Jack Noble wrote: » WTF? What 'St Stephen's Green detour'?
Jack Noble wrote: » SSG has been planned as a major Metro/Dart interchange since 2001 when an expanded Dart network was put back on the agenda as part of PFC.
Jack Noble wrote: » Dart Underground was never going anywhere near College Green -- except in your head. Nor has it any need to because such a line would not serve the three major areas planners want to serve -- north Docklands and IFSC, south Docklands and Pearse/Trinity/Merrion Square, and the south city CBD centred around SSG.
Sam Russell wrote: » Picadilly is not the centre of London, and certainly not so convenient for the City. Crossrail will be their third attempt at it. Edit: According to TFL, the shortest time given for travel to Charing Cross, leaving at 8:00 am is 48 mins, with other options taking 52 mins. This includes quite a bit of walking (with suitcases) and does not include waiting time - so I stand by my hour time to get to central London. The Heathrow Express saves the four minutes and costs a fortune.
MYOB wrote: » You keep saying "more expensive route" like you've some proof there. You don't.
lxflyer wrote: » Gosh you could have fooled me about that. Piccadilly Circus is pretty central as far as I and most people would tell. As a regular traveller to/from London, I can stand over the 40 minutes time frame using the Heathrow Express. I've done it many times. The reality is that people are all going to different parts of the city, and Paddington is well connected through the Underground lines to facilitate that. They're not all going to the City of London area either. Paddington is directly connected to all the other major rail terminals by a single underground journey. I can't really see where else you could have routed the Heathrow Express to without incurring major additional cost and taking capacity into account.
Sam Russell wrote: » Distances to/from London are measured to/from Charing Cross, but Picadilly or Oxford Circus would, for Tourists, be considered central, but they are actually referred to as 'the West End' and so are not central. However, it is only minutes to go the further distance. Paddington is not that great an exchange point which is why they are reworking it. 48 mins via the Heathrow Express vs 51 min by Picadilly line is not much of an express route in my book and is not much less than an hour as to make much difference. At least going on the Picadilly line means no changes. A 15 min express ride followed by a 7 min walk does no rate in my book. However, the Dart spur, if used in conjunction with DU would be fantastic. Airport, Connolly - or - Airport, Spencer Dock, Pearse, Stephens Green, Christ Church, Heuston. Would beat the current service for most people.
strassenwo!f wrote: » It's a detour in the sense that it is a longer route than the obvious, direct, one.
Yes, we've been through that before Jack. We have no information that the DTO ever bothered to look at the DRRTS plan. It certainly didn't appear so in their (or IE's) presentation to ABP, for a railway order. We don't have any information that they ever, from their offices in St. Stephen's Green, looked at any routes apart from the potential one going through St. Stephen's Green, where they knew the LUAS was going to be stuck for at least a number of years.
College Green would seem to be on a pretty direct route between Heuston and the proposed Docklands station. I'd be surprised if this direct route wasn't considered, and as I show below, I'd like to know why it was discounted, especially if (as you earlier said) disruption wasn't a factor.
We don't (or at least I don't) know the other locations which the RPA were talking about, and about which ABP didn't ask, but can you let us assume that one of them was around College Green. Instead of the Heuston-Docklands route with a longer, more expensive St. Stephen's Green loop, a direct Heuston-College Green-Pearse Station-Docklands route might be feasible.
Such a route should certainly cater well for commuters heading to the Docklands, despite what you say, and for the Pearse/Trinity/Merrion Square area, also despite what you say.
And if you look at the figures for that direct route, it's quite interesting also in relation to the St. Stephen's Green angle (I'm not sure I've managed to get everything to fit onto the page, but I am grateful to the poster Monument for providing the detail). And he has kindly added the Metro North stops in, in purple: Jack, you should, I hope, be able to see here that the biggest area of high employment density in the city is directly between College Green and St. Stephen's Green, so there doesn't appear to be any advantage to building the considerably longer, more expensive, St. Stephen's Green route to cater for that high-density area.
While there is a high-density employment area in the north inner city, there is a considerably larger area of high-density employment, as shown on the map, in the south city. You referred to this above.
The problem with that high-density area in the south city, around the Harcourt Centre, Adelaide Road, etc., is that it is quite remote from the proposed St. Stephen's Green interchange, which it is allegedly intended to serve. Given that it is broadly around a kilometre from the proposed interchange, I think it's much more likely that people working there will change onto the LUAS (or a southbound metro, when it's eventually built).
Assuming, of course, that the transport bods in Dublin can eventually get their heads around the benefits of integrated ticketing. (Not a given, I know). But let's assume that they can. That high-density employment area around Hatch Street and Harcourt Street is absolutely not served by a station at St. Stephen's Green.
Folk who work in those areas will eventually be changing onto the metro or LUAS, whether the interchange is at College Green or St. Stephen's Green. From College Green versus St. Stephen's Green, an extra minute on the metro, or around an extra four on the LUAS.
Jack, you may think that it's an important factor to make their miniscule metro or LUAS trip that little bit shorter. I'm not convinced that I see this as a priority for Dublin, at this stage.
So, it does seem to be incorrect to say that commuters in the south city (ie around Hatch Street, Earlsfort Terrace, The Harcourt Centre) have a seriously better commuting option because of a circuitous, more expensive route via St. Stephen's Green. And I'm not convinced that the State benefits in any significant way by building this longer, more expensive route.
And then, we also need to look at the non-commuter traffic, which will sustain the proposed line throughout the day, between the commuting hours. There is nothing on the southside of St. Stephen's Green which can sustain retail or entertainment traffic to the extent that either side of College Green can.
All in all, for commuter traffic, and general traffic thoughout the day, what's going on in my crazy head is still saying College Green.
Shorter and cheaper, efficient for commuters to high-density working areas, and then also more efficient for people who want to get to major retail and entertainment areas.
lxflyer wrote: » Clearly quite a lot of people don't share your view as the service is well patronised.
Sam Russell wrote: » All public transport links in London are well patronised and many people going through Heathrow are not paying their own fare. Also, it is a big city and public transport is the only real option for many. HE cost £21 for a single journey to Paddington, while an off peak travel card zones 1-6 cost £8.90 all day. For 4 mins, I'll take the Picadilly line. For Dublin, a train connection is vital and the spur provides it at low (relative) cost. The future implementation of DU makes it a no-brainer so it should be done asap.
Sam Russell wrote: » However, the Dart spur, if used in conjunction with DU would be fantastic. Airport, Connolly - or - Airport, Spencer Dock, Pearse, Stephens Green, Christ Church, Heuston. Would beat the current service for most people.
Schadenfreudia wrote: » Any drawings of the DART spur - exact route? Any intermediate stations planned on the new bit or would it be an express?
Sam Russell wrote: » There is about 5km of railway across green fields with a couple of minor bridges and the M1 to cope with and a tunnel or elevated run into the airport. Either way it is a small project and could be done quickly. Whatever happens with DU, it would be a huge benefit to the airport. Express would be prefered since most passengers would be going into the city and have baggage.
Diego Simeone wrote: » Even Airport > Howth Junction > Connolly would be a great line. Extensions to Pearse and/or Heuston possible too.
1huge1 wrote: » Well technically with the usage of the Phoenix Park tunnel and the building of the spur to the airport, we could see trains from Cork even heading to Dublin airport. But the line would be too heavily congested to add too much to it. With the Dart Underground however, the effectiveness of a spur to the airport would greatly increase. Just by viewing the supposed line on google maps, it doesn't seem like a huge project. As has been said, its mostly greenfield.
Sam Russell wrote: » It is about 5km of track. It could be done in single track as a train will transverse it in less than 3 minutes when travelling at 90 km/hr. That would make it significantly cheaper to build. Only the M1 to cross apart from minor local roads. It really is a no-brainer.
markpb wrote: » Building single track on a new build seems like being cheap for no reason. It makes timetabling more difficult, it makes growing the service more challenging, it reduces operational flexibility and, worst of all, it threatens the operation of the existing dart line if there's a train or line failure on the branch. Build it properly or don't build it at all. Personally I still think it's a nice to have but I haven't seen any good justification for building it. The resulting service will be no better than the existing express bus services which are mostly being provided without any cost to the taxpayer. So after a chunk of capital expenditure and increased operational expenditure, we're not really any better off. Some people will benefit from a slightly shorter transfer but that's about it.
BonkeyDonker wrote: » Stick with me here but would it not be a good idea to make Dublin Airport a transport interchange. You could have the Dart Extension - lets give it a sexy name - say DartX, Metro North and LUAS - lets assume we win the Euro millions at the weekend - and extend the current LUAS at Broombridge as far as Swords, via the airport. DartX would be a double line detour of the existing Northern line so that all Dart services North of Connolly would visit the airport, greatly enhancing its usefulness to those from the North of the Country. The Metro North is Metro North, with all the goodness that brings, and the Luas extension from Broombridge would give-much improved access to Finglas/Swords/Rail-lines through Broombridge to the airport. However, it would also give much improved interchanges for non-airport travellers to other services, avoiding the current obsession that everything must go through the city center. While I'am sure there is some underlying flaw in my idea (I do not pretend to be some mystic planner) I do think it would greatly improve the practical use of public services in the North of the county/country.
1huge1 wrote: » Maybe I misunderstood you but are you saying all DART trips north of Connolly would go through the airport, what about Malahide and Portmarnock commuters who work in the city, I'm sure they wouldn't want their current commute extended to have to go by the airport, or have I misread your post. Sorry if I have. I like the DartX though :-)
1huge1 wrote: » I don't see why the Northern route cannot use the spur either without having to divert the entire line to serve the airport.
1huge1 wrote: » I just think from a commuting point of view, its just adding extra burden to getting to work in Dublin city centre in the morning.
1huge1 wrote: » But I'm no expert in the slightest. You could well be right.
spacetweek wrote: » Just build Metro North and possibly a one-line DART spur. Nothing else is needed in North Dublin.