Everyones going to jump into this thread thinking there is some magical update but there isn't. In the 2040 documents released by the government, this route is said to have adequate capacity and won't be touched, but since the rejigging of lights at the bridge in Castlemartyr it is jammed all day, and at 630pm on a Friday the jamups are back to the lake, 2.5km away from the lights.
I'm tempted to say Castlemartyr is now Irelands worst village bottleneck, in my mind it has now jumped above Claregalway and Adare as the most awful.
Its still baffling to me though how this section of the N25 feels overcapacity, has those two bottlenecks and yet isn't even on the cards to be touched before 2040. Bizarre?
Hopefully if a road opens I can look back on this post and say "It only took 20 years" or something like that.