Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

PC Speakers with long leads

  • 11-01-2007 3:19pm
    #1
    Registered Users, Registered Users 2 Posts: 302 ✭✭


    I am looking for speakers, can be as crap as you like, but with long leads. My PC is under the desk (near the power supply), and I have a long USB lead connected to a hub. Therefore when I want to pull the PC out from under the desk, the 2 constraints are the monitor lead and the speaker lead.

    Looking for speakers with long leads, or is it possible to get extensions for the leads?


Comments

  • Registered Users, Registered Users 2 Posts: 37,485 ✭✭✭✭Khannie


    BlueSpud wrote:
    or is it possible to get extensions for the leads?

    Definitely possible to get extensions. Definitely.


  • Registered Users, Registered Users 2 Posts: 6,790 ✭✭✭cornbb


    Get an extension lead like this: http://www.a1audio.co.uk/shop/images/hosmhe125.jpg from Maplin or wherever


  • Closed Accounts Posts: 4,757 ✭✭✭8T8


    Most audio/video stores should have them basically you are after a 3.5mm jack male to female lead if you get a duh! response to that try asking for a headphone extension cable.

    Here is an example of one from an online store Lindy.


Advertisement