Deedsie wrote: » That's a bit ridiculous, Ireland adopted the metric system a long time ago now. You would hope that all public transport services would do all their of their measures in metric.
Del.Monte wrote: » It always amazes me that CIE haven't changed the mileposts as they love squandering money, but I'm sure that they will get to it sooner or later with all the money they will save by the impending closures.
Deedsie wrote: » I agree, totally off topic... just jarring to see MPH as an official measurement in Ireland. I know you hear the odd person say miles per hour and refer to the price of something in pounds but in general it's metric all the way. No real need to get into a Metric v Imperial discussion here but I would imagine government policy would be that all units of measurement should be done by metric for consistency across the board.
goingnowhere wrote: » The DART is fully metric, speedo in the cab is in KPH and the datum markers on the OHLE are metric. The rest is imperial, which matches with Northern Ireland which helps. Will it make the trains run on time, nope so isn't worth discussingPart of the issue here is the signalling has a gap between the Mainline and Suburban systems, both have very limited visibility of whats happening on the other side so sequencing trains can be a problem, Suburban can see trains all the way to Belfast, but has almost nothing on whats coming through the tunnel All the drivers are Heuston, so aren't hugely familiar with the route and the complex routing around Connolly so things were a little cautious to start out with, driver training still ongoing
Deedsie wrote: » Well presumably they'd answer in Km's and not a unit of speed. km/h not kph.
GM228 wrote: » Suburban can't see all the way to Belfast (technically there's also no longer suburban by the way but still generally regarded as such), the limits they can see are an overlap with other signallers, the overlaps being just beyond Cabra, Malahide and Shankill. Beyond those points they can't see anything coming into their area of control until they are close to entering their area of control.
Sam Russell wrote: » I was amazed a few years ago to discover our plumbing is still in imperial units. Pipework is in inches so half inch pipe not 15mm. The UK has been metric for decades. That is why I was told plumbers tell you not to buy, and say they will not fit, plumbing supplies from B&Q. [The olives do not fit and will not work]. Strange but true.
roundymac wrote: » I think you'll find that you have that one assways. I'v been involved in construction for nearly 40 years and it's all metric we been using. All UK stuff is imperial.
n97 mini wrote: » And strangely enough Irish builders will still refer to things like "two be four", meaning 50mm x 100mm!
Carawaystick wrote: » Rough? or Planed? cos that'll be different dimensions again... Will IÉ be publishing their punctuality stats on the new route for November?
Paddico wrote: » Any know what happens when Boombridge Station opens. Will it be integrated?
Del.Monte wrote: » Paddico wrote: » Any know what happens when Boombridge Station opens. Will it be integrated? More importantly will you need to carry a sidearm.
Paddico wrote: » Ha ha ha .... sorry, dont get it :blink:
NiallBoo wrote: » Paddico wrote: » Any know what happens when Boombridge Station opens. Will it be integrated? Broombridge was never closed (in spite of its appearance at times). It just isn't on the the Phoenix park tunnel line, which runs further to the east. Luas cross-city will be running from broombridge when it opens.
Paddico wrote: » So that’s two major interchanges that are not integrated on the line. Heuston been the other. I know people on here will disagree but it really limits customers options of where they would like to go.
NiallBoo wrote: » I think people on here would agree with you completely.
spacetweek wrote: » BBridge will be integrated with the luas and can't be integrated with the PPT.
spacetweek wrote: » Neither are true.
NiallBoo wrote: » Yup, I mentioned that a few posts up. There were suggestions earlier in the thread that the Luas could have run a little further east and a station could have been added where the PPT line first(from Heuston) crosses the Dublin-Sligo line.
n97 mini wrote: » I'd love to see a London Underground style map of the Dublin SHZ rail "network" as is, and then with potential interconnecting stations added where lines cross or run side by side.