New back door and drylining.. What order

  • 27-02-2022 04:14PM
    #1
    Registered Users, Registered Users 2 Posts: 338 ✭✭


    Hi all,

    I have an uninsulated 1950s/60s two story flat roof extension buit with cavity block. I am looking at making this space more habitable on a budget.

    I need 2 things doing to it in the immediate future..

    1. Internal insulation

    2. A new backdoor.

    Is it better to do one before the other?

    Is it easier to have a new door fitted before drylining or is it all the one.

    Thanks