WishUWereHere wrote: » Those bollards You mention need to be erected asap. Crazy now with vehicles going right up to the off-ramp and at the last moment trying to squeeze back out.
WishUWereHere wrote: » Someone told me today that that off ramp is permanently going to be fed up to the Bundle Of Sticks ( BOS ) - true?
Darc19 wrote: » Where did you hear that rubbish.? Even a child looking at the work area there can see a roundabout is being built. Every drawing of the junction shows the roundabout and common sense would prevail too. Amazing how fake news is taken seriously by some people. On a separate point, was the M7 closed overnight at the weekend? Doesn't look like much was done at the m7/m9 merge.
WishUWereHere wrote: » I only asked if it is true or not, I don’t need to have my question being called fake news or rubbish. That was my first time using the new exit, so I had no idea what was the end product. If you cannot offer constructive replies, rather belt up.
Darc19 wrote: » It wasn't directed at you rather the fool that told you who probably heard it in a pub and took it as true and then starts telling everyone. But as I said, even a cursory look as you drove by would tell you it was utter rubbish.
WishUWereHere wrote: » It really doesn’t matter who your retort is aimed at, what gives you the right to be so arrogant and offensive in your replies. You know, the more you say the more you remind me of another know all named ceilingfly who used to be on here professing they knew everything & anything anyone said that disagrees with him/her was treated with contempt. And as I said I have used that off ramp once, and all I saw was a solid metal plate going across where (we all hope ) those heading for Toughers and Newbridge can turn.
Darc19 wrote: » I know feck all about roads but I know what a roundabout under construction looks like. I used to post on boards about 4 years ago and I went by my own name. I don't think this started back then and I worked nowhere near it, unless you regard Cork as near. Kinsale to be precise. You query was ridiculous and actually giving some credibility to someone for such a statement was ridiculous too.
WishUWereHere wrote: » For someone who says they work in Cork/Kinsale, you sure seem to know a lot about the Newbridge area & its environs. You still banteringon saying something is ridiculous, that’s seems how you operate. I thinkIwill just hit the i*nore button so we won’t cross paths.
Cazale wrote: » Builders holidays start next Monday for two weeks. Will the works on the upgrade be affected I wonder as they were stopped last year for the two weeks.
Eoghanj wrote: » I take the M9 exit, and to be honest, i cant see what work was done at the weekend
KBurke85 wrote: » I don't think overnight works took place. They were only going to happen of they were ready to do so. I drove by at 4am Sunday morning and nothing happening
BuzzFish wrote: » is that this is not an easy project and the sequential nature of the work causes delays very quickly when things go wrong. The amount they can do in parallel seems limited.
Deleted User wrote: » Not easy, no, but things like meeting Garda expectations should be planned well in advance and shouldn't have caused weeks of delay.
BuzzFish wrote: » Was chatting to a friend working for one of the main subcontractors and who is on site a lot and close to what's happening. They had some interesting stuff to say: - Fining has been triggered for delays on the widening since end of April and these are being split across almost all contractors. 3 lanes by end April, J9a by September, Sallins bypass by Jan was the plan. Fining is per day. An amount was mentioned but I'll not post publicly as I'm sure this is contractual. - Health & Safety has made the job infinately more complex. If this works work was being completed 10 years ago it would be done by now. - Gardaí forced a complete redesign of J9a days before the bridge demolition, after the use of the new ramps had been approved by siac/Colos h&s, the HSA, TIA, roadstone and others. Their argument was that 2 trucks could not navigate the roundabouts side by side at 60kph. This diverted huge number of crews/equipment to demolish and reallign the road (for 2 days while they knocked the old bridge) and put it back again after. This caused multiple knock on delays for weeks. - Distances from barrier to "live traffic" have been increased during daytime, forcing much work planned for daytime to overnight crews. Also mentioned multiple other incidents and issues that have cause delays as this new partnership of Colos & SIAC work through the project. Not my options above, just relaying information but a clear takeaway, for me, is that this is not an easy project and the sequential nature of the work causes delays very quickly when things go wrong. The amount they can do in parallel seems limited.
Darc19 wrote: » The road under the bridge was not changed - I travel it daily and would have noticed a change and gardai would have no expertise in this area.
jmkennedyie wrote: » I think the point about the Gardai refers to the slips that were used by the diverted traffic during bridge demolition...not the mainline under the bridge. Presumably original plan was 2 lanes up, join the partially constructed two lane roundabout on either end of new bridge, and two lanes back down. But after Gardai intervention they had to surface directly across middle of the new roundabouts to support 60kmph speeds.
benny79 wrote: » Are the 3 lanes not meant to be finished and open by the end of July? It was originally April. Do you reckon this will happen?
mosesgun wrote: » I can't see the southbound between J10 and the M9 turnoff being finished by the end of the month. The inside lanes are still really rough and they still appear to be laying pipes etc. Doesn't look like a few weeks work but maybe I'm wrong. Ive waited this long, a few more weeks won't kill me! Just hoping it has the desired effect traffic wise.