Bray Head wrote: » In general I'm supportive of the flat fare principle, with no reductions for short trips. But let's suppose it's €2.50 for 90 minutes, maybe €1.30 for kids. A trip in and out of city centre daytime at a weekend for a family of four comes to over €15. For most people (me included) that's well above breakeven point for driving. For me the price of a taxi to city centre is €12. For an evening out for two it's a toss-up already whether we take the bus or taxi given the door-to-door convenience and speed.
Bray Head wrote: » In general I'm supportive of the flat fare principle, with no reductions for short trips.
CatInABox wrote: » I've been monitoring the reaction to the 10 minute dart schedule in the thread on the commuting forum, and it has not been pretty at all. Capacity problem all over the place, trains delayed all the time, and knock on impacts on commuter trains all over the country. Part of it is possibly driver related, but a fair chunk of the problem seems to be a lack of dart carriages to maintain capacity, resulting in some trains running 4 carriages during rush hour. Seeing as the 10 minute dart schedule is a pretty big assumption of BusConnects, what impact do you think this will have? I can't see the problems being fixed by this time next year, as new carriages will have to be bought, something that will take years.
CatInABox wrote: » Seeing as the 10 minute dart schedule is a pretty big assumption of BusConnects, what impact do you think this will have? I can't see the problems being fixed by this time next year, as new carriages will have to be bought, something that will take years.
LeinsterDub wrote: » The government have 2 years to buy more trains. Capacity issue is very easily solved especially if they buy the hybrids and fast track the dart expansion
CatInABox wrote: » It's due to go out to tender late 2019 (which will probably be delayed), the tendering process could take years. BusConnects is meant to come in late 2019 (which, in fairness, will probably be delayed also)
Sam Russell wrote: » Actually, it would be better to say a 20% increase in the number taking the bus instead of the car would result in the buses travelling 10% quicker, and journey times being reduced by 6%. It might be worth pointing out that the 90 min fare would be significantly cheaper for most commuters. Also, the increased ridership should not threaten the fare box so subsidy is not increased. (If any of that is true).
LeinsterDub wrote: » Hearing 2020 on Twitter now.
hmmm wrote: » This and LUAS Cross city were the two big public transport initiatives this year. Neither were on the same scale as bus connects, and the NTA have to be lot to do to convince people why they should trust them.
bk wrote: » The refurbishment of the 2700 class should be coming online this year, start of next year, which should free up some other trains to come back to the Dublin region and add extra capacity.
CatInABox wrote: » They should really promote the health benefits of having an increased ridership on buses as well. For example, using totally made up figures: A 20% increase in the number of people using buses means X amount of cars taken off the roads, which will lead to Y reduction on the amount of lung cancers caused by pollution. A decrease in commuting times means that people will have a better work life balance, with more time with their kids
marno21 wrote: » The NTA have published a PIN for tender of a contract for Environmental Impact Assessment, Transport Impact Assessment and Construction Strategy for the 16 Core Bus Corridors announced earlier this year. Concept design for the 16 corridors is complete. Emerging Preferred Routes have been identified and will be put to non statutory public consultation in Q4 2018https://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=136601&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/publictenders
Qrt wrote: » So it'll be a while yet before we see the detailed proposals are released?
LXFlyer wrote: » You won’t see proposals to EIS detail this time around, but we should see what they are proposing in terms of bus gates, traffic restrictions and road widening (and indicative CPO activity), for each corridor. Whether they actually happen to the scale the NTA would like is another thing, as I suspect they will end up being subjected to many legal challenges where CPOs are involved. People also need to remember that the infrastructure element is a 10 year project unlike the network redesign, which was being proposed to be delivered without most of the infrastructure works being in place.
cgcsb wrote: » Once an airtight EIS is produced there is little legal recourse against a CPO. This is done all over the country to build motorways, and is noting new.
Qrt wrote: » I'm trying to think of the most difficult corridor planned, Kimmage most likely?
LXFlyer wrote: » It’s one thing for the NTA to come up with them, it’s another thing for the various councils to approve them (as they will have to), and there has been anything but smooth progress in that regard.
cgcsb wrote: » Many significant pinch points can be removed by next year though. For example on the blanch corridor, a one way Stoneybatter, a car free Old Cabra Rd and Prussia St and a car free North quays can be accomplished with hardly any construction work or CPOs, these changes alone can deliver easily 20 minutes journey time improvement on that corridor while providing a greater degree of reliability. Putting up flexible pollards around all QBCs at junctions, another small construction job = huge time savings. One way Rathmines = huge time savings. This won't provide 100% reliability but it'll be a vast improvement on the current system in the short term.
Qrt wrote: » Are they not going straight to An Bord Plean? NTA seem to think so...
LXFlyer wrote: » Where is there any evidence that the examples that you posted will be place next year? There isn’t and I think you need to stand back a bit from this.
cgcsb wrote: » Lol. It's a message board pal, not the UN. Chill out.
LXFlyer wrote: » There is absolutely no evidence that any of the things you listed above are going to happen in that short a timeframe.