Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Openreach trial in NI

  • 30-12-2022 11:35am
    #1
    Registered Users, Registered Users 2 Posts: 4,051 ✭✭✭


    Known as the GEN097/22 Complex Fault to Fibre Trial

    it's at https://www.openreach.co.uk/cpportal/updates/briefings/general-briefings/gen09722

    "As we transition from a copper based network to a full fibre network Openreach is looking at opportunities to migrate lines to this network where it is to everyone’s benefit (Reactive and Proactive migrations).

    One of the most time-consuming copper repairs are those which require ‘2nd Stage’ work (excavations to get to cables for example). Openreach is proposing a trial to understand the potential benefits of installing FTTP in place of repairing the copper where an Openreach engineer attends a copper repair and identifies that 2nd stage work is required to repair the copper service."



Comments

  • Registered Users, Registered Users 2 Posts: 36,170 ✭✭✭✭ED E


    Makes a lot of sense: eg you get a DUG with rodent issues, gonna be trenching anyways may as well just lay the optical drop there and then.



Advertisement