The key elements include six high speed charging hubs on motorways capable of charging eight vehicles simultaneously; 16 high speed charging hubs capable of charging four vehicles simultaneously; additional high power chargers at 34 current 50 kW locations; upgrading over 50 22 kW chargers to 50 kW, and replacing up to 264 locations with 528 charge points at the pre-existing pilot grade of 22 kW to next generation high reliability models.
Deleted User wrote: » At least with the AC points you can charge 2 cars, can't charge 2 with 1 DC even if it charges faster. 2 X 20 Kw DC would be better.
liamog wrote: » My understanding is that at least 50 of the existing of the existing 22kW chargers will be upgraded to 50kW.
Kramer wrote: » I know of two which were updated to 50kW DC this year - Nenagh & the M7 (B'OB Plaza - Monegall).
daheff wrote: » went to use the new charger in leixlip train station during the week.... but both the sockets were not working. So they replaced a working unit with one that wouldn't work. Sockets felt like there was a lock at the edges of the socket. Rang ESB and they couldn't fo anything... unit went offline on them as i was talking with them.
Stealthirl wrote: » Was that only upgraded this week ? cause it was not in any of there weekly announcements on Facebook.
Irishjg wrote: » Just wondering, has anyone used one of the ESB DC rapid chargers since fees were introduced on Monday. If so how did it work out for you in terms of the card and was there an activation fee on the machine or did you just have to pay for the kW you took. Does is charge per kW and round up to the next digit ie 10 11 12 etc etc or 10.25kW etc
Irishjg wrote: » Does is charge per kW and round up to the next digit ie 10 11 12 etc etc or 10.25kW etc
Dont be at yourself wrote: » Christ how miserly do you need to be to care about this?
Black_Knight wrote: » Loads have. No activation fee, this was never a thing. kW are to 3 decimal places. eg. 4.862 kWh
daheff wrote: » I'm sure its not miserly...more interested in the mechanics of how things work.
Deleted User wrote: » Tullow Co, Carlow , seriously ? that's funny Carlow Town is a lot larger LMAO
[Deleted User] wrote: » Tullow Co, Carlow , seriously ? that's funny Carlow Town is a lot larger LMAO
liamog wrote: » Meaning that most normal EVs will add between 45 and 90 km during an hour long shop. Basically making these worthless for people who don't have home chargers.
ted1 wrote: » You’d be mad to get an EV and not have a home charger.
mickdw wrote: » Whats the current situation re esb on street charging where I would be charging a phev that can only slow charge. I believe these standard chargers are remaining free for some time yet. Do I simply need to register as a payg customer to get on the system then charge free after that. the app is not so clear on how it works if you are availing of free charging
liamog wrote: » Meaning that most normal EVs will add between 45 and 90 km during an hour long shop.
unkel wrote: » LOL. The whole of County Carlow including the town has about 50k people in it. That's less than the village I live in (Lucan)
liamog wrote: » In Ireland yes, but that's because we don't have plenty of 50kW DC chargers available at every supermarket.