NRA have this morning advertised for engineering consultancy to design medium to long term solution to the junction!
:):)
Chris_5339762 wrote: » Is that actually going ahead though? I don't think its been doing as the package of immediate Dunkettle works, and is a totally disconnected thing which is very much will-it-wont-it.
Drax wrote: » Excellent news indeed... expect it in around 10 years. :pac:
Truckermal wrote: » Scrolled back to page 1 to see this sarcastic post....:D
marno21 wrote: » Tender out for Dunkettle Interchange upgradehttps://irl.eu-supply.com/ctm/Supplier/PublicPurchase/152980/0/0?returnUrl=ctm/Supplier/publictenders&b=ETENDERS_SIMPLE €120m estimate this time. Quite a jump.
Chris_5339762 wrote: » To be fair, they did get this published really quickly after the breakdown in the old tender.
highwaymaniac wrote: » I had a look at the documents on etenders - it is only the prequalification stage unfortunately - 5 contractors will be shortlisted. The form of contract selected is the standard public works design and build contract, I thought Sisk have developed the design, I wonder will they retender for it this time around?
• TII invited tenders for the main construction works design and build contract on Monday the 2nd of September 2019. • During the tender period for the main construction contract, a number of key advance work items will be progressed as referenced in recent updates. • Installation of a working platform to facilitate future embankment construction in the area near Bury’s Bridge will continue intermittently for a number of weeks. No disruption to traffic is anticipated in this area. • The permanent fencing works in the Gaelscoil Ui Drisceoill have been completed. • Ground investigation works will be getting underway over the next couple of days in an area west of the Pfizer plant. These ground investigation works are specific to Gas Networks Ireland transmission mains in the area and the purpose of the ground investigation works is to facilitate design of appropriate service protection works at this location. • Details of further advance work items will continue to be provided via this weekly newsletter.
Chris_5339762 wrote: » The weekly update from this week: I'm imagining they are wrong because highwaymaniac has actually read the tender.
Pete_Cavan wrote: » Who do you imagine are wrong and about what?
FUNDING for a proposed cycle link and pedestrian bridge over the South Ring Road into Tramore Valley Park will be sought by Cork City Council next year. Councillor Shane O’Callaghan has called on the local authority to seek funding streams from both the National Transport Authority (NTA) and Transport Infrastructure Ireland (TII) for the pedestrian footbridge linking the park to Grange and Frankfield.
marno21 wrote: » Government reaffirms commitment to Dunkettlehttps://www.irishexaminer.com/breakingnews/ireland/govt-absolutely-committed-to-delivering-dunkettle-interchange-upgrade-despite-delays-974139.html €250m, not sure where the figure is plucked from, would be absolutely scandalous though.
Cork Trucker wrote: » Is there an election on the way? :rolleyes:
marno21 wrote: » There was a press conference on Ireland 2040 today and one of the questions was on Dunkettle, hence the article.
Cork Trucker wrote: » Yeah i read the article and am hopeful that construction starts this year, however the possibility of an election is the next 6-8 weeks is what initially got me thinking. From a successful retender-contract signed-breaking ground, how long should that take ideally?
marno21 wrote: » Tender out for detailed topographical survey of the areahttps://irl.eu-supply.com/ctm/Supplier/PublicPurchase/160578/0/0?returnUrl=ctm/Supplier/PublicTenders&b=ETENDERS_SIMPLE
hans aus dtschl wrote: » Can anyone explain this: was it not already complete?
CHealy wrote: » Lots of clearance works the last week on the side by the old IBIS. Trees and ditches being cleared.
Mushy wrote: » Arent the slip roads from tivoli to n8 northbound and n8 southbaound to n25 east still being done anyway? Thought had read that somewhere
hans aus dtschl wrote: » Those and the cycleway are being built right now. It's not just preparatory clearance works. They've been sending photos of it in the mailout.