublin-transport/


  • Registered Users, Registered Users 2 Posts: 9,846 ✭✭✭cgcsb


    Idbatterim wrote: »
    exactly, in the scheme of things, 70 million is nothing, isnt the entire cost of the project put at 2,500,000,000?! The 200,000 saving mentioned, from running it above ground in ballymun etc, that is a significant enough saving. The rolling stock, at least if they get the platform lengths right from the start, they can always purchase more rolling stock if and when needed at a later stage...

    Exactly, I see no issue with surface running where there is space available, provided junctions are grade separate. Afterall the only reason one tunnels through cities at all is because of lack of surface space and /or to achieve grade separation.


  • Registered Users, Registered Users 2 Posts: 9,846 ✭✭✭cgcsb


    RTÉ put a very negative slant on it in last nights news saying 'metro north may be scrapped'. Yet this morning RTÉ were reporting that the government were in fact seeking EU infrastructural funding for metro north. Perhaps they got a bit ahead of themselves with the excitement.


  • Registered Users, Registered Users 2 Posts: 75 ✭✭roddney


    I have to say I do like the H8 option which is a totally new proposal. Heavy Rail line from Maynooth line (Glasnevin/Cabra to Swords) with relevant tunnels. There is a rail alignment from Cabra still preserved. Would add transport to Finglas rather than Ballymun.

    Caveat would be they could build a new tunnel from here to Stephen's Green (and beyond) at a later date. And it would be at Standard Irish gauge so linkable to rest of network.

    Also,rRunning of all new lines and Dart should be put out to tender as part of new works. Irish Rail shouldn't be running it anymore.


  • Registered Users, Registered Users 2 Posts: 9,846 ✭✭✭cgcsb


    roddney wrote: »
    I have to say I do like the H8 option which is a totally new proposal. Heavy Rail line from Maynooth line (Glasnevin/Cabra to Swords) with relevant tunnels. There is a rail alignment from Cabra still preserved. Would add transport to Finglas rather than Ballymun.

    Caveat would be they could build a new tunnel from here to Stephen's Green (and beyond) at a later date. And it would be at Standard Irish gauge so linkable to rest of network.

    Also,rRunning of all new lines and Dart should be put out to tender as part of new works. Irish Rail shouldn't be running it anymore.

    a heavy rail tunnel would be required, i.e. it'd work out more expensive and would be less direct and result in more new pinch points on the rail network.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 18,126 ✭✭✭✭Idbatterim


    Dublin airport numbers up 12% in November!

    http://www.dublinairport.com/gns/at-the-airport/latest-news/14-12-09/Almost_1_6_Million_Passengers_In_November_At_Dublin_Airport.aspx

    Building anything other MN, to an airport that will likely handle close to, if not over 30,000,000 people by the time this bloody thing is eventually built, is insane!

    say its 22,000,000 this year, with 5% growth per year, over the next 5 years, it would hit 28,000,000...


  • Registered Users, Registered Users 2 Posts: 625 ✭✭✭yermanoffthetv


    cgcsb wrote: »
    a heavy rail tunnel would be required, i.e. it'd work out more expensive and would be less direct and result in more new pinch points on the rail network.

    True, but if your building a core piece of infrastructure for the next 100 odd years might as well go with heavy rail.The direct route down O'Connell St. isnt going to happen but as roddney said it leaves the option open at a later stage, also its probable it would link up with DU and then who knows, potentially even a loop line. It just seems (to me anyway) like the long term solution that could be built upon over time.


  • Registered Users, Registered Users 2 Posts: 1,295 ✭✭✭D.L.R.


    roddney wrote: »
    I have to say I do like the H8 option which is a totally new proposal. Heavy Rail line from Maynooth line (Glasnevin/Cabra to Swords) with relevant tunnels. There is a rail alignment from Cabra still preserved. Would add transport to Finglas rather than Ballymun.

    Caveat would be they could build a new tunnel from here to Stephen's Green (and beyond) at a later date. And it would be at Standard Irish gauge so linkable to rest of network.

    Also,rRunning of all new lines and Dart should be put out to tender as part of new works. Irish Rail shouldn't be running it anymore.

    I like HR8 too, it makes a lot of sense, especially if a junction was built for trains to both Connolly and Heuston, and access to DU at Docklands provided. The route from Liffey Jn to the city is 4-track too, if you consider the Canal line.


  • Banned (with Prison Access) Posts: 1,121 ✭✭✭ClovenHoof


    roddney wrote: »
    I have to say I do like the H8 option which is a totally new proposal. Heavy Rail line from Maynooth line (Glasnevin/Cabra to Swords) with relevant tunnels. There is a rail alignment from Cabra still preserved. Would add transport to Finglas rather than Ballymun.


    There was a group about a decade ago calling Platform Eleven who proposed just this. I can recall the document they did in conjunction with a consultancy firm. The map was even on the website. The map showed a tunnel from Liffey Junction bringing trains from the Dunboyne, Maynooth and Western Lines(via the Park Tunnel) into the airport.

    With Dublin Airport being BE's fastest growing customer base, Irish Rail are missing the ball on this one. Big Time.


  • Registered Users, Registered Users 2 Posts: 2,790 ✭✭✭AngryLips


    The problem with all the proposals for a rail connection to the airport other than Metro or Luas is that none of them bring people into the city centre. And of the two that do, Luas would probably be frustratingly slow and under capacity.

    If the intention is to provide a rail connection to the airport that doesn't serve the city centre then the least they could do is make it a rail connection that feeds into the national rail network, that is by terminating all Heuston-bound services at the airport and looping northern line services via the airport also. It would make Dublin airport much more accessible to the rest of the country. They've already done much the same with the Bus Eireann network, it just makes sense. Solve the problem of city transport for the Fingal area through some other solution because they're two separate problems if you ask me.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 2,467 ✭✭✭Oasis_Dublin


    Idbatterim wrote: »
    I am sure he would decry even a BRT as excessive and a waste of resources which would be far better contributing towards world class welfare rates than leaving a decent transport legacy...

    Yeah socialists hate public transport. They're all for the proliferation of the private motor car.

    DERP


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    cgcsb wrote: »
    The whole document seemed to be orientated towards an 'optimised metro' which actually doesn't sound too bad at first then you get to the part where platforms would be reduced to 60m instead of 90m to save 70m. Fast forward 20 years and due to crush loading at peak times, perhaps someone has been killed at this point, 700mil is spent extending platforms.

    And an engineering nightmare to boot. The whole thing seems to be based around the idea that because there is slightly less demand now for public transport than forecast the whole thing should be redesigned. Long term thinking simply doesn't exist in Ireland.


  • Registered Users, Registered Users 2 Posts: 1,161 ✭✭✭Ren2k7


    cgcsb wrote: »
    RTÉ put a very negative slant on it in last nights news saying 'metro north may be scrapped'. Yet this morning RTÉ were reporting that the government were in fact seeking EU infrastructural funding for metro north. Perhaps they got a bit ahead of themselves with the excitement.

    Frank McDonald must have been nursing one hell of a hangover this morning. :pac:


  • Registered Users, Registered Users 2 Posts: 12,309 ✭✭✭✭Grandeeod


    ClovenHoof wrote: »
    There was a group about a decade ago calling Platform Eleven who proposed just this. I can recall the document they did in conjunction with a consultancy firm. The map was even on the website. The map showed a tunnel from Liffey Junction bringing trains from the Dunboyne, Maynooth and Western Lines(via the Park Tunnel) into the airport.

    With Dublin Airport being BE's fastest growing customer base, Irish Rail are missing the ball on this one. Big Time.

    I remember. O'Reilly consultants. They were asked to give an opinion on MN and pointed out Glasnevin junction as an interchange point for Metro and then actually went further by pointing out that DART could be a "Metro" if a tunnel was built under Glasnevin and onwards to the airport.

    Robbing bastards!:D


  • Registered Users, Registered Users 2 Posts: 12,309 ✭✭✭✭Grandeeod


    It went something like this!

    Extract from O'Reilly Report

    Platform 11 also supports Iarnród Éireann's plan for an Interconnector and believes that Iarnród Éireann's plan for an Airport DART is preferable to a Metro. However, if a Metro were to be built, they strongly believe that it should intersect with the Phoenix Park line at Glasnevin Junction transfer station to allow for full integration of the Greater Dublin suburban network. Page 40 O'Reilly Metro report

    Platform 11's proposals for a transfer station at Glasnevin Junction accommodating an underground Metro station are very interesting and clearly merit evaluation. Page 41 O'Reilly Metro report


  • Registered Users, Registered Users 2 Posts: 12,309 ✭✭✭✭Grandeeod


    Grandeeod wrote: »
    It went something like this!

    And if I'm not mistaken, the above was followed up by a proposal for running the DART from Glasnevin to the airport along the MN route that was then in the public domain. Not saying it was feasible, but its a little sad that the idea was ripped off in this latest document. A document that certainly looks like a fudge to not build anything meaningful anyway.


  • Registered Users, Registered Users 2 Posts: 7,805 ✭✭✭GerardKeating


    roddney wrote: »
    I have to say I do like the H8 option which is a totally new proposal. Heavy Rail line from Maynooth line (Glasnevin/Cabra to Swords) with relevant tunnels. There is a rail alignment from Cabra still preserved. Would add transport to Finglas rather than Ballymun.

    Caveat would be they could build a new tunnel from here to Stephen's Green (and beyond) at a later date. And it would be at Standard Irish gauge so linkable to rest of network.

    Also,rRunning of all new lines and Dart should be put out to tender as part of new works. Irish Rail shouldn't be running it anymore.

    IMHO, the Best option is the Metro Route, but Built as a DART.

    It would run from DU in Stephens Green to the Airport, Swords and join the northern line near Rush/Lusk.


  • Registered Users, Registered Users 2 Posts: 5,741 ✭✭✭jd


    I think it's going to be a fudge - luas from Cabra to Swords with a ug section at Glasnevin + Dart to Airport from Clongriffin...


  • Moderators, Motoring & Transport Moderators, Regional East Moderators Posts: 8,131 Mod ✭✭✭✭liamog


    jd wrote: »
    I think it's going to be a fudge - luas from Cabra to Swords with a ug section at Glasnevin + Dart to Airport from Clongriffin...

    NTA has an odd obsession with BRT right now, the report conveniently shows the BRT with note greens than any other option.

    I think BRT wouldn't work on this corridor as it would reach capacity really quickly.


  • Registered Users, Registered Users 2 Posts: 9,388 ✭✭✭markpb


    liamog wrote: »
    NTA has an odd obsession with BRT right now,

    I suspect it's because it's all they believe they'll get funding for.


  • Advertisement
Advertisement