Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

BER Survey

  • 11-03-2009 12:35pm
    #1
    Closed Accounts Posts: 897 ✭✭✭


    Im thinking of getting a before BER survey done, to avail of the BER grant when it comes available.

    I am renovating an old house, so this is applicable to me.
    What I know I can hold off on until the grant comes available are:

    Attic Insulation. There is currently none.
    Cavity wall Insulation. There is also currently none.

    Can anyone tell me what is involved in the heatings control upgrade. I know on the website it says:


    * Minimum requirement of: 2 zones (space and water) with 7 day programmer (time and temperature) control and boiler interlock, time and temperature control of electric immersion heater and either 1 more zone control or 3 TRV's(?)

    I have the first phase of the electric wiring on the house completed. There is no electric immersion yet. Can anyone tell me, could I wing the heating controls upgrade? What would this involve. I can hold off on laying carpet up and down stairs so the pipes are accessible and stuff.

    Thanks


Advertisement