cost of a build from scratch in Dublin?

  • 14-07-2012 11:41pm
    #1
    Registered Users, Registered Users 2 Posts: 112 ✭✭


    We are looking at this site but need a bit of advise.
    link removed
    Its 1290 sq ft, what would be a reasonable price for a full build to a medium spec finish?
    What would be a reasonable time frame?
    Does it have to be built to the plans provided? How much scope is there to change things from the plan?


Comments

  • Registered Users, Registered Users 2 Posts: 14,547 ✭✭✭✭Poor Uncle Tom


    I'm sorry but you can't just put up plans without the owners permission. Please read the forum charter.


  • Registered Users, Registered Users 2 Posts: 112 ✭✭brianb10


    I'm sorry but you can't just put up plans without the owners permission. Please read the forum charter.

    Sorry about that.
    It's a two story, 3 bed house plan in Santry.


  • Registered Users, Registered Users 2 Posts: 1,583 ✭✭✭kkelliher


    brianb10 wrote: »
    We are looking at this site but need a bit of advise.
    link removed
    Its 1290 sq ft, what would be a reasonable price for a full build to a medium spec finish?
    What would be a reasonable time frame?
    Does it have to be built to the plans provided? How much scope is there to change things from the plan?

    Cost will depend on finish, cost of kitchen, tiles, wall finishes, insulation standard. joinery finishes including doors, skirts, architraves etc.

    Reasonable time for any new build property from scratch is 8-10 months

    If the plans have planning permission then yes, if not then you are free to apply for a new layout through the planning process. You can also go back through the planning process to change the existing drawings if they have planning but there may be restrictions depeneding on site layout, location and negighbouring properties