Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Ideal logic system 30 15kw

  • 01-12-2015 10:36pm
    #1
    Closed Accounts Posts: 1,115 ✭✭✭


    Hi,

    We have been quoted €2800 for removal of a back boiler and then an ideal logic system 30 (15kw) installed upstairs.

    Is this a good price? Is it a good boiler?

    Can a 15kw boiler handle 10 rads and the cylinder tank

    Thanks


Comments

  • Closed Accounts Posts: 1,115 ✭✭✭asteroids over berlin


    anybody?


  • Registered Users, Registered Users 2 Posts: 12,907 ✭✭✭✭Dtp1979


    Hi,

    We have been quoted €2800 for removal of a back boiler and then an ideal logic system 30 (15kw) installed upstairs.

    Is this a good price? Is it a good boiler?

    Can a 15kw boiler handle 10 rads and the cylinder tank

    Thanks

    Does the price include a Powerflushing and installation of a magnetic filter?


  • Closed Accounts Posts: 1,115 ✭✭✭asteroids over berlin


    no - no mention of that, how much would they cost?


  • Registered Users, Registered Users 2 Posts: 12,907 ✭✭✭✭Dtp1979


    no - no mention of that, how much would they cost?

    With a price like 2,800 they should be included. Make sure it's a proper powerflush your getting and not a chemical flush.
    Also, I'd go with another boiler than the logic.


  • Closed Accounts Posts: 1,115 ✭✭✭asteroids over berlin


    Dtp1979 wrote: »
    With a price like 2,800 they should be included. Make sure it's a proper powerflush your getting and not a chemical flush.
    Also, I'd go with another boiler than the logic.

    cheers


  • Advertisement
Advertisement