Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Insulated thermal board

  • 13-01-2019 10:06pm
    #1
    Registered Users Posts: 211 ✭✭


    Hi I need to move a plug socket over to a finished 64mm thermal board wall. Would it be okay to cut a track in the plasterboard and remove some insulation before putting the cable in conduit and then plastering over it? thanks.


Comments

  • Registered Users, Registered Users 2 Posts: 5,391 ✭✭✭DublinDilbert


    Hi I need to move a plug socket over to a finished 64mm thermal board wall. Would it be okay to cut a track in the plasterboard and remove some insulation before putting the cable in conduit and then plastering over it? thanks.

    Not ideal as the integrity of the board would be compromised. How long is the run?

    For a short run you might be able to shove a pipe or something up through the insulation making a channel for the cable


  • Registered Users Posts: 211 ✭✭Johnnycanyon


    Not ideal as the integrity of the board would be compromised. How long is the run?

    For a short run you might be able to shove a pipe or something up through the insulation making a channel for the cable

    It would be down to counter level but because the roof is flat I would be unable to shove a pipe down from above.. I didn't think cutting a Grove in the plasterboard would be a problem as switch and plug boxes are all cut out anyway. There would be a couple of inches of insulation behind the conduit and new plaster over the cut out groove. I was more wondering about this from an electrical point of view.. thanks


  • Registered Users, Registered Users 2 Posts: 5,391 ✭✭✭DublinDilbert


    Is there another route you can take to get the cable down behind the counter then come back up to where the switch/socket should be from under the counter. Is there another cable chase you could come down?


    Seems like a lot of hard work to patch up the slab and trying to get it looking like new again.


  • Registered Users Posts: 211 ✭✭Johnnycanyon


    Is there another route you can take to get the cable down behind the counter then come back up to where the switch/socket should be from under the counter. Is there another cable chase you could come down?


    Seems like a lot of hard work to patch up the slab and trying to get it looking like new again.

    Only way is from top ,but with cabinets on wall and tiles going over work top it would leave very little patching which would be out of sight on top of cabinets..