Mid build. Replacing a shower tray. Too late?

Options
  • 20-06-2021 10:30pm
    #1
    Registered Users Posts: 251 ✭✭


    Have shower tray in. Slabbing and plywood flooring down. Tiler due this week. Am regretting the size. Went5with the old size but there's enough room for another 100mm.
    Was going to ask the builder before the tiler comes but is it a big job? It's a long shot as I may not be able to get a dif tray ASAP. :/


Comments

  • Registered Users Posts: 12,736 ✭✭✭✭Dtp1979


    misc2013 wrote: »
    Have shower tray in. Slabbing and plywood flooring down. Tiler due this week. Am regretting the size. Went5with the old size but there's enough room for another 100mm.
    Was going to ask the builder before the tiler comes but is it a big job? It's a long shot as I may not be able to get a dif tray ASAP. :/

    Of course it’s possible. You’ll pay extra obviously but once there’s no tiles down then it’s possible


  • Registered Users Posts: 8,565 ✭✭✭K.Flyer


    Exactly as Dtp says, small cost to change it now compared to trying it after tiling.