Ireland trains wrote: » https://www.thetimes.co.uk/article/stricter-rules-drive-up-cost-of-irish-transport-plans-g8lz52lck "€4 billion DART plan"
cgcsb wrote: » Simply cannot restrain themselves when the opportunity to print blatant error presents. But will complain that fewer and fewer people are paying any notice to print media.
Pete_Cavan wrote: » The reason DU didn't happen is because it was too big, too complex and had too many interconnected elements and failure on one was going to bring the whole lot tumbling down. Had we start with the current DART+ plan a decade ago, without the tunnel and dealing with the various lines individually but as part of an overall plan, the chance of delivering would have been higher than with full DU we could now be in a position to progress with the tunnel. There are other threads for peoples fantasy, no limitations projects, I think we need threads for DART+ and DART+ Tunnel to track what is actually happening, not just what people would like to see in an ideal world.
MyLove4Satan wrote: » ^^^ THIS The original plan was a CrossRail-like leviathan which hung everything on the 'Interconnector' while obvious solutions such as reopening the Phoenix Park Tunnel and the Metro connecting at Glasnevin Jct were not even considered. It was engineers drunk on Celtic Tiger money wanting the top possible system or nothing. I was glad when it was dropped.
IE 222 wrote: » I wouldn't be surprised to see the PPT been dropped or even been removed from electrification plans if this tunnel is highly likely to happen. The tunnel will surely revert back to the Drogheda - Hazelhatch and Maynooth - Greystones plans.
spacetweek wrote: » We can't keep changing plans. Can we just pick one plan and stick to it please?
SeanW wrote: » Why?
FrankN1 wrote: » When are they going to start work on the DART line to Maynooth?
IE 222 wrote: » Is there not meant to be a second consultation. I'd imagine there will be a number of alterations or at least confirmation of the unpopular aspects of the project going ahead. Has there been any information given back locally in terms of the level crossing closures.
Former Former Former wrote: » The second consultation was supposed to happen late last year, followed by the statutory consultation, leading to the railway order application being lodged around now. None of the above has yet happened so fair to say it's not off to a flyer...
Pete_Cavan wrote: » Are you sure there is to be a second consultation for DART+ West? I thought it would move to RO application now and the next consultation would be for DART+ South West (Kildare line).
Peregrine wrote: » Probably early 2023. The railway order application will be submitted towards the end of this year.
spacetweek wrote: » That's a huge slippage. It was supposed to be submitted end Q2, like in a couple of months.
IE 222 wrote: » That's if everyone gave the thumbs up at the first attempt. You'd be doing well to get a garden shed passed on the first attempt these days.
Former Former Former wrote: » It was a wildly ambitious (i.e. completely unrealistic) timetable. The second public consultation was supposed to happen in Q4 2020, but the first one was still ongoing in Q4. Even if everyone did give it a thumbs up, there would have been slippage. They were behind from day one and they have yet to publish a revised timetable. As an advertisement for IE's project management skills, it's not the best. And don't forget, there are some MASSIVE parts of the Maynooth line works which simply didn't feature in the first consultation. The second public consultation is likely to generate just as much interest as the first. If we see a railway order application lodged before 2023, I'll be surprised.
IE 222 wrote: » Well the NTA are in charge of it. It was only announced the end of August you're been very optimistic to think a project of this scale and cost will go through all the processes in number of months.
IE 222 wrote: » What massive parts where left out?
Former Former Former wrote: » I'm not optimistic at all, that's exactly my point. It absolutely cannot go through the processes in anything like the time allotted, that's why it's a bit of an indictment of the basic competency of whoever put it together. Delivering on the current plan requires time to flow backwards so I would rate its chances of going to schedule as fair to middling at best. That said, I am not a project management consultant so perhaps there is a way to disrupt the very fabric of space and time that the NTA are planning to use here. IIRC, there are protected bridge structures at Broombridge and Maynooth that are too low for the electric lines to pass under, plus a very complicated setup at Castleknock station, all of which were TBD in the first go-around.
Former Former Former wrote: » It was a wildly ambitious (i.e. completely unrealistic) timetable. The second public consultation was supposed to happen in Q4 2020, but the first one was still ongoing in Q4. Even if everyone did give it a thumbs up, there would have been slippage. They were behind from day one and they have yet to publish a revised timetable. If we see a railway order application lodged before 2023, I'll be surprised.
Zebra3 wrote: » https://www.rte.ie/news/dublin/2020/0831/1162347-woodbrook-dart-station/ New station PP gone in for between Shankill and Bray.
spacetweek wrote: » PP for Woodbrook was lodged back in autumn 2020. Looks like a decision was never made. Anyone got another update?
Peregrine wrote: » DART+ South West public consultation will start in the next week or so. Edit: Tomorrow