BuzzFish wrote: » IMHO the speed limit is too high on the M50 at peak times. There are a large number of rear-enders (adding to congestion) due to traffic following too close at speed. If we can't educate people to keep a safe distance, then they need to be travelling slower. The M25 around london is an example of how a (variable) lower speed limit, can increase throughput.
AugustusMinimus wrote: » Should definitely be variable limits on the M50. 80kph during rush hours, 100kph for the rest of the day and 120kph during quiet hours.
Idbatterim wrote: » I was on the M50 southbound today about 8:30pm, the traffic is actually start stop on this newly upgraded at great expense motorway. Interchanges i.e. Tallaght, Ballymount etc still dont have the capacity to deal with the traffic! I hope this NX cross upgrade isnt at capacity or over it the minute it opens, which the M50 certainly appears...
Deleted User wrote: » The gantries are there, it's waiting for someone to decide to install the signals.
theholyghost wrote: » Any general update on how Newlands Cross is these days? Im supposed to hit it about 6 tonight heading for Dublin, is it a question of a few minutes extra delay or should I cut accross through Lucan to the M50 or give myself an extra 30 mins?
Jamie2k9 wrote: » What's the deal with the Yellow road markings on section of N7. We are gone very American all of a sudden Is it for night time drivers?
jd wrote: » At Newlands Cross? Indicates temporary road marking where there are roadworks.
Jamie2k9 wrote: » What's the deal with the Yellow road markings on section of N7.
spacetweek wrote: » Is this a new thing?
serfboard wrote: » I'm pretty sure I've seen this in Ireland before.
tonc76 wrote: » Brought in by Chapter 8 of Traffic Signs Manual 2010
8.2.5.17 In circumstances where it is necessary to highlight to road users the presence of roadworks and/or the temporary nature of the road surface, orange road markings may be used. These orange markings will be for centre line, edge lines, traffic lane lines, hatching and direction arrows with dimensions and their use as defined in Chapter 7.
jd wrote: » to wit
BuzzFish wrote: » Not a lot happening to date that's caught on the camera but we are starting to see activity towards the end of the clip. Missing a few dates due to niggles with my script pulling images (sorted now) and quality a bit reduced for now.
RichardoKhan wrote: » Hey Buzzfish You still compiling this video? Be really cool to see it up todate.
hi5 wrote: » When is this project expected to be completed?
eyeball kid wrote: » Is do you get to the area beside the Esso garage, Joels restaurant or that hotel now? They'll really be in trouble for the next year if normal passing traffic can't get to them. Hopefully the traffic won't be any worse than normal once people get use to the new layout.
tonc76 wrote: » There's an access lane to all of these from the N7 which brings you right to the petrol station entrance