Attic Conversion Future Proofing

  • 04-10-2017 8:50pm
    #1
    Registered Users, Registered Users 2 Posts: 67 ✭✭


    Hi all

    Getting attic converted and wondering if anyone has any hints to anything extra i should do while the attics gutted..

    CAT 5 cable to rooms
    Extra plugs to rooms from attic
    Maybe an electric shower;)

    Once its done tis over :eek:


Comments

  • Moderators, Home & Garden Moderators Posts: 10,146 Mod ✭✭✭✭BryanF


    Start with what’s required by building regulations

    All Doors in stairs/hall to final exit need to be 30min rated

    Smoke alarm upgrade including mechanical automated hatch in stairwell roof

    Welcome to boards.ie, perhaps use the search function and read around the forum (this is covered to death)


  • Registered Users, Registered Users 2 Posts: 67 ✭✭Lostphrophet


    BryanF wrote: »
    Start with what’s required by building regulations

    All Doors in stairs/hall to final exit need to be 30min rated

    Smoke alarm upgrade including mechanical automated hatch in stairwell roof

    Welcome to boards.ie, perhaps use the search function and read around the forum (this is covered to death)

    all thats done arch certs etc. i was just thinking anything they wont do or future stuff :)
    I didnt realise i searched but didnt find anything ill have a look through:o
    Thanks for response in any event


  • Registered Users, Registered Users 2 Posts: 67 ✭✭Lostphrophet


    it will be all signed off as a habitable room with architect certs etc. was just thinking they are just doing the standard attic job ..while i have a chance should i use free gutted attic for any home automation or anything interesting that cant be really done after as all floor down etc:D
    BryanF wrote: »
    Start with what’s required by building regulations

    All Doors in stairs/hall to final exit need to be 30min rated

    Smoke alarm upgrade including mechanical automated hatch in stairwell roof

    Welcome to boards.ie, perhaps use the search function and read around the forum (this is covered to death)


  • Moderators, Society & Culture Moderators Posts: 40,800 Mod ✭✭✭✭Gumbo


    Have the bedrooms below got modern up to date cat5, coaxial wiring?
    This could be added now in the floor void and terminated in the rooms below.

    Cat 5 for CCTV?
    Internet repeaters / hard wired cable back to where the modem will be?