Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Increasing height of dormer first floor

  • 21-05-2009 3:31pm
    #1
    Closed Accounts Posts: 8,478 ✭✭✭


    At the stage now where I'm trying to maximise the height of my dormer build for upstairs. I'm thinking of an extra course of blockwork post concrete slab but this will increase the height of the soffits from the ground - so might not be as nice to look at as keeping the roof in line with downstairs wall height.

    Any other options I should be looking at?


Comments

  • Closed Accounts Posts: 5,433 ✭✭✭sinnerboy


    Assuming A is what you got . B - you don't want .

    C. Extend the overhang

    D. Crank the roof pitch


  • Closed Accounts Posts: 379 ✭✭pseudo-tech


    Raising the wall plate level to create more usable space in the roof will increase your ridge height. This will be a breach in your planning permission!!


  • Closed Accounts Posts: 8,478 ✭✭✭GoneShootin


    Thanks for that sinnerboy - puts it into perspective.

    I'm just going to gloss over that comment pseudo-tech ;)

    Attached is one example of where it was done, but in my case it would be 12 to 18 inches over the soffit of the porch, so perhaps bringing the overhang down to at least meet half way might do the job.


  • Registered Users, Registered Users 2 Posts: 14,547 ✭✭✭✭Poor Uncle Tom


    Just a point GoneShootin, I would make sure your supervising architect/AT/engineer is ok with this for signing off on. I have come across a lot of cases where the client took it upon themselves to alter building designs and then can not get them signed off.


  • Closed Accounts Posts: 379 ✭✭pseudo-tech



    I'm just going to gloss over that comment pseudo-tech ;)

    That's fine but I hope you don't have to alter it later!!


  • Advertisement
  • Closed Accounts Posts: 5,433 ✭✭✭sinnerboy


    Best not "gloss over" it GS . They guys are correct . Get the ok from your signing off professional .


  • Closed Accounts Posts: 8,478 ✭✭✭GoneShootin


    @all above

    Of course! Engineer is who took the photo of the house above for me :)

    Thanks


Advertisement