Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Capacity issues Irish rail

  • 11-02-2019 5:45am
    #1
    Registered Users, Registered Users 2 Posts: 1,276 ✭✭✭


    With dublin rail infrastructure struggling to meet demand due to lack of suitable rolling stock and capacity issues due the loop line bridge and other bottlenecks, should we be looking to in future train orders have provision for dart/commuter sets to be 10/12 cars, obviously sets that long would not be needed the vast majority of the time but if the stock was ordered with the right mix of 2 and 4 car units these sets could be strengthened or reduced as needed as is standard practice around the world.

    Is this feasible with the cost and issues that would come with lengthening platforms (Tara Street springs to mind as a major headache) and due to health and safety concerns I don't think under or overhanging of trains is permitted as was the case before at stations which were shorter. Thoughts?


Comments

  • Registered Users, Registered Users 2 Posts: 7,226 ✭✭✭Pete_Cavan


    Surely an infinitely better solution in every respect is higher rather than longer trains? There are double decker trains (not sure what the correct term is when referring to a train) that are within the clearance of at least part of our existing DART network.

    We really should be looking into this for the Northern line you would probably only have to replace a dozen or so road bridges and is a far more realistic prospect than adding tracks. There are a lot more bridges and tunnelled sections going south so probably not an option south of GCD.

    In an ideal world, the DU tunnel (when/if ever it gets built) would have a bore wide enough to accommodate these trains and then you could have double decker DARTs running from Malahide (or whatever the northern terminus is) to Hazelhatch (assuming the two bridges replaced as part of KRP2 are left with sufficient clearance). You would save a fortune on the DU project if you only have to build ~100m underground stations.


  • Moderators, Motoring & Transport Moderators Posts: 11,744 Mod ✭✭✭✭devnull


    With dublin rail infrastructure struggling to meet demand due to lack of suitable rolling stock and capacity issues due the loop line bridge and other bottlenecks, should we be looking to in future train orders have provision for dart/commuter sets to be 10/12 cars, obviously sets that long would not be needed the vast majority of the time but if the stock was ordered with the right mix of 2 and 4 car units these sets could be strengthened or reduced as needed as is standard practice around the world.

    Is this feasible with the cost and issues that would come with lengthening platforms (Tara Street springs to mind as a major headache) and due to health and safety concerns I don't think under or overhanging of trains is permitted as was the case before at stations which were shorter. Thoughts?

    There's some stations already that are at the maximum length of platforms so you are not going to get longer trains unfortunately to run for any decent portion of the Dublin area network.

    A fair few DART trains are still 6 cars at peak time with the odd 4 car working, getting these to 8 cars will create a nice capacity uplift, although that's going to be a few years away from being a reality.

    Whilst some of the ideas in this thread are nice, some of them just aren't going to be practical or there is not going to be the funding made available to start erecting a dozen bridges


  • Registered Users, Registered Users 2 Posts: 71,188 ✭✭✭✭L1011


    Are there any example of double deck trains running long underground stretches? NS do operate all their types, loco hauled and multi unit, underground e.g. at Schiphol - but nowhere as long as the DU tunnel is to be


  • Moderators, Education Moderators Posts: 5,028 Mod ✭✭✭✭G_R


    L1011 wrote: »
    Are there any example of double deck trains running long underground stretches? NS do operate all their types, loco hauled and multi unit, underground e.g. at Schiphol - but nowhere as long as the DU tunnel is to be

    The RER in Paris run double deckers if I'm not mistaken.


  • Registered Users, Registered Users 2 Posts: 5,606 ✭✭✭schemingbohemia


    Does frequency not trump capacity of individual trains?


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,276 ✭✭✭Thrashssacre


    Does frequency not trump capacity of individual trains?

    Ideally yes but the government has no plans to quad track any of the northern line until at least 2030 so I'm just throwing out some alternatives in the hope someone with more knowledge then me can say if there feasible or not


  • Closed Accounts Posts: 7,907 ✭✭✭Stephen15


    L1011 wrote: »
    Are there any example of double deck trains running long underground stretches? NS do operate all their types, loco hauled and multi unit, underground e.g. at Schiphol - but nowhere as long as the DU tunnel is to be

    Crossrail/Elizabeth Line when it eventually opens


  • Registered Users, Registered Users 2 Posts: 9,391 ✭✭✭markpb


    L1011 wrote: »
    Are there any example of double deck trains running long underground stretches? NS do operate all their types, loco hauled and multi unit, underground e.g. at Schiphol - but nowhere as long as the DU tunnel is to be
    Stephen15 wrote: »
    Crossrail/Elizabeth Line when it eventually opens

    Is that true? The Crossrail website makes no reference to double deck trains.


  • Moderators, Motoring & Transport Moderators Posts: 11,744 Mod ✭✭✭✭devnull


    They're single deck class 345 Bombardier Aventras which have been pretty problematic with ongoing software issues that is effecting all ordered Aventra fleets to some degree or other.


  • Registered Users, Registered Users 2 Posts: 71,188 ✭✭✭✭L1011


    Stephen15 wrote: »
    Crossrail/Elizabeth Line when it eventually opens

    The Crossrail units are single deck and I'm fairly certain the loading gauge on some of the repurposed sections would not support double deck at all even if the new sections do. The Connaught Tunnel would be a major issue.

    The UK loading gauge, with some exceptions (HS1, some bits of the old Grand Central) is even smaller than here.


  • Advertisement
  • Closed Accounts Posts: 7,907 ✭✭✭Stephen15


    L1011 wrote: »
    The Crossrail units are single deck and I'm fairly certain the loading gauge on some of the repurposed sections would not support double deck at all even if the new sections do. The Connaught Tunnel would be a major issue.

    The UK loading gauge, with some exceptions (HS1, some bits of the old Grand Central) is even smaller than here.

    I thought you meant non double deck trains. Yes for double deck trains there are some examples the main one being the RER in Paris also some double deck trains in Sydney use tunnels aswell and I believe some double deck trains go underground in stretches in Rome.


  • Registered Users, Registered Users 2 Posts: 71,188 ✭✭✭✭L1011


    The majority of underground systems are non double deck so that would have been a very odd question!


  • Closed Accounts Posts: 7,907 ✭✭✭Stephen15


    L1011 wrote: »
    The majority of underground systems are non double deck so that would have been a very odd question!

    I thought you were talking about underground heavy rail like Crossrail, RER or DU rather than lighter rail systems such as the London Underground, Metrolink or U-Bahn systems.


Advertisement