Rough Construction times

  • 30-12-2017 3:12pm
    #1
    Registered Users, Registered Users 2 Posts: 163 ✭✭


    Doing a small college project, have to make a very basic gantt chart for the construction process consisting of 10 stages with a 50% time accuracy. having never been involved in a building i don't have a notion of times so any help appreciated. we have no sizing for any of the stages that need to be built to make things worse

    rough times for the task of:

    Concrete retaining wall
    leveling a sloped site
    Digging foundations
    Pouring foundations
    Erecting a timber frame structure
    installing prefabricated wall and floor panels
    installing windows
    fully water proof the structure
    fully insulate the structure

    very vague i know but its what we were told to do so... any experienced opinions at all appreciated, and i stress it does not need to bee accurate at all i just need something to write down at this stage!!!