Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Please note that it is not permitted to have referral links posted in your signature. Keep these links contained in the appropriate forum. Thank you.

https://www.boards.ie/discussion/2055940817/signature-rules
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Prep for future domestic charging point

  • 10-06-2018 9:45pm
    #1
    Closed Accounts Posts: 844 ✭✭✭


    I'm having external insulation fitted and want to keep a future charging point in mind. We're a year or so away from moving to a two car BEV/PHEV setup so its a case of putting things in place if necessary for a future grant-funded charging point.


    Is there any issue leaving things as is and then running the cable externally from the soffit over the thinner external insulation render or would it be better to have a cable run now from the consumer unit behind the external insulation to the planned location for the charging point?


Comments

  • Registered Users, Registered Users 2 Posts: 8,035 ✭✭✭goz83


    It would make more sense to do it now. Cleaner job.