N63 - Abbeyknockmoy to Annagh Hill

Comments

  • Posts: 15,362 ✭✭✭✭ [Deleted User]


    The cost looks to be 6.3 mil euro according to the tender documentation


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,522 Mod ✭✭✭✭marno21


    http://connachttribune.ie/landowners-dark-road-compensation-490/

    Issues involving compensation for landowners along the route.


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,522 Mod ✭✭✭✭marno21




  • Banned (with Prison Access) Posts: 1,142 ✭✭✭Middle Man


    This road project is underway now...

    http://connachttribune.ie/road-improvements-sound-death-knell-former-railway-bridge-200/. Has anyone got more information on the project and how it is progressing?

    Good day for the roads :), sad day for the railways :( - IMO, that bridge should be replaced as it is likely that a commuter rail route will be required between Galway, Athenry and Tuam in the future - the Tuam Bypass includes a structure for the same railway - not only that, but included there is provision for a double track.


  • Closed Accounts Posts: 2,341 ✭✭✭D Trent


    http://www.tuamherald.ie/news/roundup/articles/2017/11/15/4148493-ballyglunin-bridge-design-heads-for-europe-approval/
    "The status of replacing the former railway bridge at Ballyglunin is to be raised with the Minister for Transport.

    A local councillor has claimed this week that €100,000 has been wasted on designing a bridge that “Irish Rail have told us they have no need for”. The bridge was demolished during road alignment works on the N63.
    The proposal to knock the bridge was hotly debated by County Councillors in recent years – some called for a guarantee that it would be replaced to facilitate the re-opening of the railway line while others argued that a pedestrian bridge would be sufficient as there was no hope of the railway line being used again.
    It has now emerged that approval for the bridge design must now be secured at European level before anything else can happen on the project "


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    The n63 abbeyknockmoy to annagh hill 18/02/18
    1IMAG3028_zpsbza9vdeb.jpg2IMAG3029_zps46oqyukj.jpg3IMAG3030_zpsolgiszqu.jpg4IMAG3031_zpscphowr5c.jpg5IMAG3032_zpsovfr4xwp.jpg6IMAG3033_zpsgb9iu1nu.jpg7IMAG3035_zpss6luyzft.jpg8IMAG3037_zpsms70qlh4.jpg9IMAG3039_zpsfdxt0ahe.jpg10IMAG3040_zpskeacocrz.jpg11IMAG3042_zps3miw7imh.jpg12IMAG3043_zpsmrxrecnz.jpg13IMAG3044_zpsn8ur6ky2.jpg14IMAG3045_zpswx8gyfpb.jpg


  • Registered Users, Registered Users 2 Posts: 1,072 ✭✭✭riddlinrussell


    Is that a separated cycleway that they are putting in alongside the roadway?


  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    The railway bridge on the n63 at ballygluin 01/05/17
    IMAG10907_zpsgbg6k3hb.jpg21/06/17IMAG10905_zpsm0v26czs.jpg18/02/18IMAG3042_zps3miw7imh.jpg


  • Closed Accounts Posts: 2,341 ✭✭✭D Trent




  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,522 Mod ✭✭✭✭marno21


    D Trent wrote: »
    N63 Liss to Abbey scheme - it'll be nice to see it happen but this side of 2020 is ambitious.

    TII are stone mad to get these done due to the massive safety benefits for the small outlay - but Shane Ross doesn't feel the same so they are being done very slowly.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    The n63 outside of abbeyknockmoy 17/05/18IMAG3249_zpsxm9xce9t.jpg


  • Banned (with Prison Access) Posts: 320 ✭✭WillieMason


    marno21 wrote: »
    N63 Liss to Abbey scheme - it'll be nice to see it happen but this side of 2020 is ambitious.

    TII are stone mad to get these done due to the massive safety benefits for the small outlay - but Shane Ross doesn't feel the same so they are being done very slowly.

    Vert dangerous road needs to done as soon as possible


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,522 Mod ✭✭✭✭marno21


    Vert dangerous road needs to done as soon as possible

    Hopefully will be done over the next 5 years


  • Registered Users, Registered Users 2 Posts: 4,321 ✭✭✭m17


    Railway bridge been taken down on the n63 11/06/17
    6Hfr1nc.jpg


  • Site Banned Posts: 136 ✭✭rainybillwill


    marno21 wrote: »
    N63 Liss to Abbey scheme - it'll be nice to see it happen but this side of 2020 is ambitious.

    TII are stone mad to get these done due to the massive safety benefits for the small outlay - but Shane Ross doesn't feel the same so they are being done very slowly.

    Any updates about this road? Has to be one of the most dangerous roads in the country


  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,522 Mod ✭✭✭✭marno21


    Any updates about this road? Has to be one of the most dangerous roads in the country

    None whatsoever I’m afraid