soil stack connections

  • 18-05-2014 12:40pm
    #1
    Registered Users, Registered Users 2 Posts: 62 ✭✭


    I have a new wavin 100 mm wavin under ground floor.
    Can i connect upstairs en-suite , upstairs bathroom(main) and 1 downstairs
    toilet to this pipe.It will then connect to AJ outside back window and from there
    to a new manhole.This will mean no connections visible on gable of house.Will
    this pipe also take the sinks,shower and washing machine


Comments

  • Closed Accounts Posts: 217 ✭✭richieburke01


    vietnam5 wrote: »
    I have a new wavin 100 mm wavin under ground floor.
    Can i connect upstairs en-suite , upstairs bathroom(main) and 1 downstairs
    toilet to this pipe.It will then connect to AJ outside back window and from there
    to a new manhole.This will mean no connections visible on gable of house.Will
    this pipe also take the sinks,shower and washing machine

    You need to vent this pipe outside to atmosphere at highest point usually
    Otherwise all traps might thermo syphon out leaving no seal and sewage gas will escape into the premises


  • Registered Users, Registered Users 2 Posts: 62 ✭✭vietnam5


    Yes i will be venting it but am i alright with three toilet connections
    and the other boss connections going into the 100mm wavin
    and then into the AJ


  • Closed Accounts Posts: 217 ✭✭richieburke01


    vietnam5 wrote: »
    Yes i will be venting it but am i alright with three toilet connections
    and the other boss connections going into the 100mm wavin
    and then into the AJ

    Depends on falls on pipework


  • Registered Users, Registered Users 2 Posts: 62 ✭✭vietnam5


    all falls are good


  • Closed Accounts Posts: 217 ✭✭richieburke01


    vietnam5 wrote: »
    all falls are good

    You should be ok


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 62 ✭✭vietnam5


    thanks