serfboard wrote: » A sh1te road, in other words. Glad to see this, which has happened on a few of these realignments:
serfboard wrote: » Further along the N59, the "N59 West Of Letterfrack widening" project has resumed. You can see from Google Street View, where they are working. The wooden fence shows the new alignment. (Also visible on Google Satellite). It's only a short scheme as far as the entrance to the National Park (I'd estimate less than 1km), but they're taking out a serious bend, and doing some impressive rock cutting to do it. Looks like P&D Lydon have the contract.
DumbBrunette wrote: » The N59 Kilmeena realignment is finally nearing completion. Since construction work resumed after the lockdown the final surface has been laid and only the lines and cats eyes are still outstanding. No idea why this job has taken 18 months as opposed to the 12 months that was expected.
afatbollix wrote: » I heard it was the bridge by the road down to Buckfield. It kept collapsing or they couldn't keep water out of it or something.
marno21 wrote: » A ****e road, that was already realigned in the 90s! The old route will be partially used as an access route for housing and the rest used for cyclists and pedestrians. Very good to see as the existing road is quite dangerous for both with all the blind corners
HabibiLibneni wrote: » The offline alignment of the N60 Hill of Oran project is now open. The Ballymoe end of the works is still ongoing. This is a widening of the existing online road. It should be complete by August, I estimate.
DumbBrunette wrote: » Rare enough that we post regional road upgrades on this thread, but I got a nice pic today of a realignment project on the R312 north of Castlebar. Nephin mountain makes for a good backdrop
HabibiLibneni wrote: » I wasn't aware there was any upgrade of the Glenisland Road underway. What section is being upgraded and what length?
spacetweek wrote: » What Slane bypass?
shanec1928 wrote: » not sure if this falls into the list or belongs on the minor schemes but some small progress on this.https://www.sligococo.ie/N59/
HabibiLibneni wrote: » That's a separate road altogether, the N59 heading to Ballina. I know the Lugatober section is being designed at present and has planning permission. This section alongside Diffreen NS looks like an abandoned road project.
marno21 wrote: » Sorry HabibiLibneni, the post about the N59 was on the wrong thread so I moved it here. That post wasn't in reply to your one.