Hi all,
I'm having a 4m x 5m garden office built at the moment (cavity wall construction).
My builder hasn't constructed my warm roof as per the detail I provided him (LABCwarranty.co.uk warm ventilated roof detail).
He hasn't completed the construction of the roof yet, is there any way of fixing it without having to strip off battens, insulation and the breather membrane he's put in the wrong place?
What he has done so far is (from underneath up):
- OSB3 deck.
- Breather membrane.
- Foil backed 100mm rigid insulation (joints are not taped).
- 1st layer of battens fixed through insulation into rafters.
There's 225mm x 50mm rafters underneath the OSB3 deck, could the VCL be installed here although I'll have spotlights and electrics running in this void.
The finish will be an EPDM membrane on top of the higher OSB3 layer.