Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on [email protected] for help. Thanks :)
Hello All, This is just a friendly reminder to read the Forum Charter where you wish to post before posting in it. :)
Hi all, The AutoSave Draft feature is now disabled across the site. The decision to disable the feature was made via a poll last year. The delay in putting it in place was due to a bug/update issue. This should serve as a reminder to manually save your drafts if you wish to keep them. Thanks, The Boards Team.
Hello all! This is just a quick reminder to ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere.

Typical BER improvement after solar pv install

  • 08-06-2021 6:36am
    #1
    Registered Users Posts: 40 Colm82


    Could anyone give me a rough idea on what my BER would improve by on installation of solar pv. Thinking of getting a 4.2 kW SYSTEM not 100% certain on a battery yet-would a battery change the ber?

    My current BER is D2, house is a 125sqm bungalow, I want to ensure it would increase into the C category for the grant before I start the process.

    Much appreciated.


«134

Comments

  • Registered Users Posts: 2,645 ✭✭✭ Rigor Mortis


    I went from a D1 to a C2. That was with 14 panels and a battery. I dont know the difference that a different system would make


  • Registered Users Posts: 44,081 ✭✭✭✭ Bobeagleburger


    ^^

    That calculation may be incorrect.

    Let me find the one someone on the BER forum gave me last week.


  • Registered Users Posts: 44,081 ✭✭✭✭ Bobeagleburger


    see appendix m here



    https://www.seai.ie/home-energy/building-energy-rating-ber/support-for-ber-assessors/domestic-ber-resources/deap4-software/DEAP-Manual-Version-.pdf


    The electricity produced by the PV module in kWh/year is
    0.80 × kWp × S × ZPV (M1)

    where:

    S is the annual solar radiation from Table H2 (depending on orientation and pitch)
    ZPV is the overshading factor from Table H3. If there are two PV modules, e.g. at different tilt or orientation, apply
    equation (M1) to each and sum the annual electricity generation.




    So, in the example above for the OP, this would be:


    (0.80 × 4.2kwp× 1 × 1072) / (125 m2)

    = 28.82 energy reduction per m2


    Note, this example assumes no shading and uses a South facing roof with 45 degrees pitch....


  • Registered Users Posts: 1,721 ✭✭✭ SD_DRACULA


    Yeah as mentioned above the annual production is the biggest factor, mine went from C2 to A2 with 7kwp because of the total annual production, or so I was told.


  • Advertisement
  • Registered Users Posts: 982 ✭✭✭ kabakuyu


    I just completed a first time Ber for grant.I installed a 2.5 system south facing. I had other energy improvements carried out in the last few years (new condensing boiler,trvs on rads,and new double glazing).
    I also recently topped up attic insulation by 200mm, permanently blocked 2 fireplaces,relagged immersion,installed LEd lights everywhere,and did other little jobs myself to ensure I hit the c3 for the grant.I ended up with a b2 which I was very happy with.
    I had all the documentation for the windows and kept specs for lagging jacket,leds, insulation, and anything else I could think of.I suggest you do all the small jobs to ensure you hit the c3.


  • Moderators, Sports Moderators Posts: 14,163 Mod ✭✭✭✭ Zzippy


    6 wrote: »
    see appendix m here

    https://www.seai.ie/home-energy/buil...l-Version-.pdf


    The electricity produced by the PV module in kWh/year is
    0.80 × kWp × S × ZPV (M1)

    where:

    S is the annual solar radiation from Table H2 (depending on orientation and pitch)
    ZPV is the overshading factor from Table H3. If there are two PV modules, e.g. at different tilt or orientation, apply
    equation (M1) to each and sum the annual electricity generation.




    So, in the example above for the OP, this would be:


    (0.80 × 4.2kwp× 1 × 1072) / (125 m2)

    = 28.82 energy reduction per m2


    Note, this example assumes no shading and uses a South facing roof with 45 degrees pitch....

    Dead link on SEAI website. Any chance of a screenshot of that appendix?


  • Registered Users Posts: 44,081 ✭✭✭✭ Bobeagleburger




  • Registered Users Posts: 40 Colm82


    Guys thanks to all who have responded - my current rating is at a usage of 269 kW/m2 so a reduction of 29 won't bring me to a C.

    Also my house is south east facing so likely wouldn't get the full 29 reduction from solar pv.

    I am planning on upgrading the hwc as its an old copper one with a very basic lagging jacket and possibly new windows which may improve this further as we are doing a renovation job on the house. Although this is just replacing old brown double glazing with new white double glazing which is more for aesthetics than energy efficiency so may not improve anything.

    I also plan also to block off our three open chimneys during the renovation (two open fireplaces and a solid fuel stove) and replace all with a single modern wood pellet Burner with an external flue out of the gable wall and new rads with tcv.

    Hopefully all works together may bring me to a C.

    Do any of the solar companies assess the final Ber before work so you would know final rating post works?


  • Registered Users Posts: 40 Colm82


    kabakuyu wrote: »
    I just completed a first time Ber for grant.I installed a 2.5 system south facing. I had other energy improvements carried out in the last few years (new condensing boiler,trvs on rads,and new double glazing).
    I also recently topped up attic insulation by 200mm, permanently blocked 2 fireplaces,relagged immersion,installed LEd lights everywhere,and did other little jobs myself to ensure I hit the c3 for the grant.I ended up with a b2 which I was very happy with.
    I had all the documentation for the windows and kept specs for lagging jacket,leds, insulation, and anything else I could think of.I suggest you do all the small jobs to ensure you hit the c3.

    Thanks - great advice and lots of information very relevant for my future works.


  • Advertisement
  • Registered Users Posts: 262 ✭✭ carrickbawn


    Have recently had Solar PV fitted and am long overdue changing my electricity provider. Do I need to tell them about PV and what should I be prioritizing now from the new provider.
    TIA.


  • Registered Users Posts: 5,076 ✭✭✭ SouthWesterly


    Colm82 wrote: »
    Thanks - great advice and lots of information very relevant for my future works.

    I was the same.
    My house was a d2. I did some work on the house and a new oil boiler.
    Looked after the likes of bulbs, adjustable vents and door strips. It went to C1. I've just to get the solar in now and add the new figures for the assessor to send in the submission.


  • Registered Users Posts: 44,081 ✭✭✭✭ Bobeagleburger


    went from C1 to A3 with:
    • Attic insulatution topup
    • Cavity wall pumping
    • 5.7kwp pv system

    pv system alone moved it 3 grades.


  • Registered Users Posts: 11,605 ✭✭✭✭ KCross


    Have recently had Solar PV fitted and am long overdue changing my electricity provider. Do I need to tell them about PV and what should I be prioritizing now from the new provider.
    TIA.

    Do you need to tell them... no
    Prioritising... cheapest electricity possible please!


  • Registered Users Posts: 11,605 ✭✭✭✭ KCross


    6 wrote: »
    went from C1 to A3 with:
    • Attic insulatution topup
    • Cavity wall pumping
    • 5.7kwp pv system

    pv system alone moved it 3 grades.

    Just so others don’t get misled, the grades are not linear so you won’t get moved up 3 grades in every case. It depends on what grade you’re starting from.


  • Registered Users Posts: 469 ✭✭ raytaxi


    Mine has gone from a B3 (143.47) to a B2 (118.9) with a 2.5kwp, though first was a DEAP 3.2.1 new one done under latest DEAP 4.0 don't know if that would have any bearing and unfortunately I was not home when it was done.


  • Registered Users Posts: 44,081 ✭✭✭✭ Bobeagleburger


    KCross wrote: »
    Just so others don’t get misled, the grades are not linear so you won’t get moved up 3 grades in every case. It depends on what grade you’re starting from.

    Absolutely.

    Plenty of variables to be considered.


  • Registered Users Posts: 1,758 ✭✭✭ deravarra


    After stumbling upon this post, I think my C3 rating should come up a bit after all we have done and will do:

    Done:
    new boiler - went to grant vortex condensing.
    New smart heating controls.
    New efficient water cylinder.
    Wood pellet room heating stove.

    Being done soon:
    Composite door replacing old wooden door.
    Solar PV including eddi diverter (5kwph)

    I would be hoping all this should bring us up a good bit!


  • Moderators, Sports Moderators Posts: 17,447 Mod ✭✭✭✭ slave1


    The EDDI will not feature in any BER calculations but 100% they are worth it


  • Registered Users Posts: 1,758 ✭✭✭ deravarra


    slave1 wrote: »
    The EDDI will not feature in any BER calculations but 100% they are worth it

    I am hoping the other bits and pieces will drag it up to a better rating :)


  • Advertisement
  • Moderators, Social & Fun Moderators Posts: 13,219 Mod ✭✭✭✭ AndyBoBandy


    We bought our house as a C3, and have since done the following work;

    Attic converted and insulated, originally it was the roll up stuff just laid out above the existing ceilings, now it's the foam boards in the roof and side walls (so I presume an upgrade on what was put in 15 years prior when the house was built), then the removed/remaining roll up stuff was packed under the floor above the ceilings outside of the attic walls.

    Heating control - old analogue timer replaced by Nest smart thermostat

    Open gas fire replaced by inset stove which now seals off the chimney to the outside - not sure if this will affect BER, but it sealed up a terrible draught in the sitting room.

    Wooden front door replaced by composite front door (original door was draughty, new door is 100% sealed).

    Lighting - 99% of lights in the house are LED (Philips Hue). Only non LED bulbs are the cooker cover lights and under kitchen unit lights, which are rarely used.

    Hot water tank: when the attic was converted, the hot press needed moving, so I replaced the old ~60L copper tank with a factory insulated 162L stainless tank.


    Upcoming work;

    Solar PV install - anything from 4.7kW - 5.8kW (depending on what they can fit on the roof, but the more the merrier), battery, Eddi

    Not sure what the existing work, and PV work will do to the BER, but would be delighted if we could get up to a C1, and we'd be over the moon if we could get it into B territory!!


    Future work we'd like to do is install an Air to Water Heat Pump, and then possibly upgrade the windows to triple glazed, but that's probably a few years away yet.



  • Moderators, Sports Moderators Posts: 17,447 Mod ✭✭✭✭ slave1


    Hope you kept receipts! Depending on the BER assessor they can be quite bitchy, luckily I keep photos of everything so could "show" hidden improvements like floor insulation, insulated slabs etc.

    1974 typical semi now with B2 but should be A3 due to SEAI not accepting my oil boiler efficiency and also extra panels installed since BER carried out



  • Moderators, Social & Fun Moderators Posts: 13,219 Mod ✭✭✭✭ AndyBoBandy


    Thankfully I have the receipts for every and all purchases I've made for the house including stove, hot water cylinder, front door etc...

    I also extensively photographed every step of the the attic conversion...

    I even put additional pipe insulation on the (warm) piping to/from the new cylinder.. as I wasn't happy with it being left bare..




  • Registered Users Posts: 290 ✭✭ Biker1


    An assessor has to provide definitive proof for all entries into DEAP, based on SEAI's requirements for same. They are on a penalty point system which can lead to cancellation of their registration if 10 penalty points are accumulated over a two year period. Perhaps some assessors have another full time income and are willing to take shortcuts but most don't and are not being bitchy by trying to stay in business.



  • Moderators, Sports Moderators Posts: 17,447 Mod ✭✭✭✭ slave1


    I've heard of assessors who won't take photos as they don't want the "hassle" associated with off-paper proof, in my own case my assessor did take photos and did work with them.

    Where he failed was my oil burner, it had a hard coded efficiency percentile which put it below the 86% (which is a big reduction of your BER rating), I have the boiler serviced every year and have all my effieciency readings from professional boiler service guy and I've never been below 86%, despite pure documentated proof the SEAI side would not back down and "forced" a below 86% efficiency. BER guy was fed up and wouldn't "fight" the case so I just paid him and left it at that.



  • Registered Users Posts: 314 ✭✭ samdeluxjones



    I have PV system in 5 months now but no grant as my house is less than 10 years old so didn't need to get BER.


    Is there any reason I might have to get a BER in the future as in for the feed in tariff if it ever comes?



  • Registered Users Posts: 3,588 ✭✭✭ graememk


    Unless you're selling your house, no.

    The proposed premium rate, that might need a ber would only be for new installs. Anyone else will just get the standard rate.



  • Registered Users Posts: 26 Dag12


    I bought a house with C1 rating that was build in 2008. Previous owner had a BER assessment done. Which suggested upgrading gas boiler to >90% efficiency one; upgrading attic insulation to 300mm and adding heating controls via thermostat.

    Upgrading gas boiler alone was going to bring up the BER rating to B3.

    Now the question is how much BER increase should I expect if I add solar PV?

    I would appreciate your thoughts on this.



  • Moderators, Social & Fun Moderators Posts: 13,219 Mod ✭✭✭✭ AndyBoBandy


    I went from C3 when we moved in to B3 post solar, but I did do other things listed below that helped the rating (just missed out on B2 by a few points).

    We installed a 5.78kWp & a 5kWh battery system

    Attic converted and insulated

    Heating control - old analogue timer replaced by Nest smart thermostat

    Open gas fire replaced by inset stove

    Wooden front door replaced by composite front door

    Lighting - 99% of lights in the house are LED

    Hot water tank: replaced the old ~60L copper tank with a factory insulated 162L stainless tank - Eddi diverter also installed with the solar system.



  • Advertisement
Advertisement